خميس شحانه ابوالنور عبدالحفيظ, Project Manager

خميس شحانه ابوالنور عبدالحفيظ

Project Manager

Abdulla Fouad group (TAQQAT Global.co)

Location
Saudi Arabia
Education
Bachelor's degree, Electrical Power &Machines Engineering
Experience
15 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 5 Months

Project Manager at Abdulla Fouad group (TAQQAT Global.co)
  • Saudi Arabia
  • My current job since June 2013

These projects owned by Saudi Electricity Company / National Grid.
SEC approved project manager.
SEC approved work permit receiver.
These projects are as follow:
1. Construction of new Zalloum village Substation132/33/13.8KV, ALJOUF,
KSA.SEC, NG. (running)
2. Reinforcement of SAKAKA industrial substation. SEC.(closed)
3. Supply of 4 no’s of power transformers 25/30KVA, 33KV/13.8KV to SEC
main distribution. Riyadh, KSA.SEC. (closed)
4. Life assessment and Major overhaul of 12 no’s of power transformer at

Project Manager at TAQQAT GLOBAL
  • Saudi Arabia - Dammam
  • My current job since June 2013

. Reinforcement of Mussadia, Qara, Hudaib, Al-Adarae substation
33kv/13.8kv by adding new transformers and upgrade power, control
and protection .(closed)
6. Upgrading of the electrification of Al Gabar hospital, Al Hassa area,
KSÁ. (closed)
7. Transaction of Dahran OHTL to underground
cables, 132KV, 33KV.(running)
8. Installation, testing, and commissioning of 3no’s of 65 KVA UPS in king
Khalid military city(KKMC), Hafr Al-Batin, KSA. (closed)
9. Replacement of King Khalid Military city underground cables 13.8KV,
300km length. (running)
10. Replacement of underground paper cables of outgoing feeders at King
Fahd industrial port (KFIP), 13.8KV. (running)
Job responsibilities:
* Execute the project within the defined targets (cost sheet, time
schedule, scope of work) to control the project activities proactively and
ensure sufficient management throughout the project life cycle to
minimize projects financial figures.
* Focusing in improving the customer satisfaction through customer
meetings.
* Work proactively to meet customer expectation in terms of acceptance
of project deliverables, manage acceptance and final project handover.
* Ensure project timely payment even under challenging circumstance to
optimize the project gross profit and operation cash flow.
* Involved early in offering phase to define procurement packages and
study pre-contractual conditions including awareness of risks with
negative impact risk factor, preparation of the technical proposal during
bid stage.
* Assure avoidance /mitigation of liquidated damages and other
penalties/ claims.
* Document of all work results, according to the valid results.
* Review received files from sales team and ensure proper handover for
the documents as per the pre-defined check list.
* Ensure prepare of drawing to be submitted for the approval in proper
time as per the engineering process that is approved and implemented.
* Review the proposal upon receiving it and prepare list of new
requirements that demand change order as per the process and project
schedule.
* Release project material and equipment after end user approval for
ordering and manufacturing, arranging the FAT, release for the
shipment, custom release.
* Supervision of project execution phases, installation, request for
inspections, material delivery requests, work permits receivers, testing
commissioning, requests for outage coordination with end user,

Project Manager at TAQQAT
  • Saudi Arabia - Dammam
  • My current job since June 2013

Coordinate with client, supplier’s designer and subcontractors.
* Aware of contractual and commercial issues.
* Ensure performance, productivity, efficiency, meeting schedule, safety
and quality.
* Organize project set up.
* Initiate material purchase, reporting to management.
* Held regular meetings Alert on critical issues.
* Availability:
Available within 4 to 5 weeks as full time.

Electrical maintenance Engineer at Rubex for Plastics industries New Borg El Arab city industrial Zone
  • June 2006 to January 2007

Responsible of electrical maintenance of plastic blow off and injection
machines, along with wide experience of the air compressors, chillers,
conveyer belts, emergency diesel generators, plastics printing
machines, acrylic plate's machines, in addition to upgradation of the
factory fire alarm and fire fighting system.

Head at CECILLE
  • Egypt - Alexandria
  • June 2003 to June 2006

Cecile for cartoon industries. New Borg
El Arab city industrial zone.
Performed all works concern electrical construction while building up
the factory and putting machines into service.

construction engineer at El-Nahda El-Haditha for generalconstruction company
  • Egypt - Alexandria
  • September 2002 to May 2003

Alex carbon black project) responsible of electrical works that was
done while constructing up the third and fourth production lines in
mentioned project.
* MCC and PCC installations, cable pulling and terminations, motors
erection and mounting, panels Fixing and installation, street lighting.

construction engineer at KSA
  • United Arab Emirates
  • to

preparing the T&C Schedule, outage plan, energization, red marking
submittal, as built issuance with consultant.
* Represent the company as primary external contact, frequent visits to
decision makers of customers and business partners to cultivate the
relationships.
* Resolute tracking of market development in

Education

Bachelor's degree, Electrical Power &Machines Engineering
  • at Tanta University
  • June 2002

POWER AND MACHINES , TRANSMISSION LINES , POWER GENERATIONS , SUBSTATIONS

Specialties & Skills

ACRYLIC
CABLEADO
CASH FLOW
CONSULTING
CUSTOMER RELATIONS
CUSTOMER SATISFACTION
DELIVERY
DOCUMENTATION
MICROSOFT WORKS

Languages

English
Expert