Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

sharique khan

FLM Engineer

Future Communications Conpany

Location:
Saudi Arabia - Riyadh
Education:
Bachelor's degree, Electronics Engineering
Experience:
16 years, 10 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  16 Years, 10 Months   

November 2011 To Present

FLM Engineer

at Future Communications Conpany
Location : United Arab Emirates - Dubai
• Responsible for Troubleshooting & rectification of BTS (2G-Nokia & 3G-Huawei) related faults.
• Installation & commissioning and troubleshooting of 3G/LTE BTS for Huawei & Nokia.
• Responsible for VVIP In building solution(IBS) sites including Dubai mall, Ibn batoota Mall, Mall of Emirates, Burj Al-Arab Hotel, Jumeirah Hotel, All ROTANA Group hotels etc & All Dubai metro stations.
• On IBS sites worked for both Active as well as passive solutions.
• Troubleshooting & rectification of alarms on various Huawei OSN & RTN including fiber as well as Hardware issues.
• Rectification of optical fiber fiber related faults using OTDR, Fiber optic meter & visiual fault locator.
• Possesses thorough knowledge of Installation, Commissioning, and Operations & Maintenance of Huawei Optical Equipments MUX-OSN3500, OSN1500.
• Troubleshooting & detection of faults in antenna, feeder, jumper or connectors with the help of VSWR meter.
• Commissioning of Nokia ultra, Metro, Flexi, Huawei RRU, Huawei BTS 3900 & Andrew Master units.
• Responsible for replacing ODU, & various cards in IDU(RTN 620 & RTN 950) & its integration.
• Microwave network O&M Monitoring, Maintenance, Configuration and troubleshooting MW equipment RTN620 and RTN950 using WebLCT, T2000 and U2000 softwares.
• Responsible for microwave(HOP) alignment for Nokia & Huawei ODU.
• Responsible for timely configuration from E1 to FXC STM, cross connections, FE, GE services (Data, Voice, multicast, VPN etc). /provisioning of network availability. Trouble-shooting of various transmission related faults with the Co-ordination of transmission team.
• The sole Responsiblity for alarm rectification of Andrew Solutions(ION-M) for IBS sites: Master unit(MU) & Remote unit(RU).
• The sole responsibility for alarm rectification of LGC solutions used in DAS for entire Dubai region.
• Installed co-axial RG6/RG11 cables & CAT5/CAT6 LAN cables for LGC DAS.
• Rectification of feeder faults by making feeder/antenna connectors.
• Rectification of IF cable faults by making IF cable connectors.
• Cross-connection in FIU, FIFA, RRI & Huawei RTN.
• Integration & troubleshooting of all External alarms & verification with the NOC.
• Uploading script & publish in Huawei BTS 3900 & run various commands.
• Providing a number of very important regular progress reports of the network on daily, weekly and bi-monthly basis to the higher management.
• Check VSWR & (AT) Acceptance test of BTS and microwave equipment and related works.
• Updating Traffic according to the BSC configuration.
• Making of Login cables of metro, flexi, ultra, FIU 19E & LGC solution.
October 2010 To November 2011

