Zulkeffly Ahmad, Senior Manager, Projects

Zulkeffly Ahmad

Senior Manager, Projects

Teknik Janakuasa Sdn Bhd

Location
Malaysia
Education
Bachelor's degree, Electrical
Experience
27 years, 0 months

Share My Profile

Block User


Work Experience

Total years of experience :27 years, 0 months

Senior Manager, Projects at Teknik Janakuasa Sdn Bhd
  • Malaysia
  • My current job since January 2014

1. Directly reporting and assisting to Assistant Vice President.

2. Lead team members in participation of bidding exercises on O&M projects in power and desalination plant.

3. Ensuring business continuity in terms of technical, commercial, and on legal aspects.

4. Provide O&M bench marking and country analysis to compete in the bidding.

5. Overall provide competitive business acumen to the project involved

Manager at Powertek Berhad
  • Malaysia
  • June 2009 to December 2013

1. Directly reporting and assisting to Vice President Asset Management and indirectly to Chief Operating Officer.

2. Monitoring and supporting company's assets in their daily operation and maintenance activities.

3. Ensuring business continuity in terms of technical, commercial, and on legal aspects.

4. Ensuring for continuous meeting key performance targets.

5. Ensuring a safe working environment and practices towards minimizing/avoiding any potential risk.

Electrical Commissioning Engineer at YTL Power Services Sdn Bhd
  • Malaysia
  • June 2007 to July 2009

Experience Level: Total 17 Year (s) of Experience
Employment History
Company Name: Teknik Janakuasa Sdn Bhd (A whole subsidiary of Malakoff Corporation Berhad)
Position Title: Senior Manager, Projects
Position Level: Manager
Specialization: Corporate Strategy/Top Management
Industry: Utilities / Power
Duration: January 2014 - present
Monthly Salary: MYR 14.1K (gross)


1. Directly reporting and assisting to Assistant Vice President.

2. Lead team members in participation of bidding exercises on O&M projects in power and desalination plant.

3. Ensuring business continuity in terms of technical, commercial, and on legal aspects.

4. Provide O&M bench marking and country analysis to compete in the bidding.

5. Overall provide competitive business acumen to the project involved.


Company Name: Powertek Energy Sdn Bhd (formerly under Tanjong Energy Holdings Sdn Bhd)

Senior Technical Executive (Business & Development) at Powertek Berhad - HQ Office
  • December 2006 to May 2007

(Dec 06 - May07) Powertek Berhad - HQ Office - Senior Technical Executive (Business & Development)
- Assist VP (B&D) by conducting a study, research and feasibility for any business opportunities for the companies.
- Conduct an analysis for partners and competitors.
- Prepare Group's CEO report on updating regions of the world inclusive of Macro Country Updates, Macro Economic Indicators, Power Sector Update and Status of current projects.
- Establish networking with bankers, researches vide Research platforms i.e Global Insight, Bloomberg, Zawya, StanChart, etc.
- Perform benchmarking i.e on O&M cost with other Power Plants
- Update Country database from time to time.

Powertek Berhad - HQ Office - Senior Technical Executive at O&M Dept
  • June 2005 to December 2006

(Jun 05 - Dec 06) Powertek Berhad - HQ Office - Senior Technical Executive (O&M Dept)
- Assist VP (O&M) to review and monitor power plants operations and performance particularly on 3 power plants in Melaka with a total installed capacity of 1490MW.
- Assist VP (O&M) in the preparation of reports and paper pertaining to O&M activities of the plants.
- To maintain and update statistics of plant performance and technical information.
- To review Authority Approvals and Application of Approval for Purchase from stations.
- To assist VP (O&M) to ensure proper operationalization of the main agreements namely PPA, OMA, GSA, FSA and other agreements that the company may enter from time to time.
- To assist VP (O&M) on the reporting of power plants operations and maintenance activities and provide feedback accordingly.
- To create and update: a) Database of operational and financial statistics of the stations and industry benchmarks.
b) Database of all contacts regulatory, customer, industry players, etc.
- To establish networking with Authorities and relevant parties (TNB, IPPs, DOSH, DO& etc)
- To assist VP (O&M) in any ad-hoc assignments this may be assigned from time to time.

