Site manager
KHATIB &ALAMI
Total years of experience :29 years, 1 Months
• supervise the operation and maintenance work at the land port.
• Reviewing performance rates and evaluating site operation and maintenance KPIs.
• Review the BILLS of the contractor and issue work orders and follow-up of the contractor.
• Follow-up the operation and maintenance work of the port with the follow-up of the electrical system and finding solutions for it.
• Follow up on consumables and assess the condition of contractors equipment.
• review of comments and approving technical submissions for electrical works
• Integrate sustainable design principles and NEW technologies to create energy-efficient buildings
• Ensure that designs comply with local regulations, zoning laws, and building codes
• Oversee projects from conception to completion, managing budgets, schedules, and resources effectively
• Supervising the project to prevent the dangers of floods in the Qassim region
• Design SLD of electrical panels to STORM plants and electrical system from transformer to loads and designed all electrical system in plants.
• Review calculation electrical cable calculations and voltage drop and approving them.
• Design lighting system, electrical requirements for buildings, grounding, and approved (lighting, fire alarm, etc.).
Projects:
1. A project to implement a flood water drainage line in the Al-Shuaqa neighborhood of Buraidah
2. A project to implement a flood water drainage line in Al-Marqab and Shammas district of Buraidah
3. A project to implement a flood water drainage line in the Al-Khalij neighborhood of Buraidah)
• supervising a project to The Custodian of the Two Holy Mosques King Abdullah bin Abdul-Aziz / Project (the Development of courts(22 Courts)) (1, 250, 000, 000 SAR)
• design SLD of electrical panel’s to buildings such as electrical system from transformers to loads and design of all electrical systems in court.
• review electrical cable calculations and voltage drop and approving them.
• design lighting system, electrical requirements for buildings, grounding, and approved (lighting, fire alarm, etc.).
• review any light current system to any building (sound system, fire alarm)
• supervising a project to construction sewage water treatment plants and waste water treatment plants.
• design SLD of electrical panel’s to sewage treatment plant or electrical system from transformer to loads.
• review electrical cable calculations and voltage drop and approving them.
• design lighting system, electrical requirements for buildings, grounding, and approved (lighting, fire alarm, etc.).
• review any light current system to any building (sound systrm, fire alarm, ......etc)
• Work as an engineer consultant of the project water treatment plant in Directorate General Qassim (all works).
• Projects :
1. Supervising the implementation of pumping station and accessories for strategic tank No. 5 Quraa Buraidah (50000 m 3) (SR 23, 000, 000)
2. Supervising the implementation of strategic tank No. 8 and its pumping station in Buraidah (50000 m3) (SR 58, 000, 000).
3. Supervising the implementation of remote control and monitoring system for the wells and water network of the first treatment plant, Buraidah City (SR 7, 358, 000)
senior Electrical design engineer Duties included but not limited/ Value of project (20, 000, 000 SAR)
• supervising a project to construction sewage water treatment plants.
• design SLD of electrical panels to sewage treatment plant or electrical system from transformer to
loads.
• review electrical cable calculations and voltage drop and approving them.
• design lighting system, electrical requirements for buildings, grounding, and approved (lighting, fire
alarm, etc.).
• review and make recommendation any light current system to any building (sound system, fire alarm,
......etc)
• Work as a consultant for water treatment plant the projects in Directorate General Qassim (all works).
• Projects:
1. Supervising the implementation of the project to remove the smells and
cover works of sewage treatment plant in Buraidah city
2. Supervising the implementation of the deodorization project and the coverage works at the sewage
treatment plants Anaiza and Alrss
• supervising a project to construction water treatment plants.
• design SLD of electrical panel’s to water treatment plant or electrical system from transformer to loads.
• review electrical cable calculations and voltage drop and approving them.
• design lighting system, electrical requirements for buildings, grounding, and approved (lighting, fire alarm.).
• review any light current system to any building (sound systrm, fire alarm, ......etc)
• Work as an engineer consultant of the project water treatment plant in Directorate General Qassim (all works).
• supervising a project to sewage treatment plants.
• design SLD of electrical panel’s to water treatment plant or electrical system from transformer to loads.
