Total des années d'expérience: 13 Années, 9 Mois
septembre 2015
A janvier 2017
Civil inspector
à O SAUDI TECHNOLOGIES
Lieu :
Arabie Saoudite - Najran
Responsibilities: (in NAJRAN MUNICIPALITY )
o Following-up all construction activities
o Arranging materials for site
o Site's safety arrangements
Projects:
o King Abdul Aziz Road
o Maintain Internal roads
o King Feisal Road
o Jorba Road
o Following-up all construction activities
o Arranging materials for site
o Site's safety arrangements
Projects:
o King Abdul Aziz Road
o Maintain Internal roads
o King Feisal Road
o Jorba Road
août 2013
A août 2015
Civil inspector
à Expertise House Company
Lieu :
Arabie Saoudite - Najran
O
Responsibilities: (in NAJRAN MUNICIPALITY )
o Following-up all construction activities
o Arranging materials for site
o Site's safety arrangements
Responsibilities: (in NAJRAN MUNICIPALITY )
o Following-up all construction activities
o Arranging materials for site
o Site's safety arrangements
juin 2010
A juillet 2011
مدير موقع الشركه فى جنوب السودان
à البيدى للطرق والجسور
Lieu :
Soudan
o Following-up all construction activiti
o Revision of missing data in drawings with consultant
o Arranging materials for site
o Site's safety arrangements
o Attending and arranging coordination meeting with clients and contractors
o Preparation of projects Specification and Bills of Quantitieess
o Preparation of monthly payments
o Revision of missing data in drawings with consultant
o Arranging materials for site
o Site's safety arrangements
o Attending and arranging coordination meeting with clients and contractors
o Preparation of projects Specification and Bills of Quantitieess
o Preparation of monthly payments
juin 2004
A juillet 2010
مشرف عمليات الطرق الداخلية
à شركة النيل الكبرى للبترول
Lieu :
Soudan - Khartoum
o Roads construction activities
o Storm water system construction activities
o Supervision of all executed works at site
o Revision of all shop drawings, material submittals, and correspondence
o Site's safety requirement
o Check projects Specification and Bills of Quantities
Projects
o Wankai Steel Bridge
o Drainage System at Heglig Oil Filed C.P/F
o Evaporation ponds at Heglig Oil Filed C.P/F
o Neem Base CAMP construction
o Drilling pads at Heglig Oil Filed C.P/F
o Heglig OilFiled services roads
o Transportation Tours Unity-Heglig (Total of 70km)
o AL-Mujlad military airbase runway
o Storm water system construction activities
o Supervision of all executed works at site
o Revision of all shop drawings, material submittals, and correspondence
o Site's safety requirement
o Check projects Specification and Bills of Quantities
Projects
o Wankai Steel Bridge
o Drainage System at Heglig Oil Filed C.P/F
o Evaporation ponds at Heglig Oil Filed C.P/F
o Neem Base CAMP construction
o Drilling pads at Heglig Oil Filed C.P/F
o Heglig OilFiled services roads
o Transportation Tours Unity-Heglig (Total of 70km)
o AL-Mujlad military airbase runway
mars 2002
A avril 2004
مهندس موقع
à شركه هجليج لخدمات البترول
Lieu :
Soudan
o Roads construction activities
o Supervision of all executed works at site
o Revision of all shop drawings, material submittals, and correspondence
o Soil testing
o Check projects Specification and Bills of Quantities
Projects
o Al-Rank/Fulug Road (Total of 153 km)
o Al-Rank/Fulug Road bridges & Culverts (Three bridge, 15 pipe culverts, and pile cap)
o BLOCK 6 - Balila Oil Fieldbump Station's concrete foundation
o BLOCK 6 - BalilaOil Fieldservice roads (Total of 82km)
SOFTWARE
o Supervision of all executed works at site
o Revision of all shop drawings, material submittals, and correspondence
o Soil testing
o Check projects Specification and Bills of Quantities
Projects
o Al-Rank/Fulug Road (Total of 153 km)
o Al-Rank/Fulug Road bridges & Culverts (Three bridge, 15 pipe culverts, and pile cap)
o BLOCK 6 - Balila Oil Fieldbump Station's concrete foundation
o BLOCK 6 - BalilaOil Fieldservice roads (Total of 82km)
SOFTWARE