Commissioning Engineer at Power Plant Control
  • November 2001 to May 2005

Experience Level: Total 17 Year (s) of Experience
Employment History
Company Name: Teknik Janakuasa Sdn Bhd (A whole subsidiary of Malakoff Corporation Berhad)
Position Title: Senior Manager, Projects
Position Level: Manager
Specialization: Corporate Strategy/Top Management
Industry: Utilities / Power
Duration: January 2014 - present
Monthly Salary: MYR 14.1K (gross)


1. Directly reporting and assisting to Assistant Vice President.

2. Lead team members in participation of bidding exercises on O&M projects in power and desalination plant.

3. Ensuring business continuity in terms of technical, commercial, and on legal aspects.

4. Provide O&M bench marking and country analysis to compete in the bidding.

5. Overall provide competitive business acumen to the project involved.


Company Name: Powertek Energy Sdn Bhd (formerly under Tanjong Energy Holdings Sdn Bhd)

Kuala Sg. Baharu, Perlis, Malaysia - Warranty Engineer at ALSTOM Power Asia Pacific (M) Sdn Bhd - Perlis CCPP
  • February 2005 to May 2005

(Feb 05 - May 05) ALSTOM Power Asia Pacific (M) Sdn Bhd - Perlis CCPP, Kuala Sg. Baharu, Perlis, Malaysia - Warranty Engineer
- Perform day-to-day Warranty work on all system of Power Plant i.e. GT, ST, BOP, Electrical, Instrumentation and Civil.
- Perform an inspection before any validity of any warranty claims.
- Perform evaluation cost before proceeding with the work.
- Liase with owners of the system and issue an instruction to proceed with the warranty work.
- Liase/Meeting with Client before, during and after warranty work.
- Prepare Work Schedule and Work Permit
- Update Warranty database on weekly basis.
- Prepare report on weekly basis.

Bahrain - Commissioning Engineer at ALSTOM Power Asia Pacific (M) Sdn Bhd - ALBA Project
  • August 2004 to February 2005

(10 Aug 04 - Feb 05) ALSTOM Power Asia Pacific (M) Sdn Bhd - ALBA Project, Bahrain - Commissioning Engineer
Scope of work: - Engineering, installation and commissioning work for EC&I work.
- Monitoring subcontractor daily works during electrical/instrumentation cable installation.
- Commission HV transformers/black start generator
- Commission Electrical Switchgears
- Perform Red Correct for any Engineering work discrepancies.
- Liase with Client before, during and after each installation/commissioning work.
- Prepare report.

Bang Bo CCPP, Thailand - Commissioning Engineer at ALSTOM Power Asia Pacific (M) Sdn Bhd
  • August 2003 to August 2004

(11 Aug 03 - 20 Aug 04) ALSTOM Power Asia Pacific (M) Sdn Bhd - Bang Bo CCPP, Thailand - Commissioning Engineer
Scope of work: - Engineering, installation and commissioning work for Water Treatment Plant/RO System.
- Liase with supplier/contractor for the material specification and placing order.
- Liase with Design team if there is any discrepancies during installation.
- Liase with Client before and after each installation.
- Prepare schedule and report.

Dengkil, Selangor, Malaysia - EC&I Engineer at ALSTOM Power Asia Pacific (M) Sdn Bhd-Kuala Langat Power Plant
  • January 2003 to August 2003

(20 Jan 03 8 Aug 03) ALSTOM Power Asia Pacific (M) Sdn Bhd-Kuala Langat Power Plant, Dengkil, Selangor, Malaysia - EC&I Engineer
Scope of work: - Assisted in daily plant Operation and Maintenance work.
- Among other works are temperature transmitter/thermocouple calibration, flow and pressure transmitter replacement, silica gel replacement for main transformer, all kind of valves stroking and troubleshooting, Ph/conductivity meter calibration, default reading on POS, etc.
- Involved in inspections of twin filters of Nox water supply system, Gas Chromatograph validation, Emission Monitoring calibration, troubleshooting dc/ac motor problem, motor/breaker maintenance, fire alarm system checking, thermograph survey, control system cleaning and etc.
- A and B inspection work such VIGV calibration, Flame eye monitor check, cable check for bearing tunnel no. 1, ignition test, TAT connection check, carbon brush check, and Blow off valve isolation amplifier check.
- Performed simulation signal on PDAG and SK06 for some of the work. Study on possible signal which need to simulated before work can be carried out.
- Troubleshoot on crashed EDS20, Inverter fault (UPS) which resulted in GT tripped.
- Assisted in performing new wiring for a new signal and signal loop checked. Changes on Plausibility limits PWN, PWP for 15MBA30CT011R (TAT) on EDS20, conversion of all PFUPs to PDF format.
- Involved in Incident Review Meeting to discuss on solving on each incident.
- Involved in an internal training for P13/14 system.

