saad elbahnasy, sr. planning Engineer

saad elbahnasy

sr. planning Engineer

4th dimenstion

Lieu
Egypte - Le Caire
Éducation
Baccalauréat, IT And Spatial Management
Expérience
20 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :20 years, 3 Mois

sr. planning Engineer à 4th dimenstion
  • Irak - Al Nagaf
  • novembre 2019 à avril 2020

• Prepared based on the Overall Project Schedule according to the Sub-contract jointly with Clint the Baseline Schedule ( using Primavera P6 for EPC project )
• Elaborate the Project monitoring system with respect to WBS & allocating weightage
• Prepared the Overall Schedule of Level 4 for all activities and constantly focus on the possible optimization of durations of individual activities, their sequencing etc. in line with actual progress of the Works thus to observe the potential time contingency .
• Regularly monitored the Overall project progress with respect to approved schedule and measurement system including the individual milestones of DTO, CTO, MHO, TOP
• Prepared S-curves for the Overall Project and monitor the progress of the Works with respect to the same and up-date in line with the actual Progress achieved in different Areas.
• Evaluated and control the Construction productivity of individual disciplines

Planning Engineer à Jurmat Group
  • Irak - Bassorah
  • mai 2015 à octobre 2019

• Prepared based on the Overall Project Schedule according to the Sub-contract jointly with Clint the Baseline Schedule ( using Primavera P6 for EPC project )
• Elaborate the Project monitoring system with respect to WBS & allocating weightage
• Prepared the Overall Schedule of Level 4 for all activities and constantly focus on the possible optimization of durations of individual activities, their sequencing etc. in line with actual progress of the Works thus to observe the potential time contingency
• Maintain the Look-ahead three months forecast Program and to alert and share with Project and Construction Manager any potential critical areas/activities together with the proposed variants of the resolutions or mitigation to prevent the noncompliance to meet main Sub-contractual milestones
• Permanently monitored the Overall Time Schedule & Critical Path to avoid any slippage
• Prepared the Action Plan & Risk evaluation including the solution accelerate the Works in the areas/activities with the slippage observed
• Regularly monitored the Overall project progress with respect to approved schedule and measurement system including the individual milestones of DTO, CTO, MHO, TOP
• Prepared S-curves for the Overall Project and monitor the progress of the Works with respect to the same and up-date in line with the actual Progress achieved in different Areas
• Prepared and maintain the Critical Path Schedule its analyses including the proposed manner of the resolution and mitigation
• Prepared regular reports like MR, WR, SDR
• Reported and highlight to the Project and Construction Managers with no delay any substantial accidental slippages that may result in the Work Progress disturbance
• Evaluated and control the Construction productivity of individual disciplines

Planning Engineer à Jurmat Group
  • Irak - Bassorah
  • mai 2015 à octobre 2019

• Prepared based on the Overall Project Schedule according to the Sub-contract jointly with Clint the Baseline Schedule ( using Primavera P6 for EPC project )
• Elaborate the Project monitoring system with respect to WBS & allocating weightage
• Prepared the Overall Schedule of Level 4 for all activities and constantly focus on the possible optimization of durations of individual activities, their sequencing etc. in line with actual progress of the Works thus to observe the potential time contingency
• Maintain the Look-ahead three months forecast Program and to alert and share with Project and Construction Manager any potential critical areas/activities together with the proposed variants of the resolutions or mitigation to prevent the noncompliance to meet main Sub-contractual milestones
• Permanently monitored the Overall Time Schedule & Critical Path to avoid any slippage
• Prepared the Action Plan & Risk evaluation including the solution accelerate the Works in the areas/activities with the slippage observed
• Regularly monitored the Overall project progress with respect to approved schedule and measurement system including the individual milestones of DTO, CTO, MHO, TOP
• Prepared S-curves for the Overall Project and monitor the progress of the Works with respect to the same and up-date in line with the actual Progress achieved in different Areas
• Prepared and maintain the Critical Path Schedule its analyses including the proposed manner of the resolution and mitigation
• Prepared regular reports like MR, WR, SDR
• Reported and highlight to the Project and Construction Managers with no delay any substantial accidental slippages that may result in the Work Progress disturbance
• Evaluated and control the Construction productivity of individual disciplines

Planner à Hussein Atieh & Sons LLC for Construction & Contracting (HAE).
  • Jordanie - Amman
  • février 2000 à avril 2015

• Prepared based on the Overall Project Schedule according to the Sub-contract jointly with Clint the Baseline Schedule ( using Primavera P6 for EPC project )
• Elaborate the Project monitoring system with respect to WBS & allocating weightage
• Prepared the Overall Schedule of Level 4 for all activities and constantly focus on the possible optimization of durations of individual activities, their sequencing etc. in line with actual progress of the Works thus to observe the potential time contingency
• Maintain the Look-ahead three months forecast Program and to alert and share with Project and Construction Manager any potential critical areas/activities together with the proposed variants of the resolutions or mitigation to prevent the noncompliance to meet main Sub-contractual milestones
• Permanently monitored the Overall Time Schedule & Critical Path to avoid any slippage
• Prepared the Action Plan & Risk evaluation including the solution accelerate the Works in the areas/activities with the slippage observed
• Regularly monitored the Overall project progress with respect to approved schedule and measurement system including the individual milestones of DTO, CTO, MHO, TOP
• Prepared S-curves for the Overall Project and monitor the progress of the Works with respect to the same and up-date in line with the actual Progress achieved in different Areas
• Prepared and maintain the Critical Path Schedule its analyses including the proposed manner of the resolution and mitigation
• Prepared regular reports like MR, WR, SDR
• Reported and highlight to the Project and Construction Managers with no delay any substantial accidental slippages that may result in the Work Progress disturbance
• Evaluated and control the Construction productivity of individual disciplines
• In the close coordination with the Construction Manager and Lead Site Engineers to regularly control the Work Progress of compare to the L4 Schedule and if needed to jointly the debottlenecking contingency Plan to catch the Scheduled Progress and/or to minimize the impacts to the subsequent activities.
• Monthly invoicing of the Directs Works and control all necessary the Invoices to be ready for Clint approval.
• Follow and control the status of monthly Invoices issued towards Clint & to up-date regularly the S-curve with respect to Overall Budget and its Breakdown to the Main Portions of the Sub-Contract Price.

Éducation

Baccalauréat, IT And Spatial Management
  • à Ain Shams University
  • février 1995

Specialties & Skills

العمل الجماعي
حساب الكميات
الادارة / التخطيط / الحاسوب
الاظهار المعماري
التصميم ثنائي الابعاد / ثلاثي الابعاد
تنسيق الاجتماعات وعرض اجندة الاجتماع

Langues

Arabe
Langue Maternelle

Formation et Diplômes

ادارة المشروعات (Formation)
Institut de formation:
مؤسسة حسين عطية
Date de la formation:
January 2015
Durée:
40 heures

Loisirs

  • الشطرنج - السباحة - الافلام الاجنبية