Project engineer - bidding
HAAISCO
مجموع سنوات الخبرة :2 years, 0 أشهر
Uphold standard protocols for the safe operation of water treatment systems.
• Evaluate Piping and Instrumentation Diagrams (P&IDs) to enhance processes and understand
configurations.
• Monitor and record crucial process variables to ensure operational stability and regulatory
compliance.
• Acquire practical experience in conducting shutdowns at reverse osmosis plants, providing
support for maintenance and operations.
• Contributed in the bidding of “Long term operation & maintenance for sewage treatment
plants in Al-khobar and Al-Ahsa”: this project involve:
▪ Being a team member in the bidding committee
▪ Revise and evaluate client requirements in the RFP
▪ Site visit to assess the technical condition based on age, technology and performance
▪ Define the required rehabilitation and capital upgrades to bring back up to standard
▪ Develop and prepare technical O&M plans
▪ Develop scope of work based on RFP in addition to site visit outcome
▪ Prepare RFQs and send to vendors
▪ Contribute in technical and commercial evlauation committees
• Assist in the procurement of contracts, ensuring smooth project execution through collaboration
with the supply chain.
• Assist the department head of Yanbu desalination Plant to revise quantity and types of the
required spare parts and cheimcals.
• Assist procurement department to request qoutations for JAZAN desalination Plant starting from
RFQ to financial evaluation from three vendors. Value of (1.5M SAR)
• Contribute to the development of the JAZAN plant's 2024 budget plan, optimizing resource
allocation.
• Foster sustainable water treatment solutions for desalination and sewage plants.
Company Industry: Packing • I performed various testing procedures in previous positions to maintain high product quality standards. • I closely monitored each stage of production and promptly addressed any defects that arose before, during, and after processing. • I conducted systematic analyses to identify the underlying causes of issues and implemented corrective measures accordingly. • Additionally, I worked collaboratively with cross-functional teams to improve quality control measures and overcome challenges. • I actively contributed to continuous improvement by suggesting & implementing enhancements prioritizing quality