Project manager :
Building 24 residential buildings in Prince Fawaz
Housing - Upper Jeddah, Ministry of Housing, at a cost of 180 million Saudi riyals
• Over 28 years of professional engineering experience in construction and infrastructure projects, including site supervision and follow up of day-to-day procedures and work activities.
• Managed and executed a number of construction projects and all of their tasks and sub-tasks, including, reinforced concrete structures, complete finishing, and construction of water supply and wastewater networks and many other civil engineering practices involved.
• High Experience in project management and implementation skills for many projects both in Egypt and overseas, with a good effort to add any new experiences, from the various projects, to create a comprehensive and consistent experience that can be employed in similar projects.
• Working according to International Federation of Consulting Engineers (FIDIC) Contracting regulation and apply that to many projects in the field of supervision of projects, execution, as well as working in the review of design drawings and the application of contracting provisions for consulting firms, as per FIDIC rules.
2010-2011 supervisor resident engineer (SRe) in chemonics
Libya Branch
• Supervision of executing 7500 housing units (structure and finishing)
• Supervision of executing 2 hospitals + hotel in Al Jabal Al Gharbi and Nalot.
• Contract value: 989, 925, 000 (LYD)
2008-2010 Site manager in Pearl Qatar (Doha-Qatar)
• Execution Tow Towers (2B, VB 14) at Pearl Qatar (structure and finishing)
• The cost for one tower 400 million RQ.
• (Alaarab contracting company)
2006-2008 Executive Engineer, CRC (DORA) Construction Company, Cairo.
Responsibilities included: • Construction and finishing of LANG-CRC (Dora) building in Giza (four seasons - hotel)
• Reinforced concert structures and finishing (including: painting; flooring- i.e., marble, tile; etc.) for eight floors for the South Tower for the American Consulting Office- BECTEL.
1998-2006 In Saudi Arabia
Responsibilities included: • Working in the Kingdom of Saudi Arabia - Bat'haa Orifice - located at the U.A.E. borders.
• Occupied the post of Executive Construction Manager for the past two years for a Residential City project planned on three phases, each phase was estimated by 130 million SA Riyals. The 1st phase had been completed and delivered on a turnkey basis consisting of the following: 48 Villa units
64 Family apartments
64 Single apartments
2 Underground tanks
1 Upper tank
2 Schools
1 Mosque
(Alarany contracting)
• Finishing for 50 chalets (in El khobar town) for American Marine Troops, including concrete finishing (E.G.G)
• Constructing a shopping center in Hottet Bani
Tamim, Riyadh.
• Constructing a faculty of medicine and faculty of science in El hasa (East of Saudi)
(Fast contracting company) - Jeddah
1994-1998 Project Manager, ETAC (Construction) Company, Cairo. (E.G.G) Cairo branch Responsible for the implementation and execution of the Abbasiya Six tower Project (LE48 Million project): • Complete finishing (painting, flooring, water proofing, etc.) for each tower, including 16 floors, tow basements, and a car garage.
• Construction of the water Supply and wastewater net.
• Supervising Technical office - Specific duties: Performing and preparing quantity, economic, technical studies for a Six-Tower Abbasiya Project.
• Executed the construction of the Ghazala tourist village in Sharm El Sheikh.
1997 New Technologies for Installtion of Marble (to be used in the implementation of the LANG-CRC (Dora) buliding in Giza, BECHTEL.
The Amigo Project included 420 (one-floor) chalets, 82 (tow-floor) villas, 18 (four-floor) buildings. Was
1990-1994 In Qatar
Responsibilities included: Executive Engineer (Finishing), Engineering Consulting Group (E.G.G), Middle East.
• Supervising the construction and landscaping for a exclusive tourist village of the Erwin Prince. (Village consisted of tow palaces, five villas, tow party halls, one village style house, and one stable)
• Maintenance and operation of the Doha Sheraton Hotel.
1988-1990 Executive Engineer Amigo for Tourism, Cairo.
The Amigo Project included 420 (one-floor) chalets, 82 (tow-floor) villas, 18 (four-floor) buildings. Was responsible for:
• A zone, which included 18buildings, 12 villas, 28 chalets.
• Operating the main electric net for the (Amigo 1) tourist village.
• Supervising the "finishing" for the entire village (water proofing, etc.)
• Execution of a 100m Marina.
• Execution of the majority of landscape operations.
• Completing electrical work, drinking water supply and wastewater network.
• Designing and preparing all working drawings of the Amigo 2 tourist village.
Trainig Courses and Seminars