Substations projects manager
Trading & Development Partnership
Total years of experience :25 years, 11 Months
May 2016 until now : Trading and Development Partnership CO KSA
• Project Manager for Al Majmah Substation 7212 S/S 33 /13.8 KV
• Project Manager for projects (S/S 9014 Alsafa .S/S 9026 Sultana & S/S 9028 Al kharj (Telecom&protection )
• Project Manager for King Faisal Substation 8287 S/S 132/13.8 KV
February. 2011− May 2016: Egyptian Electricity Transmission Co ARE
• Senior Testing and Protection Engineer For Egyptian Electricity Co for southern region ARE
SEPTEMBER. 2006 - 2011 :ALFANAR Company(DAR ENGINEERING )Jeddah, KSA
• Senior Testing and Commissioning Engineer for SAUDI ELECTICITY COMPANY for Western & Southern Region KSA.
Successfully worked with different protection philosophies of transmission network.
Have wide knowledge and experience on maintenance and commissioning of several types of protection and metering equipments in 500/220/132/110/66/33/13.8/11 KV transmission/ distribution network. Tested several types of numerical relays by using computerized test sets such as FREJA300 and OMICRON CMC256.
Have experience in checking of protection scheme & protection drawings and modification of protection/metering schemes.
Successfully managed/ supervised the installation and commissioning activities at different sites and managed several modification works in different live substations.
Have good experience on fault analysis and preparing abnormality reports.
Have very good Computer knowledge.
Successfully worked with different protection philosophies of transmission network. Have wide knowledge and experience on maintenance and commissioning of several types of protection and metering equipments in 500/220/132/110/66/33/13.8/11 KV transmission/ distribution network. Tested several types of numerical relays by using computerized test sets such as FREJA 100 and OMICRON CMC256. Have experience in checking of protection scheme & protection drawings and modification of protection/metering schemes. Successfully managed/ supervised the installation and commissioning activities at different sites and managed several modification works in different live substations. Have good experience on fault analysis and preparing abnormality reports. Have very good Computer knowledge.