Project Engineer
Bilfinger Deutsch Babcock
Total years of experience :11 years, 8 months
Job title: Project Engineer: Dubal project
Project scope: Replacement of four HRSG (boilers) in Dubal power plant site.
Responsibility:
• Determine the activities to be done during the projects.
• Develop the project detailed schedule and determine the activities’ sequences.
• Estimate the durations required to perform the activities.
• Prepare weekly/Daily look ahead reports and weekly/Daily progress reports.
• Propose actions/ remedy in case of any delay/ Problems.
• Prepare the activities to be done during the night shift.
• Assign responsibilities and give the priorities to the critical activities.
• Identify potential risks and preparing mitigation actions.
• Act as site planner: monitoring and controlling the time schedule and man-hours.
• Attend meeting with clients.
• Participate on the periodic housekeeping: Make sure that the site is always clean.
Major achievement: Maintain the project on time schedule, and achieve a good customer satisfaction by providing a high work management.
Job title: Head of Proposal Department assistant
Responsibility:
• Read and determine the project scope of work.
• Prepare the summery of the project requirements.
• Prepare the bill of quantity of the material.
• Prepare work method for the projects. (small projects)
• Prepare line list.
• Prepare the project proposal (small projects): Prepare the project work method, prepare RFQs to suppliers and get prices, Estimate the man-hours to perform the job, Prepare initial Schedule.
• Arrange and attend meetings with clients.
Major Achievement: Support the HoD of proposal Department in big project by applying my engineering knowledge and prepare proposals for small projects.
• Established a planning system: organized the arrival time of tankers using tickets to control the the number of arrivals per hour.
• Participated in the program of customer satisfaction and losses reduction:
Minimized the sojourn time of tankers in the shipment department by 32%.
Reduced the resources by two without affecting the process.
Participated in the implementation of the project TAS (Terminal Automation System).
• Minimized the product wasted by the company: calculating the average product wasted by the company and suggesting some solutions to minimize and control it.
• Worked on ISO 9001: contributed to the implementation of the ISO 9001 in the factory.
• Worked on Suitability of traceability system for INDUSALIM C&P Branch.
Achievements:
• Shaping the pattern of flow of products and information.
• Shaping relations between traceability documents.
• Participated in the stock inventory.
• Assisted the stock manager of the company