Perlis CCPP, Kuala Sg. Baharu, Perlis, Malaysia - Commissioning Engineer at ALSTOM Power Asia Pacific (M) Sdn Bhd
  • September 2002 to November 2002

(5 Sept 02 30 Nov 02) ALSTOM Power Asia Pacific (M) Sdn Bhd - Perlis CCPP, Kuala Sg. Baharu, Perlis, Malaysia - Commissioning Engineer
Scope of work: - Responsible for Signals Loop Checks for Advant AC450 and AC160 system.
- Performed signals loop checks for Nodes11, 12, 13, (GTs) (partially), 14, 15, 16 (HRSGs), 17 (WSC), 18 (ST), and 19 (BOP/Electrical)
- Assist and troubleshooting for any problem signals at the I/O panel, marshalling panel, junction box and instrument itself.
- Performed supervision on pulling control cable and termination.
- Assist Comm. Team in performing of their commissioning of instruments.

I&C Comm. Engineer at ALSTOM Power Asia Pacific (M) Sdn Bhd
  • April 2002 to September 2002

- Report any discrepancies of any signals inside OS to responsible I&C Comm. Engineer.
- Performed NCR work for tremendous amount of job for Red Correx.

(21 April 02 - 04 Sept 02) ALSTOM Power Asia Pacific (M) Sdn Bhd -Perlis CCPP, Kuala Sg. Baharu, Perlis, Malaysia - Erection Engineer
Scope of work: - Responsible for Civil Works particularly for Building Services, Small Power and Lighting.
- Monitored and supervised contractor performed work on buildings from erection to completion as per AFC drawings.
- Monitored and supervised contractor on installation of cable conduits, distribution boards, wire terminations, telecommunication system, HVAC and split units, lighting, plant earth system and lightning systems. Also involved in installation of water tank and sewerage system.
- Performed testing and commissioning on air conditioning system, lighting, electrical power and water supply, plant earth and lightning system with the Client as a witness.
- Also monitored and supervised on construction of drainage system and cable pulling pits.
- Beside that, also assist in preparation for road access for transportation of Step-up and Service transformers.
- Performed progress meeting with contractor for the input of the Work.
- Performed weekly working schedule.
- Coordinate with Engineering team for any discrepancies of any drawings.

EVN Phu My Power Plant, Vietnam - Commissioning Engineer at ALSTOM Power Asia Pacific (M) Sdn Bhd
  • March 2002 to March 2002

(22 Mar 02 - 30 Mar 02) ALSTOM Power Asia Pacific (M) Sdn Bhd -EVN Phu My Power Plant, Vietnam - Commissioning Engineer
Scope of work: - Adjustment of control valves; stroke tests, diagnosis and removal of control pistons, flushing
- Checked Function Group of Lube Oil
- Motor-roll
- Water-spray test, purge test, fuel gas test, fuel oil test
- Setup DEPP and verify the HEX address inside EDS-P3
- Overall, commissioned GT13E2.

Dengkil, Selangor, Malaysia - EC&I Engineer at ALSTOM Power Asia Pacific (M) Sdn Bhd - Kuala Langat Power Plant
  • January 2002 to February 2002

(17 Jan 02 5 Feb 02) ALSTOM Power Asia Pacific (M) Sdn Bhd - Kuala Langat Power Plant, Dengkil, Selangor, Malaysia - EC&I Engineer
Scope of work: Check the status of MCR, diagnostic room and e-module room.
Check logic function of EDS20 for GT15.
Troubleshooting work for POS20 and other DCS hardware problem.
Preparing hardware setup for hot commissioning work.
Perform signal loop check as to assure the hot commissioning work is going smoothly.

Preparation for DEPP and Hi-Recorder at ALSTOM Power Asia Pacific (M) Sdn Bhd
  • December 2001 to December 2001

Preparation for DEPP and Hi-Recorder function as monitoring purposes.
Perform software conversion from EDS20 to Acrobat file.

