Venkatesh Kasi, Sr. Planning & Project Control Engineer

Venkatesh Kasi

Sr. Planning & Project Control Engineer

Al jaber Engergy Service LLC

Lieu
Émirats Arabes Unis - Abu Dhabi
Éducation
Master, MBA in Project Management
Expérience
21 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :21 years, 9 Mois

Sr. Planning & Project Control Engineer à Al jaber Engergy Service LLC
  • Émirats Arabes Unis - Abu Dhabi
  • Je travaille ici depuis mars 2024

● A Professional with 5 years of experience in underground tunneling and Metro Construction, Ten years in High Rise Building (3 years in Burj Khalifa Project), Four years in Oil & Gas Projects and 4 years in Infrastructure Projects, Extensive Overseas & Domestic Experience in Planning and Project Control, Estimation, Quantity Surveying, Sub Contract Management & Cost Control

● Comprehensive knowledge and exposure in Planning & Project Control Software like Primavera P6 project Management & Contract Management (Expedition), MS Project, Power BI, SAP, MS Office, AutoCAD, Tilos, BIM

● Expertise in managing entire breadth of Planning & Project Control Operation in various Metro Construction, High-Rise Buildings, Infrastructure Projects

● Proven Experience in implementing and customizing ERP Packages like SAP, PMIS, Oracle, Candy etc.

DGM - Planning à Chennai Metro Rail Limited (CMRL)
  • Inde - Chennai
  • juillet 2020 à février 2024

Phase-2 of Chennai Metro comprises construction of three lines covering 118.9 km to be built at a cost of INR 63, 296 crores with all three corridors. Construction of approximate Nine 118.9 Km of UG Tunnel / Elevated viaduct with 118 Stations in Corridor 3 - 45.8 km (Madhavaram - SIPCOT, Corridor 4 -26.1 km (Lighthouse - Poonamallee Bypass ), Corridor 5 - 47.0 km (Madahvaram - Sholinganallur)

Sr Planning & Cost Engineer à Alghanim International
  • Koweït - Al Koweït
  • mars 2017 à janvier 2020

• Developing the most appropriate method and sequence of construction activities, in conjunction with the Project Manager, in order to ensure the project to be completed on Time.

• Preparation of Baseline Master Programme with Resource Planning along with the resource Deployment ‘S’ Curve and the planned progress curves to monitor the project.

• Updating the Master Programme with the actual progress as and when required to preparation of Catch-up schedule and Recovery Programme.

• Preparation of Application for “Extension of Time” with the Delay event analysis to substantiate a right of contractor to get the Time Extension and coordinating with Commercial Department for substantiation of claims

• Preparation of progress measurement system to control the project on site with different distribution factor based on the activity weightage for each and every activities involved in the construction

• Coordination with the Major Sub Contractors with their Programme in line with the approved Base line Programme and incorporation into the Master Schedule for further Monitoring and controlling of the Activities

Sr Planning Engineer à Al Turki Enterprises LLC
  • Oman - Muscat
  • septembre 2013 à février 2017

• Review of Application of “Extension of Time” and coordinating with Commercial Department for substantiation of claims, Preparation of progress measurement system to control the project on site with different distribution factor for each and every activities involved in the construction

• Preparation of Baseline S Curve for different divisions like Overall, Engineering, Procurement, Construction and commissioning using the Primavera and Prepare the Report format to showing the planned percentage distribution for the entire construction period in both graphical and numerical ways
• Preparation of MIS Reports like MRS, WIP, Flash report, ED Statement, Claimed Vs Achieved Report and Monitering the Budget, Weekly/Monthly reports generation including ‘S’-curves for client & Management review, Cost control by Optimization of Resources utilization.

• Project S curves developed to monitor the project progress, showing planned, actual and forecasted data. The progress curve generated by rolling up from the lowest level. In addition, an overall manpower histograms developed showing planned manpower

• Construction Execution process, carried out regularly by CONTRACTOR, critically and analytically will provide effective control of the Project. The results of this process will be recorded in the review section of the monthly project progress and control report, which serves to inform COMPANY of the progress, the forecast the completion of the work and approved changes. The Progress review typically comprises the overall Progress, Planned

Asst Manager Planning à Sspdl Interserve Pvt Ltd
  • Inde - Chennai
  • décembre 2012 à septembre 2013

• Review of Application of “Extension of Time” and coordinating with Commercial Department for substantiation of claims, Preparation of progress measurement system to control the project on site with different distribution factor for each and every activities involved in the construction

• Preparation of Baseline S Curve for different divisions like Overall, Engineering, Procurement, Construction and commissioning using the Primavera and Prepare the Report format to showing the planned percentage distribution for the entire construction period in both graphical and numerical ways
• Preparation of MIS Reports like MRS, WIP, Flash report, ED Statement, Claimed Vs Achieved Report and Monitering the Budget, Weekly/Monthly reports generation including ‘S’-curves for client & Management review, Cost control by Optimization of Resources utilization.

