Alarrab Contracting Co. (ACC)
Total years of experience :37 years, 4 Months
at King Abdullah Project, Arar KSA, responsible for supervision of mechanical works including Plumbing, HVAC and firefighting.
having responsibilities of client ( Owner, s ) representative for ACWA Holding group of companies, the project consisted construction of new offices at Alia Plaza, Riyadh.
I was responsible for construction, completion and handing over of all civil & electromechanical works under the scope of the contract in between contractor and the owner, s the parent company.
Followed technical and financial responsibilities to achieve the scheduled time frame for completion as planned. Resolved contractual issues for all related works upto the satisfaction of the client including work progress invoices, negative & positive variation work and its implementation.
I have worked in Arabian Pipeline Projects Company (APPCO) - Franchise of Toledo Arabia, KSA on, AL-Taif - Al-Baha Water Transmission system Pipeline project as
in Toledo Arabia contracting co. My responsibilities were to supervise installation of District Cooling Plant in Makkah, Saudi Arabia for the consultant SNC ll and client Saudi tabreed,
•Installation of Centrifugal Chillers.
•Execution of site work including piping for Chilled water and cooling water supply and return headers and branches connections to the chillers with valves and accessories..
•Installation of chilled water, cooling water and make up water pumps and piping connections.
•Erection of Cooling Tower.
•Preparation and getting approval of interim payments according to progress of work at site.
•Arrangement of material and supervision of fabrication, fit-up and welding of piping spool as per approved shop drawings, Isometric drawings and according to approved method statement.
•Raising RFIs to obtain work approvals from consultant at site.
I worked with Salam Consultants for CMW project section, responsible for the supervision of A/C and Mechanical system installations for the projects at different locations
to complete the installation of 1st chiller plants for Lusail Development including 3km piping network connected with different ETS, on an EPC contract with Marafeq Qatar ( District Cooling/Utilities Provider ).
•Supervised the projects of District Cooling System of M/S ‘tabreed’ District cooling Provider as a consultant in UAE.
•Worked with Salam Consultants for Command of Military Works project section, responsible for the supervision A/C and Mechanical system installations for the projects at different locations in UAE,
Worked in UAE Armed Forces, Directorate of Military Works
During above mentioned period, supervised installations of Central Air-Conditioning Systems including Chillers, Chilled Water Pumps, CS piping, Packaged Type Units, Fan Coil Units, Air-Handling Units, Fresh Air Systems, Fire Suppression system FM-200, EOT cranes, Elevators, Automatic shutter Doors, Fuel Tanks Operating System, Compressed Air System and Grease, Oil Pumps Systems installed in Washing Bay.
•From 1986 to 1992 I have worked in the maintenance department of
I was posted in Dubai and Northern Emirates Military Camps on same job responsibilities as mentioned in details of my experience in Al Salam
for District Cooling client. Pal Technologies.
Responsibilities
•Approval of shop drawings in accordance with hydraulic analysis.
•Approval of material.
•Site inspections for all related works of piping and valve chambers.
•Checking and evaluation of interim payments certificates.
•Correspondence with client and contractors.
•Resolving all technical issues and queries raised by the contractor up to the client’s satisfaction.
underground chilled water piping network, for District Cooling client. Pal Technologies.
•I have supervised the “Building Conversion” jobs from DX system to Chilled Water District Cooling System executed by M/S tabreed on the projects of T2, T3a & T4 in the premises of Sheikh Zayed Military City.(Sweihan) and Minhaad Air Base Dubai.
•My responsibilities in ‘tabreed’ projects were, inspection of various works including, underground CHW piping using HDPE rigid and flexible pipes, Butt Fusion and Electro fusion joints preparations, Polyurethane insulation according to specifications, preparation of valve pits and their accessories, chilled water MS piping, Installation of AHUS & FCUS, Energy Transfer Station ( ETS ) room’s work which have installation of chilled water pumps connected with heat exchanger and their PLC controls etc.
HVAC systems maintenance projects. ( Chillers, Packaged & Split type units
for the installation & maintenance of HVAC systems. ( Chillers, Packaged & Split Units )
Qatar), Responsible to complete the installation of 1st chiller plants ( 10 nos Air Cooled Chillers installed at 3 locations and connected with piping network ) for Lusail Development buildings ETS, including 3km piping network with Marafeq Qatar ( District Cooling Provider ) as an EPC contractor.
My responsibilities were as mentioned:
•Preparation of shop drawings according to site requirements.
•Obtain shop drawings and material approval.
•Monitoring procurement of material and delivery at site.
•Supervise the progress of construction work as per scheduled program of work.
•Conducting progress meetings briefing status of work to the client and discussions to resolve ongoing issues as per contract and specifications.
•Preparation of daily/weekly/monthly progress reports including two weeks look ahead schedule.
•Implement good safety at site during construction activities. Maintain regular HSE inspections and records.
•Preparation of monthly progress invoices and getting approval.
•Since July 2011, worked as Project Engineer for construction, installation & completion of Directorate of Military Works HQ building
My job responsibilities were the supervision of reticulation piping network of more than 100 Km, (project value-250 Million) for the client
I worked in Project section.Directorate of Military Works in UAE Armed Forces, my responsibilities were the supervision of the installation works of A/C and Mechanical equipment. My site locations were in the premises
responsible for the installation of District Cooling Plant at Jabal e Omer, Makkah project, with SNC ll and Saudi tabreed as client.
courses: /CERTIFICATION •Certificate of Qualification and Training arranged by Directorate of Military Works from LG Electronics by April, 2004. •Microsoft Certified Professional Certification (MCP) in Windows NT server and workstation in year 2000.