(14 Dec 01 21 Dec 01) ALSTOM Power Asia Pacific (M) Sdn Bhd
- Comet Service Specific PPC Training in Switzerland

at ALSTOM Power Asia Pacific (M) Sdn Bhd
  • November 2001 to December 2001

(12 Nov 01 19 Dec 2001) ALSTOM Power Asia Pacific (M) Sdn Bhd
-Comet/ Service Generic PPC Training in Switzerland

DCS Engineer at Yokogawa Kontrol
  • December 1997 to October 2001

Position Title: DCS Engineer
Position Level: Senior Executive
Specialization: Engineering - Oil/Gas
Industry: Oil / Gas / Petroleum
Duration: Dec 1997 - Oct 2001
Monthly Salary: MYR 3.5K


Mainly performing Distributed Control System on commissioning and maintenance for Oil and Gas Sectors.

Skills
(Proficiency: Advanced - Highly experienced; Intermediate - Familiar with all the basic functionalities; Beginner - Just started using or learning the skill)

Skill Years Proficiency
I&C >5 Advanced

Senior Technical Executive



Year Position/Company Responsibilities

DCS Engineer at Yokogawa Kontrol (M) Sdn Bhd
  • December 1997 to October 2001

(Dec 97 Oct 01) Yokogawa Kontrol (M) Sdn Bhd -DCS Engineer
Responsibilities: - Gas District Cooling Expansion project, Putrajaya, for Petronas GDC (M) Sdn Bhd.
- Shutdown Maintenance Service work for VCM and PVC plants for Petronas Vinyl Chloride (M) Sdn Bhd.
- Shutdown Maintenance Service work for for KR2 plant for Petronas Penapisan (T) Sdn Bhd.
- Cakrawala Gas Field Development project, offshore Songkhla, Thailand (Carigali Triton Operating Company Sdn Bhd)
- Kerteh Vinyl Chloride Monomer, Onshore Kerteh. (Petronas Vinyl Chloride Monomer Chloride (M) Sdn BHd)
- Periodic Maintance work for KR1 plant for Petronas (T) Sdn Bhd
Gas District Cooling project, Putrajaya, for Petronas GDC (M) Sdn Bhd.

Scope of Work: -
- Prepare minute of meetings for all project meetings such as Kick-Off Meeting, Technical Clarification Meeting and Progress Meeting.
- Prepare Project Schedule and Project Progress Report.
- Review customers control/operation requirement/drawings to prepare the Distributed Control System (DCS) Functional Specification for System (DCS) Functional for system engineering generation works.
- Review customers bill of materials/engineering specification to prepare the Distributed Control System (DCS) Hardware and Software Specification for Order Processing.
- Prepare detailed design for control configuration, man machine interface and logging.
- Carry out generation, debugging, internal testing and other system related works.
- Conduct Factory Acceptance Test (Fat) and Site Acceptance Test (SAT) for Distributed Control System with customer.
- Coordinate with subsystem vendors and conduct Complete Integrated System Test (CIST)
- Provide Technical Support during Start-Up and Commissioning at site.
- Prepare the As-Built Drawings/Documents for Distributed Control System.
- Control and monitor hardware/software variation/changes and report on the cost impact and etc.
- Offer consultation to specific customer on the software configuration during the project-handling period.
- Start-up and commissioning DCS system.
- Carry out Modification Works as per customer requirement after Start-Up and Commissioning.
- Carry out maintenance work on the DCS system to maintain maximum optimisation of the system.
- Prepare the project documents following the companys ISO 9001 documentation procedure.

Proposal Engineer at Shapadu Energy & Engineering Sdn Bhd
  • April 1997 to December 1997

(Apr 97 Dec 97) Shapadu Energy & Engineering Sdn Bhd - Proposal Engineer
Project: 1. Kelantan LPG Bottling Plant Project, Pantai Senak. (Keloil Sdn Bhd)
2. Mogas Cargo Pipeline modification project (Petronas Dagangan Berhad)

Scope of Work
- Prepare General Estimating Work, MATERIAL Quantity Take-off & Costing.
- Prepare Technical and Commercial Proposals for bidding project purposes.
- Producing Weekly/Monthly Project Cost Report which consists of Original Budget,
- Revised Budget, Actual Budget, Committed Cost, Incurred Cost and Projection Cost.
- Review Project Bidding Documents and Project Contract Documents from customers.
- Produce Project Contract Documents for subcontractors and vendors.
- Review Invitation to bid (ITB) drawings and approved for construction (AFC) drawings for any cost impact and produce Technical Bid evaluation/analysis.
- Check invoices from subcontractors and vendors before approving for payment.
- Prepare invoices to be billed to customers.
- Liase with other departments, subcontractors, vendors and customers regarding any Project Contractual matters.