FLM Engineer

at GTL Limited LLC
Location : United Arab Emirates - Dubai
• Troubleshooting & rectification of alarms on various Huawei OSN & RTN including fiber as well as Hardware issues.
• Rectification of optical fiber fiber related faults using OTDR, Fiber optic meter & visiual fault locator.
• Possesses thorough knowledge of Installation, Commissioning, and Operations & Maintenance of Huawei Optical Equipments MUX-OSN3500, OSN1500.
• Troubleshooting & detection of faults in antenna, feeder, jumper or connectors with the help of VSWR meter.
• Commissioning of Nokia ultra, Metro, Flexi, Huawei RRU, Huawei BTS 3900 & Andrew Master units.
• Responsible for replacing ODU, & various cards in IDU(RTN 620 & RTN 950) & its integration.
• Microwave network O&M Monitoring, Maintenance, Configuration and troubleshooting MW equipment RTN620 and RTN950 using WebLCT, T2000 and U2000 softwares.
• Responsible for microwave(HOP) alignment for Nokia & Huawei ODU.
• Responsible for timely configuration from E1 to FXC STM, cross connections, FE, GE services (Data, Voice, multicast, VPN etc). /provisioning of network availability. Trouble-shooting of various transmission related faults with the Co-ordination of transmission team.
• The sole Responsiblity for alarm rectification of Andrew Solutions(ION-M) for IBS sites: Master unit(MU) & Remote unit(RU).
• The sole responsibility for alarm rectification of LGC solutions used in DAS for entire Dubai region.
• Installed co-axial RG6/RG11 cables & CAT5/CAT6 LAN cables for LGC DAS.
• Rectification of feeder faults by making feeder/antenna connectors.
• Rectification of IF cable faults by making IF cable connectors.
• Cross-connection in FIU, FIFA, RRI & Huawei RTN.
• Integration & troubleshooting of all External alarms & verification with the NOC.
• Conducting preventive maintenance & performance of battery test, external alarm checking & AC maintenance.
• Alarm testing, Quality of site and acceptance testing. Responsible for installation and testing of VRLA 48V, Battery Banks (HBL, Hays, North Star).
• Responsible for Installation and Acceptance Testing of 48V POWER PLANT (DELTA, ASCOM, EMERSOM and ELTEK).
• Troubleshooting on all power plants used in telecommunication.
• Full knowledge of various type of fire alarm systems & smoke detector & their control panels.
• To test various power plant, battery bank, DG & fire alarms & confirm the same with NOC.
• Experience of Infra on new site from pole/Delta/GBT to all electrical work in the shelter.
• Maintainance of all type of Air Conditioner including servicing, Gas pressure check & filling, compressor/motor change & control panel fault rectification.
• Uploading script & publish in Huawei BTS 3900 & run various commands.
• Providing a number of very important regular progress reports of the network on daily, weekly and bi-monthly basis to the higher management.
• Check VSWR & (AT) Acceptance test of BTS and microwave equipment and related works.
• Updating Traffic according to the BSC configuration.
• Making of Login cables of metro, flexi, ultra, FIU 19E & LGC solution.
May 2007 To October 2010

BSS Engineer

at bharti airtel
Location : India - Mumbai
• Responsible for Troubleshooting & rectification of BTS(2G & 3G) related faults.
• Troubleshooting & detection of faults in antenna, feeder, jumper or connectors with the help of VSWR meter.
• Commissioning of Nokia ultra, Metro, Flexi, Huawei RRU, Huawei BTS 3900 & Andrew Master units.
• Responsible for replacing ODU, & various cards in in IDU(RTN 620 & RTN 950).
• Responsible for microwave(HOP) alignment for Nokia & Huawei ODU.
• Trouble-shooting of various transmission related faults with the Co-ordination of transmission team.
• The sole Responsiblity for alarm rectification of Andrew solutions(ION-M).
• Andrew Solutions(ION-M) for IBS sites: Master unit(MU) & Remote unit(RU).
• Routing of E1 from BSC to the site.
• Working knowledge or hands on Huawei OSN.
• Rectification of feeder faults by making feeder/antenna connectors.
• Rectification of IF cable faults by making IF cable connectors.
• Cross-connection in FIU, FIFA, RRI & Huawei RTN.
• Uploading script & publish in Huawei BTS 3900 & run various commands.
• Providing a number of very important regular progress reports of the network on daily, weekly and bi-monthly basis to the higher management.
• Check VSWR & (AT) Acceptance test of BTS and microwave equipment and related works.
• Updating Traffic according to the BSC configuration.
• Making of Login cables of metro, flexi, ultra, FIU 19E & LGC solution.
• Configuring & connecting all external alarms and verification from local OMCR.
• Conducting preventive maintenance & performance of battery test, external alarm checking & AC maintenance.


 Equipments on Which Worked:
• Huawei BBU 3900(3G), RRU.
• Ultra, Flexi & Metro(2G).
• Transmission Equipments: RTN 620, RTN 950, FIFA & FIPA, FIU 19E, RRI.
• LGC solution for IBS sites: Main Hub, Expansion hub & RAU.
• Andrew Solutions(ION-M) for IBS sites: Master unit(MU) & Remote unit(RU).
• Optical fiber meter, Laser light tester, LAN cable Tester.
• Anritsu & BARD Site Master.

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
April 2007

Bachelor's degree, Electronics Engineering

at Nagpur University
Location : India - Nagpur
Completed my Degree at a Govt Seat.

Specialties & Skills

BSS, RF, IBS, microwave, ISP, BTS, Telecom, GSM, trnsmission, CDMA

Transmission

Optical Transmission

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Expert

Hindi

Expert

Urdu

Expert

Arabic

Intermediate

Marathi

Expert

Training and Certifications

Red/Green Line Access ( Certificate )

Issued in: June 2011

Loading
Loading...
Loading...