• Review electrical cable calculations and voltage drop and approving them.
• design lighting system, electrical requirements for buildings, grounding, and approved (lighting, fire alarm, etc.).
• review any light current system to any building (sound systrm, fire alarm)
• Work as an engineer consultant of the project water treatment plant in Directorate General Qassim (all works).
• Review technical presentations and catalogs materials, electrical equipment sewage treatment plant and approved it.
• Projects :
1- Supervise the implementation of the expansion project of the second sewage treatment plant in Onaiza governorate(From 25000 m 3 to 50000 m 3) (SR 68, 000, 000)
2- Supervision of the project of expansion of sewage treatment plant(first) in Buraidah (from 75000 m 3 to 150000 m 3)
3- Supervision of the project to expand and upgrade the efficiency of the fourth and fifth sewage treatment plants in Qassim area
• supervising a project to sewage treatment plants.
• design SLD of electrical panels to water treatment plant or electrical system from transformer to
loads.
• Review electrical cable calculations and voltage drop and approving them.
• design lighting system, electrical requirements for buildings, grounding, and approved (lighting, fire
alarm, etc.).
• review any light current system to any building (sound systrm, fire alarm)
• Work as an engineer consultant of the project water treatment plant in Directorate General Qassim
(all works).
• Review technical presentations and catalogs materials, electrical equipment sewage treatment plant
and approved it.
• Projects :
1- Supervise the implementation of the expansion project of the second sewage treatment plant in
Onaiza governorate (From 25000 m 3 to 50000 m 3) (SR 68, 000, 000)
2- Supervision of the project of expansion of sewage treatment plant(first) in Buraidah (from 75000
m 3 to 150000 m 3)
3- Supervision of the project to expand and upgrade the efficiency of the fourth and fifth sewage
treatment plants in Qassim area
• Value of project (1, 000, 000, 000 SAR)
• Protective relay details:
• - Siemens:
• - 7sj63 (over current relay, earth fault relay (direction & non direction) …).
• -7sa 522 (distance protection relay in mv).
• -7ut612 (diff. & restricted prot. Relay for transformer).
• - areva :
• - micom p120 (sensitive earth fault transmission line 11 kv).
• -al stom :
• - KCG 110 (sensitive earth fault transmission line 11 kv).
• - testing c.t & v.t transformer (c.t ratio, burden…)
• - work details:
• Review and take action for all faults that appear during work for (C.B, signals, transformers, CT……).
• testing protections devices by omicron cmc 256 to see the faults in digsi 4.8 computer software .
• perform a test (restricted ground fault, diff fault, o/c, e/f)
• draw substation diagrams with Visio.
• make test C.T & V.T by CPC100 (conversion ratio, load)
&commissioning) Bab Al Medina Trading & Contracting LIBYA
• make maintenance of the faults motors and electrical equipment.
• make maintenance of circuit breakers faults voltage 6.3 kV.
Electrical Unit details :
• Active power /unit =150 mw
• Generator type = general electric /15kv/1 90VA/syn
• Turbine type = general electric/ steam 510temperature /126pressure /24stage
• Boiler =steam 530tan/hr/ 126 pressure
• Control sys (DCS sys company)= honey well
• Power plant details:
• Unite no: (4)steam unit /1 50mw for unit
• (600mw for all unit)
• -gas turbine: 8mw -emergence diesel generator. work details:
• . work as operator engineer to keep power plants unit on network if problem is happen in DCS sys in control room or in unit operation
• make work order to maintenance parts if any faults
• Experience in all mechanical or electrical circuits in power plant as (hydraulic oil sys-lubrication oil sys for turbine -switch 6.3kv -switch 0.4kv …..)
• Experience in all mechanical or electrical protections devices on (turbine- pump - generator….)
• make testing on transformer by CBC100 unit (tan delta-tarns ratio (....
• shift operation engineer on two unit to solve any problems on unit if control engineer cant solve it
• Local engineer on power plant if any problem in field of unit on machines.
• Electrical maintains engineer on machines broken in power plant.
• Safety engineer if any problems in unit.