Manager, Asset Management International at Powertek Energy Sdn Bhd
  • to

Experience Level: Total 17 Year (s) of Experience
Employment History
Company Name: Teknik Janakuasa Sdn Bhd (A whole subsidiary of Malakoff Corporation Berhad)

Senior Manager, Projects at Asset Management International
  • to

Position Title: Senior Manager, Projects
Position Level: Manager
Specialization: Corporate Strategy/Top Management
Industry: Utilities / Power
Duration: January 2014 - present
Monthly Salary: MYR 14.1K (gross)


1. Directly reporting and assisting to Assistant Vice President.

2. Lead team members in participation of bidding exercises on O&M projects in power and desalination plant.

3. Ensuring business continuity in terms of technical, commercial, and on legal aspects.

4. Provide O&M bench marking and country analysis to compete in the bidding.

5. Overall provide competitive business acumen to the project involved.


Company Name: Powertek Energy Sdn Bhd (formerly under Tanjong Energy Holdings Sdn Bhd)

Manager, Asset Management International at YTL Power Services Sdn Bhd
  • to

Position Title: Manager, Asset Management International
Position Level: Manager
Specialization: Corporate Strategy/Top Management
Industry: Utilities / Power
Duration: June 2009 - December 2013
Monthly Salary: MYR 10K (gross)


1. Directly reporting and assisting to Vice President Asset Management and indirectly to Chief Operating Officer.

2. Monitoring and supporting company's assets in their daily operation and maintenance activities.

3. Ensuring business continuity in terms of technical, commercial, and on legal aspects.

4. Ensuring for continuous meeting key performance targets.

5. Ensuring a safe working environment and practices towards minimizing/avoiding any potential risk.

Company Name: YTL Power Services Sdn Bhd

Manager, Asset Management International at Powertek Berhad
  • to

Position Title: Manager, Asset Management International
Position Level: Manager
Specialization: Corporate Strategy/Top Management
Industry: Utilities / Power
Duration: June 2009 - December 2013
Monthly Salary: MYR 10K (gross)


1. Directly reporting and assisting to Vice President Asset Management and indirectly to Chief Operating Officer.

2. Monitoring and supporting company's assets in their daily operation and maintenance activities.

3. Ensuring business continuity in terms of technical, commercial, and on legal aspects.

4. Ensuring for continuous meeting key performance targets.

5. Ensuring a safe working environment and practices towards minimizing/avoiding any potential risk.

Company Name: YTL Power Services Sdn Bhd
Position Title: Electrical Commissioning Engineer
Position Level: Senior Executive
Specialization: Engineering - Electrical
Industry: Utilities / Power
Duration: June 2007 - June 2009
Monthly Salary: MYR 20K-25K


CaMau 1, Vietnam - As Shift Charge Engineer. Monitoring and Controlling the daily operation of CaMau1 CCPP, Veitnam for Siemens AG.

Chana CCPP, Songhkla, Thailand - As HRSG Comissioning Engineer for 3 stages boilers for Siemens AG.

Al-Nasseriah CCPP, Syria- As I&C Trainer for Siemens AG.

Company Name: Powertek Berhad

Commissioning Engineer, Power Plant Control at Alstom Power Asia Pacific
  • to

Experience Level: Total 17 Year (s) of Experience
Employment History
Company Name: Teknik Janakuasa Sdn Bhd (A whole subsidiary of Malakoff Corporation Berhad)
Position Title: Senior Manager, Projects
Position Level: Manager
Specialization: Corporate Strategy/Top Management
Industry: Utilities / Power
Duration: January 2014 - present
Monthly Salary: MYR 14.1K (gross)


1. Directly reporting and assisting to Assistant Vice President.

2. Lead team members in participation of bidding exercises on O&M projects in power and desalination plant.

3. Ensuring business continuity in terms of technical, commercial, and on legal aspects.

4. Provide O&M bench marking and country analysis to compete in the bidding.

5. Overall provide competitive business acumen to the project involved.


Company Name: Powertek Energy Sdn Bhd (formerly under Tanjong Energy Holdings Sdn Bhd)

Manager, Asset Management International at Power Plant Control
  • to

Position Title: Manager, Asset Management International
Position Level: Manager
Specialization: Corporate Strategy/Top Management
Industry: Utilities / Power
Duration: June 2009 - December 2013
Monthly Salary: MYR 10K (gross)