• Project S curves developed to monitor the project progress, showing planned, actual and forecasted data. The progress curve generated by rolling up from the lowest level. In addition, an overall manpower histograms developed showing planned manpower

• Construction Execution process, carried out regularly by CONTRACTOR, critically and analytically will provide effective control of the Project. The results of this process will be recorded in the review section of the monthly project progress and control report, which serves to inform COMPANY of the progress, the forecast the completion of the work and approved changes. The Progress review typically comprises the overall Progress, Planned

Asst. Manager Planning à Larsen & Toubro
  • Inde - Chennai
  • décembre 2011 à décembre 2012

DEC-2015
• Company : Larsen & Toubro Location : Chennai, India Designation : Asst. Manager Planning Period : Apr 201 1 to Dec 2012

Sr. Planning Engineer à Samsung Corporation
  • Émirats Arabes Unis - Dubaï
  • décembre 2008 à décembre 2011

• Preparation of Primavera Program for Tender Schedule for different High rise building projects like, Burj Dubai Tallest Tower, Palm Jumeriah Village center, Nation Tower etc., contains -initial Level 3 construction programme. The Contract Programme contains the bar chart format showing link, critical path and total float for all activities.
• Preparation of Project Brief showing the Outline specification, scope of work, Condition of contract and Special conditions - This units contains the Project Description, Units and Floor details, Project Specification Bidding details, Liquated damages, Provisional Sum and Tender Qualifications
• Preparation of Horizontal breakdown of each trade or operation in chronological order of beginning of each item of work - Identification of each item of work by specification section number and by logically grouped activities - Identification of first work day of each item on horizontal time scale. Providing adequate spacing on programme for updating - providing complete sequence of construction by activity
• Project S curves developed to monitor the project progress, showing planned, actual and forecasted data. The progress curve generated by rolling up from the lowest level. In addition, an overall manpower histograms developed showing planned manpower
• Level 1 - Project management schedule - The Summary Schedule is limited in detail, it is developed in the form of a bar chart and is a summary of the Level 2 - Overall Project Schedule. It identifies start and completion dates for each phase of each subassembly of the project - Level 2 - Overall Project schedule - The Summary Schedule is limited in detail, it is developed in the form of a bar chart and is a summary of the Level 2 -

Planning Engineer à Al - Jaber & Partners
  • Qatar - Doha
  • novembre 2006 à décembre 2007

Preparation & Submission of Following
• Master Schedule including Progress Measurement, WBS Structure, Resource Loading etc.,
• Manpower Histogram
• Progress S Curve (Overall, Engineering,
Procurement, Construction and
Commissioning) for Planned, Forecast and
Actual
• Schedule and Progress Updates ( Monthly &
Weekly)
• Progress monitoring and control
• 90 days, 60 days and 15 days look ahead
schedule

Quantity Surveyor à Deccan Constructions
  • Inde - Tirunelveli
  • juin 1997 à mai 2003

• Take off Quantities for each structure as per
Detail Drawings and compare with the BOQ
• Daily Report for Quantities achieved and
Quantities to Complete
• Reality Check for Quantities in Base Drawings
and Revised Drawings
• Preparation of Bill and Invoice for Weekly and
Monthly Basis
• Quantity Progress Monitoring and Reporting

Éducation

Master, MBA in Project Management
  • à Alagappa University
  • mai 2012
Baccalauréat, B.E. in Civil Engineering
  • à Anna University
  • mai 2006
Diplôme, Diploma in Civil Engineering
  • à AICTE
  • avril 1997

Specialties & Skills

Planning
Microsoft Office
Primavera P6
MS Project
3Ds Max
PLANNING
PROJECT PLANNING
MS Excel
Auto Cad
MS Project
Candy CCS
Prima Vera P6

Langues

Anglais
Expert
Tamil
Expert
Hindi
Moyen

Adhésions

AICTE
  • Member
  • July 2004
Engineer Association Chennai
  • Member
  • January 2020

Formation et Diplômes

PMP (Formation)
Institut de formation:
CMTech
Date de la formation:
July 2019
P6 (Certificat)
Date de la formation:
January 2012
AutoCAD (Certificat)
Date de la formation:
April 1997
P3 (Certificat)
Date de la formation:
April 2002
Valide jusqu'à:
April 2002