Area Engineer
Islamic Relief -Palestine Office
Total years of experience :17 years, 3 Months
• responsible for conducting needs assessment
• preparing bills of quantities for school
• preparing tender documents
• participating in selection of contractor
• preparing contracts
• supervising the implementation of the works by the contractors on the project sites
• keeping records of all project documents and preparing periodic reports on the project
• Construction of main Sewer Trunk Line -Industrial Zone In Hebron City about 2800 m (1500 mm Pipe Diameter) (1.600.000E)
• Pipe line Project(Rehabilitation of sewer Pipe line in Old city of Hebron ), Funded by Ministry of Finance. (692000 $)
With :-
length of 1678m of 30 mm transmission pipe
length of 1738 m of 1250 mm Diameter
construction of al Andalus girls basic school . Task included planning all complete tender documents as well as supervision. (2400 M2)
1. Pipe line Construction (Ramalah sewage overflow line), Funded by UNDP With length of 2400 m of 20” transmission pipe.
2. construction of 8” transmission pipe line in Al-Thahirya city funded by Action against Hunger (ACF).( transmission pipe line water From Sumoa-Thahirya) about 6 km
Internal roads in Dura city 4.5 km ), Funded by KFW.
Internal roads Alkom Village (1.7 km), Funded by KFW.
Construction of the bait al roush school
Rehabilitation Connecting and internal roads including RW and sidewalks in Bait Mirsim village(1.8Km) which Funded by United Nations Development Programme UNDP/PAPP