مهندس كهرو ميكانيك
المقاولون العرب
مجموع سنوات الخبرة :28 years, 4 أشهر
مهندس اعمال كهربائية وميكانيكية ومدير مشروع
تنفيذ اعمال اكهرباء والميكانيكا وتسليمها للاستشارى
4-Arab contractors Company
.Medium and low voltage network for Banafsig city (from 1/10/2009 to until now)
Job title: electrical engineer and project manager.
Description of work: Power distribution from switchgear (22K.V) to transformers (1 M.V.A) through medium voltage cable network to electrical panel boards throw low voltage cables to all building in this city as indicated below: A- (10) Medium voltage rings including (2) switchgear and (80) transformer.
B- (320) panel boards.
C- (1280) feeders from panel boards through low voltage cables to buildings panel.
5-Arab contractors Company
. Lighting network for Banafsig city (from 1/7/2011 to until now)
Job title: electrical engineer and project manager.
Description of work: Power distribution from transformers to (36) lighting panel to (2520) Lighting poles.
6-Arab contractors Company
.HVAC system for Air Forces Hospital from (1/2/2011 to until now)
Job title: project manager and electro mechanical engineer.
Description of work
Duct and pipe works for two floors that including the existing and do testing and inspecting this works to the consultant engineer that indicated below: 1- One chiller (600 TR)
2- One pump for child water system (100 HP)
3- One pump for condensation water system (40 HP)
4- Cooling tower.
5- Fan coil units (800 CFM &100 CFM & 2400 CFM)
6- Air handling units (5200 CFM & 3400 CFM)
7- Exhaust fans (Fan sections and axial fans and smoke fans
8- BMS system.
9- MCC panels.
Internet and activates
A- Internet.
B- Computer.
C- Experimental work.
D- Fishing
.British international school (From 1/2/2007 to 30/2/2009)
Job title: Electrical engineer for installation and test the systems of (Lighting, power and light current systems that including the systems of CCTV, fire alarm, data, telephone and MATV) and inspecting this works to the consultant engineer.
Description of work: Power distribution from ring main units to switch gear (22 K.V) to three transformers (1.5 M.V.A each) through Medium voltage cables (22 K.V) network to all building as indicated below: A- Senior school building.
B- Primary school building.
C- Art, theater building.
D- Library, canteen, gymnasium building and swimming pool.
E- Maintenance building.
F- External works.
And put the stand by power generating unit (250 K.V.A stand by) and A.T.S on the service.
3-Arab contractors Company
.Lighting network for Mostasmreen city (from 1/3/2009 to 30/10/2009)
Job title: electrical engineer and project manager.
Description of work: Power distribution from transformers to (44) lighting panel to (2860) Lighting poles.
. Hilton Taba Hotel (From 16/2/2006 to 15/1/2007)
Job title: 1- Electrical engineer for installation and test the systems of (lighting, power and light current systems that including the systems of CCTV, fire alarm, data, telephone and MATV) and inspecting this works to the consultant engineer.
2- Mechanical engineer for installation of HVAC and fire fitting works for the hotel.
Description of work: Power distribution and light current distribution and mechanical works for: A- 120 rooms, Lobby bar and one kitchen.
B- One restaurant.
C- Two indoor swimming pool.
2-Arab contractors Company
• B.S.C Degree of Electrical Engineering -Electrical Machine &Power Engineering Department. • El-Sherouk Academy (2000-2005) Graduation project: Water resistance (artificial load)
Date of Graduation: 2005. Estimation of project: Very good. Estimation of baccalaureate: Very good.