Muhammad Umair Khan, Assistant Manager (IT)

Muhammad Umair Khan

Assistant Manager (IT)

Board of Revenue Govt of Sindh, PMU (Land Administration Revenue Management Information System)

Location
Pakistan
Education
Master's degree, Telecommunication
Experience
16 years, 11 months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 11 months

Assistant Manager (IT) at Board of Revenue Govt of Sindh, PMU (Land Administration Revenue Management Information System)
  • Pakistan - Karachi
  • My current job since April 2014

 Supervise all daily and weekly IT operations, procedures, report directly to District Manager
 Design, Implement Preventive Maintenance for all IT hardware & software.
 Manage additional responsibilities including troubleshooting, file back-ups, regular updating, and retrival of data, as and when required.
 Checking daily back-ups, all system interfaces, Server hardware and logs.
 Supervision of Data Processing Assistants.
 Follow-up all claims that are being forwarded to IT Department.

Transmission Engineer at KONNECT HOLDEN (Pvt) Ltd. (Telenor Pakistan Operation Project)
  • Pakistan - Hyderabad
  • June 2013 to March 2014

 Responsible for Trouble Shooting Of NEC iPASOLINK Microwave Equipment (100/200/400/1000)
 Responsible for Trouble Shooting Of ZTE BTS (BS8700/BS8900A/W301) Commissioning and its integration to the BSC

Site Engineer at Advanced Technology Services (ATS). (Telenor Pakistan Implementation Project)
  • Pakistan - Hyderabad
  • April 2013 to June 2013

 Responsible for ZTE BTS (BS8700/BS8900A/W301) Installation Commissioning and its integration to the BSC \n Installation Commissioning & Trouble Shooting Of NEC iPASOLINK Microwave Equipment (100/200/400/1000)

BSS Engineer at MYSON ENGINEERING SYSTEMS. (Mobilink Pakistan Operation Project)
  • Pakistan - Hyderabad
  • March 2013 to April 2013

 Responsible for ALCATEL BTS Commissioning and its integration to the BSC \n Responsible for Operation and maintenance & trouble-shooting of BTS. \n Responsible for GSM KPIs, Worst Cell and Quality Issues \n Installation of Sectors and TRX (ALCATEL Equipment) \n Commissioning of SUMA Card (ALCATEL Equipment) \n Measuring VSWR and Clearing faults in Feder cable and Jumper through Site Master \n BTS Commissioning (Configure Microwave Links) \n Installation of STM1 Radio PASOLINK NEO (NEC Equipment) \n Testing of Installed Equipment.

NOC Engineer at KONNECT HOLDEN (Pvt) Ltd. (Telenor Pakistan Operation Project)
  • Pakistan - Hyderabad
  • August 2012 to February 2013

 Supervising Network Operation Centre South II. Mobilized teams for Corrective Maintenance \n Quarterly Messaging & Emails to Client for Updating 475 sites of Telenor Operation & Maintenance Status. \n Ensure Reporter of SLA. Coordinate between Telenor & Huawei / ZTE on different job assignment. \n Assign duties to Trouble Shooter & Service Personnel on daily basis. \n Maintain Technicians-Supervisor & NOC (Network Operation Center) duty roster. \n Discuss and resolve the sites issues with Telenor NOC (Network Operation Center) Islamabad.

NOC Engineer at PEOPLELOGIC PAKISTAN. (Telenor Pakistan Operation Project)
  • Pakistan - Hyderabad
  • September 2011 to July 2012

 Supervising Network Operation Centre South II. Mobilized teams for Corrective Maintenance \n Quarterly Messaging & Emails to Client for Updating 475 sites of Telenor Operation & Maintenance Status. \n Ensure Reporter of SLA. Coordinate between Telenor & Huawei / ZTE on different job assignment. \n Assign duties to Trouble Shooter & Service Personnel on daily basis. \n Maintain Technicians-Supervisor & NOC (Network Operation Center) duty roster. \n Discuss and resolve the sites issues with Telenor NOC (Network Operation Center) Islamabad.

IT Officer at Royal Institute of Medicine and Surgery
  • Pakistan - Karachi
  • March 2008 to August 2011

IT Operations

Transmission Engineer at SOLUTION & SERVICES (Pvt) Ltd. (Telenor & Ufone Pakistan Implementation Project)
  • Pakistan - Karachi
  • March 2007 to January 2008

 Installation, Commissioning & Trouble Shooting Of Microwave Equipments PDH, SDH & XPIC \n LOS & TSSR Surveys for Microwave Links \n Siemens SRAL Equipment (Telenor) \n NEC Equipment (Telenor & Huawei Ufone)

Education

Master's degree, Telecommunication
  • at Mohammad Ali Jinnah University Karachi
  • April 2010

Specialties & Skills

Commissioning
Installation
Integration

Languages

English
Intermediate