Total Years of Experience: 19 Years, 11 Months
May 2011
To Present
Maintenance/Mechanical Engineer
at Warble (Pvt) Limited
Location :
Pakistan - Multan
Manage all the maintenance work
• Manage all the emergency maintenance work done at all plants.
• Implement the preventive maintenance plan
• Keep in touch with the vendors and relating servicing companies.
Auto-Cad Designer
• Re-design and Modification of the machinery.
• Machinery parts designs such as gears, Sprockets, shafts, Pulleys and other maintenance equipments.
• Civil Structural, House plan drawings and Layouts
• Design of the Civil work Storage Tanks.
• Design of the Electrical panels.
• Plant 2D and 3D Modeling.
• Fire Fighting Hydrant Modification and re-positioning Design.
Fire Fighting/ Safety Supervisor
• Supervise the fire drill.
• Trained the staff relating to fire fighting.
• Inspect the earthing points and check the earthing resistance weekly basis.
Inventory Controller
• Prepare and maintain Stock register (M.S, exel and word reports)
• Prepare Annual formulation cost.
I.S.O. Audi tee Maintenance
• Prepare preventive maintenance plan(Annual and Monthly)
• Issue and supervise the work according to work permits (Cold, Hot and confined space work permits)
• Prepare in house calibration data sheet.
Installation of W.D.G. Plant
• Installation and commissioning of the new machinery.
• Estimate the electrical load and design the electrical panel. Installation of the new Electrical cable duct. Installation of the new earthing points.
• Supervise all the mechanical and civil work.
Civil Work Supervisor
• Supervise all the civil work done at new Logistics stores.
• Design and supervise all the civil work done at Zinc Storage Tank ( Dimension 53’ x 15’x13’
• Manage all the emergency maintenance work done at all plants.
• Implement the preventive maintenance plan
• Keep in touch with the vendors and relating servicing companies.
Auto-Cad Designer
• Re-design and Modification of the machinery.
• Machinery parts designs such as gears, Sprockets, shafts, Pulleys and other maintenance equipments.
• Civil Structural, House plan drawings and Layouts
• Design of the Civil work Storage Tanks.
• Design of the Electrical panels.
• Plant 2D and 3D Modeling.
• Fire Fighting Hydrant Modification and re-positioning Design.
Fire Fighting/ Safety Supervisor
• Supervise the fire drill.
• Trained the staff relating to fire fighting.
• Inspect the earthing points and check the earthing resistance weekly basis.
Inventory Controller
• Prepare and maintain Stock register (M.S, exel and word reports)
• Prepare Annual formulation cost.
I.S.O. Audi tee Maintenance
• Prepare preventive maintenance plan(Annual and Monthly)
• Issue and supervise the work according to work permits (Cold, Hot and confined space work permits)
• Prepare in house calibration data sheet.
Installation of W.D.G. Plant
• Installation and commissioning of the new machinery.
• Estimate the electrical load and design the electrical panel. Installation of the new Electrical cable duct. Installation of the new earthing points.
• Supervise all the mechanical and civil work.
Civil Work Supervisor
• Supervise all the civil work done at new Logistics stores.
• Design and supervise all the civil work done at Zinc Storage Tank ( Dimension 53’ x 15’x13’
June 2005
To June 2006
Production Supervisor
at Huffaz Seamless Pipe Industries
Location :
Pakistan - Karachi
Supervision all the work done on the Annealing Furnace.
Manage all the man power.
Documentation work on the computer.
Manage all the man power.
Documentation work on the computer.
Share on Facebook
Share on Twitter
Share Via Email