VM Midhin, Electrical Coordinator

VM Midhin

Electrical Coordinator

Creating Project Templates

Location
India
Education
Bachelor's degree, Electrical &Electronics Engineering Bharathi Technical Engineering
Experience
6 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :6 years, 11 Months

Electrical Coordinator at Creating Project Templates
  • February 2015 to November 2015

, BIM Documents/Project Standards and follow
BIM implementation plan.
* Developing BIM models for Electrical and ELV services from design stage
(LOD 100) to construction level drawing (LOD 400).
* BIM Modelling of BUSBARS, LV & ELV Containment and MEP Coordination.
* Modelling of HVAC Systems, Fire Protection and Water Supply as per the
instructions.
* Preparation of Panel Schedules, Laying Conduits, Cable trays, Placing Light
Fixtures, Electrical Fixtures, Circuiting of Lighting and Electrical fixtures
creating Callouts, Sections on using proper Templates and worksets.
* Designing of Lighting, Power, Fire Alarm, ELV, AV and Data layout as per
instructions provided by Engineer.
* Creating and editing Parametric Families as per client requirement.
* Preparing Design drawing /Tender drawings, Shop drawings and Detail level
drawing as per LOD's (LOD 100 to LOD 400).
* Quality checking the sheets before delivery.
* Quantity take-off from model and preparing BOQ.
* Preparing Clash Report, Raising RFI’s and updating model error free.
* Frequent Clash Check on using Naviswork with in discipline and preparing
clash report and 4D Simulation.
* Leading and heading Team meeting with Clients to clarify and discuss about
the model and work flow.
Areas of Interest in BIM Services:
Facility Management Services Content Creation
Scan to BIM Dynamo / REVIT API’s
Professional Summary:
* ORGANIZATION: OMNIX INTERNATIONAL LLC

Electrical Coordinator at ALEC CONTRACTING
  • United Arab Emirates
  • March 2013 to December 2014

PROJECT HANDLED: Dubai Hills Mall Area 1 & Area 2 (Electrical & ELV services & MEP
Coordination) LOD 400.
* CLIENT OFFICE: ATKINS - DUBAI, UAE
PROJECT HANDLED:
* Qetaifan Hotel & Souq Project, Qatar (Preparation of Design & Shop Drawing) LOD 300 TO 350.
* Kifaf Residential Project, Uae (Electrical & ELV services & MEP Coordination) LOD 300 TO 350.
* CLIENT OFFICE: ADPi - DUBAI, UAE
* PROJECT HANDLED: Sharjah Airport Project (Extension) (Preparation of Design & Shop Drawing)
LOD 300 TO 350.
* CLIENT OFFICE: SSH - DUBAI DESIGNING DISTRICT, UAE
* PROJECT HANDLED: Shatti Hotel Project Qatar (Preparation of Design & Shop Drawing)
LOD 300 TO 350.
* CLIENT OFFICE: JACOBS - DUBAI, UAE
* PROJECT HANDLED: King Salman International Complex, Saudi Arabia (Electrical & ELV
services & MEP Coordination) LOD 300 TO 350.
* ORGANIZATION: BIM GLOBAL SOLUTIONS - BANGALORE INDIA LMITED

Visualizer at ADITYA CONSULTANTS
  • India
  • January 2012 to January 2013

Various Projects on Residential, Commercial, institutional & industrial
PROJECT DETAIL: Conceptual 3D Modeling and Rendering.

Education

Bachelor's degree, Electrical &Electronics Engineering Bharathi Technical Engineering
  • at College Thrissur
  • November 2020

in

Bachelor's degree, Electrical & Electronics Engineering
  • at Engineering College Thrissur
  • January 2010

(

Specialties & Skills

AutoCAD
3ds Max
Navisworks
3D MODELING
MODELING
RENDERING
CONSULTING
CUSTOMER RELATIONS
GRAPHIC DESIGN
MICROSOFT OFFICE
MICROSOFT WORKS

Languages

English
Expert
Hindi
Expert