محمد محمد احمد احمد ابرهيم ابراهيم, mechanical engineer

محمد محمد احمد احمد ابرهيم ابراهيم

mechanical engineer

abdlhafiz mohamed abdalhafiz bin shihon

Lieu
Arabie Saoudite
Éducation
Baccalauréat, mechanical Engineering
Expérience
11 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :11 years, 1 Mois

mechanical engineer à abdlhafiz mohamed abdalhafiz bin shihon
  • Arabie Saoudite - Alqunfithah
  • mars 2014 à janvier 2016

* housing project 593 villa & (5 MASJID) belong to ministry
of housing Consultant is AECOM
Responsible for activity belong to plumbing & water supply net work
* internal water net work ( from underground tank to roof tank,
Fitting, accessories & pumps ….)
* plumbing system PVC & UPVC material (pipe & fitting) & plumbing
Fixtures installation
* air condition ( free stand, wall split & package unit)
Such as:-
* review drawings & participate in modifications
* follow up to provide approved material coordination with
Procurement department (to prevent material shortage)
* proceeding weekly & monthly progress report
* prepare monthly invoice for company & sub contractors
* proceed test preparation, inspection request & material inspection
request
* managing & supervising the working team & sign the time sheet

Mechanical engineer à FA THI RAWASHDI ESTABLISHMENT
  • Arabie Saoudite - La Mecque
  • juin 2013 à décembre 2013

construction of:-

*external water supply net work (HDPE material)
*west water, rain drainage system (concert, pottery pipe)
*fire fighting pipe net work system (ductile pipe)

Mechanical Engineer à Higleig Petroleum Service& Investment Co
  • Soudan - Khartoum
  • avril 2005 à janvier 2013

working in Higlieg area project such as;
# Tharjath Pipe Line Project as Site Engineer
# Tharjath Base Camp-Mech Engineer (Fire Fighting Piping).
# FSF4 (field surface facility phase 4) as Site Engineer.
# Minor Construction &Maintenance Project as Mech Engineer Supervision&
Implement of varies activities such as (tank cleaning -welding process (SMAWGTAW-
TIG) at ( FPF, CPF (piping connection, Overflow pipe line, SS gas line,
water, air& fuel pipe line ...)
# Repair at flow line, installation And construction work…
# Evaluate, implement &scheduling all above mentioned activities.
# Water treatment plant supervision of tanks, filters assembly and installation,
Pumps installation, fitting connection and PVC, galvanize pipe line and
Commissioning with construction and operating team.
# Fuel dispenser mechanical construction, pumps tanks, piping, fitting control
# ductile iron pipe for firefighting size from(150—300mm)
# water supply network & distribution from (110--200mm )
And participate with electrical & instrument engineer commissioning
Note:
FPF: field process facility including(tanks, piping, heaters, pumps, &others..)
CPF: central process facility gathering of a lot of FPF

Mechanical engineer à khartoum irrigation company
  • Soudan - Khartoum
  • juillet 2004 à mars 2005

* Field surface activities such as maintenance, troubleshooting &overhauling of
varies engine.
* Co-ordinate with customer planning parts inventory.
* Participate for major overhauling.

à minor construction &maintenance
  • à

pile) للمبانى جاهره للحقل عدد (1420pilling pipe different size

Éducation

Baccalauréat, mechanical Engineering
  • à AL imam AL Mahdi University
  • juin 2003

Dear Sir I would like to apply for mechanical engineer jobs. Form the end of year 2003 I have worked in Higleig Petroleum Service & Investment Company. and Khartoum Irrigation Company, construction, service &contracting company and others projects. In Saudi Arabia working establishment subcontract with Alfouzan Company in big project external work infrastructure water supply, internal (water and sewage) network, firefighting, sewage belong to ministry of finance (Mecca- mozdalifa) & bin- shihon contracting establishment My last job involves various mechanical duties. Such as • Pipe construction, pipeline supervisor (stringing welding lowering back filling Plasting, painting coating & commissioning • Project coordination • Oil facility maintenance create or rectify (air, water, SS gas &fuel line), pumps installation, tanks cleaning and other various job • Project follows up execution. Before this job I was a trainee with Kenana Sugar Factory in Sudan (White Nile State), Assalaya Sugar Factory, safety courses and lectures with (GNPOC) Greater Nile Operating Company, welding course, AutoCAD, primavera, and have various Microsoft package experience. .I have always enjoyed working with people and think my previous experience will allow me to work as part of the team and to be an effective representative of your company. I am available or interview at any time and could start work less than one month. You can ask for references from my present and previous employers.

Specialties & Skills

Project Management
Analysis Services
Workflow
Planing
DISEÑO DE LA DISPOSICIÓN
PLUMBING
QUALITY
SYSTEM ARCHITECTURE

Langues

Arabe
Langue Maternelle
Anglais
Moyen

Formation et Diplômes

plumbing, &fire fighting system (Formation)
Institut de formation:
-Exemplar Centere
Date de la formation:
September 2013
Durée:
30 heures

Loisirs

  • reading
    to increase our knowledge and under stand the news information no way without reading & applications