1. Directly reporting and assisting to Vice President Asset Management and indirectly to Chief Operating Officer.

2. Monitoring and supporting company's assets in their daily operation and maintenance activities.

3. Ensuring business continuity in terms of technical, commercial, and on legal aspects.

4. Ensuring for continuous meeting key performance targets.

5. Ensuring a safe working environment and practices towards minimizing/avoiding any potential risk.

Company Name: YTL Power Services Sdn Bhd
Position Title: Electrical Commissioning Engineer
Position Level: Senior Executive
Specialization: Engineering - Electrical
Industry: Utilities / Power
Duration: June 2007 - June 2009
Monthly Salary: MYR 20K-25K


CaMau 1, Vietnam - As Shift Charge Engineer. Monitoring and Controlling the daily operation of CaMau1 CCPP, Veitnam for Siemens AG.

Chana CCPP, Songhkla, Thailand - As HRSG Comissioning Engineer for 3 stages boilers for Siemens AG.

Al-Nasseriah CCPP, Syria- As I&C Trainer for Siemens AG.

Company Name: Powertek Berhad
Position Title: Senior Technical Executive
Position Level: Senior Executive
Specialization: Engineering - Electrical
Industry: Utilities / Power
Duration: June 2005 - May 2007
Monthly Salary: MYR 5K


I joined Operation & Maintenance department in 1 June 2005 and assisting Vice President in monitoring 3 power plants with a total installed capacity of 1490MW; all are located in Melaka, Malaysia in terms of daily operation & maintenance.

However, in December 2006, I have been transferred to Business Development department and my new work scope is among others as perform analysis on any potential business opportunities, do power plant bench marking, competitors analysis etc.

Company Name: Alstom Power Asia Pacific

Manager, Asset Management International at Yokogawa Kontrol
  • to

Position Title: Manager, Asset Management International
Position Level: Manager
Specialization: Corporate Strategy/Top Management
Industry: Utilities / Power
Duration: June 2009 - December 2013
Monthly Salary: MYR 10K (gross)


1. Directly reporting and assisting to Vice President Asset Management and indirectly to Chief Operating Officer.

2. Monitoring and supporting company's assets in their daily operation and maintenance activities.

3. Ensuring business continuity in terms of technical, commercial, and on legal aspects.

4. Ensuring for continuous meeting key performance targets.

5. Ensuring a safe working environment and practices towards minimizing/avoiding any potential risk.

Company Name: YTL Power Services Sdn Bhd
Position Title: Electrical Commissioning Engineer
Position Level: Senior Executive
Specialization: Engineering - Electrical
Industry: Utilities / Power
Duration: June 2007 - June 2009
Monthly Salary: MYR 20K-25K


CaMau 1, Vietnam - As Shift Charge Engineer. Monitoring and Controlling the daily operation of CaMau1 CCPP, Veitnam for Siemens AG.

Chana CCPP, Songhkla, Thailand - As HRSG Comissioning Engineer for 3 stages boilers for Siemens AG.

Al-Nasseriah CCPP, Syria- As I&C Trainer for Siemens AG.

Company Name: Powertek Berhad
Position Title: Senior Technical Executive
Position Level: Senior Executive
Specialization: Engineering - Electrical
Industry: Utilities / Power
Duration: June 2005 - May 2007
Monthly Salary: MYR 5K


I joined Operation & Maintenance department in 1 June 2005 and assisting Vice President in monitoring 3 power plants with a total installed capacity of 1490MW; all are located in Melaka, Malaysia in terms of daily operation & maintenance.

However, in December 2006, I have been transferred to Business Development department and my new work scope is among others as perform analysis on any potential business opportunities, do power plant bench marking, competitors analysis etc.

Company Name: Alstom Power Asia Pacific
Position Title: Commissioning Engineer, Power Plant Control
Position Level: Senior Executive
Specialization: Engineering - Electrical
Industry: Heavy Industrial / Machinery / Equipment
Duration: Nov 2001 - May 2005
Monthly Salary: MYR 15K


As a Commissioning Engineer, I have travelled around the globe as an I&C specialist and to commission power plants. I also have an extensive experience in engineering, construction and warranty period of power plant.

