Construction Project Manager
Confidential
Total years of experience :10 years, 3 months
• Initiating a successful modular construction methodology to 24 projected new showrooms + renovation showrooms in 2019.
• Scheduling construction packages for showrooms and small projects. also enforce the schedule and supervise the works and handover.
• Manage scoping, RFP and manpower teams which we enabled to assist in the construction
efforts to reduce construction cost.
• Assisted PMO to create an automated project management system through SAP, which facilitates approvals and entry for project management processes.
• Manage the design team that creates showroom, warehouses and offices designs.
• Design and executed the exhibition for SCC in Saudi Build 2018 and BIG 5 2018 in Dubai.
King Khalid International Airport terminal 3 & 4 Project:
• Assisting the Senior Project Manager in the management and administration of the construction contract package including day to day site inspection, approvals and inspection sign offs.
• Identify potential issues affecting construction progress and provide direction and solutions as to the means of avoiding and mitigating them.
• Monitoring the work performed, the material incorporated in the work, the materials stored at the site and the contractor's manpower, equipment and report.
• Assisting client in all aspects of the final acceptance of the work and close-out of all snag items/NCRs/etc. Including construction coordination minutes of meetings.
• Develop solutions for a variety of technical problems of moderate scope and complexity working under general supervision of the Technical Team Manager.
• Exercise independent judgement in evaluation, selection, and use of standard techniques, solve problems when encountered.
• Review designs, calculations, sketches, diagrams, schematic drawings, working drawings and As-Built Records.
• Prepare field sketches and develop details based on field conditions.
• Attend construction meetings and interfaces with the office design staff.
• King Khalid International Airport terminals 3 & 4 design review. support GACA for Terminal 5.
• Use of Saudi Building Code (Architecture & Fire Protection) & NFPA in all aspects of the project i.e. fire protection or architectural codes. Assistance to the contract manager with FIDIC contracts.
• Use the Runway & Airplanes operational requirements in all aspects of the airport design and runway manipulation.
• Provide project management for 354 ATMs.
• getting governmental licenses to operate ATMs, Branches and assist in Riyadh ANB Tower license.
• Manage Riyadh Tahliah street special ATM construction.
• Assist in architectural and interior design for new ANB tower in Alriyadh
• Design and create workshop drawing for the UNISCO main office’s reception room and reception desk.
• Participation in Architecture Ireland magazine (Presentation of XL Insurance company new building designed by RKD) \[Issue #270\].
Expected Graduation Date Oct 2021
-Competed in Mobile Booth Competition (1st) (Architecture Department). (2012) - Competed in Architecture Department Exhibition Space Design. (1st) (Architecture Department). (2013) - Competed in News Kiosk Design (2nd) (Architecture Department). (2011)