Project (1): El Waha Residential Towers in New Administration Capital - R03)
Position: Project Manager (Senior-level).
Client: NUCA.
Consultant: Sabbour Consultant.
Responsibility: MEP Works.
Project (2): Wadi Natroun Prison
Position: Project Manager (Senior-level).
Client: Ministry of Interior
Consultant: El Afifi Consultant Company.
Responsibility: MEP Works.
Project (3): Integrated Sanitation Project
Position: Project Manage
Client: Ministry of Interior
Consultant: El Afifi Consultant Company
Piping Lines approximated 8000 meters (250 mm2 & 450 mm2 ) Mechanical Works for 4
Grundfos Submersible Pumps
Responsibility: Worked in water treatment plant and its buildings (sand filter, sand filter drain
tank, pump room, compressed air, longitudinal settling basin, thickener tank, drying bed and
electrical plant).also Responsible for Diesel generator, pipe rack, electrical manholes and its
conduit bank Emergency tower, transformer rooms, ware house building and plate form..
Project: New Conference Hall in Sharm Sheikh City
Work as Site Engineer
Position: Execution Engineer and Technical
Office Engineer.
Client: Telecom Egypt
Consultant: Cosmos Engineering Company
Responsibility: - Install, start up and
commissioning for Automatic Transfer Switch
- Mechanical Works (PL-FF-HVAC) for two presidential Villas
Project: VIP Restaurant - Building 504 Mansoura (2) in New Administration Capital
Work as Site Engineer
Position: Execution Engineer and Technical Office Engineer.
Client: Ministry of Defense of Egypt
Consultant: SHAKER Consultancy Group
Responsibility: -Firefighting system (Sprinklers and Cabinet)
-Plumbing (water supply, drainage and central heaters Networks)
-HVAC (Package unites, AHU, Condensing unit and Ventilation System)
Project: Many Projects All Over Egypt
Work as Maintenance Engineer for some foreign Agency in Egypt :
TECH-LONG company (Packing and Filling - Chinese Company)
ICE Company (Water Treatment Units - French Company)
EKtam Company (Packing and Filling - Turkish Company)
ASCO ATS low voltage Panel ( American Vendor ) Projects
CFC-Gas Chell
Egyptian post Data Center-PS
Katameya Intl. Hospital
Cancer Center Luxor.
Technical Institute Building-Army Forces
VI. Aswan Heart Center- Phase 2
VII. Alex International Air Port-Nozha
VIII. Carrefour Mall of Egypt
IX. Schlumberger H.Q. ATS Switches
X. Schlumberger H.Q. Load Bank
XI. City Stars Resort Sharm El Sheikh Phase 1
XII. City Stars Resort Sharm El Sheikh Phase 2
XIII. VOX Cinema Mall of Egypt