Company Name: Yokogawa Kontrol (M) Sdn Bhd

Manager, Asset Management International at Chana CCPP, Thailand
  • to

Position Title: Manager, Asset Management International
Position Level: Manager
Specialization: Corporate Strategy/Top Management
Industry: Utilities / Power
Duration: June 2009 - December 2013
Monthly Salary: MYR 10K (gross)


1. Directly reporting and assisting to Vice President Asset Management and indirectly to Chief Operating Officer.

2. Monitoring and supporting company's assets in their daily operation and maintenance activities.

3. Ensuring business continuity in terms of technical, commercial, and on legal aspects.

4. Ensuring for continuous meeting key performance targets.

5. Ensuring a safe working environment and practices towards minimizing/avoiding any potential risk.

Company Name: YTL Power Services Sdn Bhd
Position Title: Electrical Commissioning Engineer
Position Level: Senior Executive
Specialization: Engineering - Electrical
Industry: Utilities / Power
Duration: June 2007 - June 2009
Monthly Salary: MYR 20K-25K


CaMau 1, Vietnam - As Shift Charge Engineer. Monitoring and Controlling the daily operation of CaMau1 CCPP, Veitnam for Siemens AG.

Chana CCPP, Songhkla, Thailand - As HRSG Comissioning Engineer for 3 stages boilers for Siemens AG.

Al-Nasseriah CCPP, Syria- As I&C Trainer for Siemens AG.

Company Name: Powertek Berhad
Position Title: Senior Technical Executive
Position Level: Senior Executive
Specialization: Engineering - Electrical
Industry: Utilities / Power
Duration: June 2005 - May 2007
Monthly Salary: MYR 5K


I joined Operation & Maintenance department in 1 June 2005 and assisting Vice President in monitoring 3 power plants with a total installed capacity of 1490MW; all are located in Melaka, Malaysia in terms of daily operation & maintenance.

However, in December 2006, I have been transferred to Business Development department and my new work scope is among others as perform analysis on any potential business opportunities, do power plant bench marking, competitors analysis etc.

Company Name: Alstom Power Asia Pacific
Position Title: Commissioning Engineer, Power Plant Control
Position Level: Senior Executive
Specialization: Engineering - Electrical
Industry: Heavy Industrial / Machinery / Equipment
Duration: Nov 2001 - May 2005
Monthly Salary: MYR 15K


As a Commissioning Engineer, I have travelled around the globe as an I&C specialist and to commission power plants. I also have an extensive experience in engineering, construction and warranty period of power plant.

Company Name: Yokogawa Kontrol (M) Sdn Bhd
Position Title: DCS Engineer
Position Level: Senior Executive
Specialization: Engineering - Oil/Gas
Industry: Oil / Gas / Petroleum
Duration: Dec 1997 - Oct 2001
Monthly Salary: MYR 3.5K


Mainly performing Distributed Control System on commissioning and maintenance for Oil and Gas Sectors.

Skills
(Proficiency: Advanced - Highly experienced; Intermediate - Familiar with all the basic functionalities; Beginner - Just started using or learning the skill)

Skill Years Proficiency
I&C >5 Advanced

Senior Technical Executive



Year Position/Company Responsibilities
(June07-June 09) YTL Power Services Sdn Bhd - Electrical Commissioning Engineer.
- CaMau 1 CCPP, Vietnam - as Shift Charge Engineer
- Chana CCPP, Thailand - as HRSG Commissioning Engineer
- Al-Nasseriah CCPP, Syria - as I&C Trainer

Education

Bachelor's degree, Electrical
  • at Pennsylvania State University

Qualification: Bachelor's Degree Field of Study: Engineering (Electrical/Electronic) Major: Electrical Institute/University: Pennsylvania State University, United States CGPA: 3.1/4 Graduation Date: 1997

Doctorate, Electronic
  • at Durham College of Applied Arts and Technology

Qualification: Advanced/Higher/Graduate Diploma Field of Study: Engineering (Electrical/Electronic) Major: Electronic Institute/University: Durham College of Applied Arts and Technology, Canada CGPA: 3/4 Graduation Date: 1996

Bachelor's degree, Electrical Engineering

B.Sc. Electrical Engineering, USA Diploma of Electronic Engineering, Canada Diploma of Computer Engineering, Canada

Specialties & Skills

ASSAY SYSTEM
COOLING
DOCUMENTATION
ENGINEER
LOGGING
MAINTENANCE
PETROLEUM
PROGRESS
TESTING

Languages

English
Beginner
Malay
Beginner