أشرف جابر نبية البيلي, A -Working as project Engineer

أشرف جابر نبية البيلي

A -Working as project Engineer

gulf eagle contracting

البلد
الإمارات العربية المتحدة - أبو ظبي
التعليم
بكالوريوس, Civil Engineering
الخبرات
14 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 0 أشهر

A -Working as project Engineer في gulf eagle contracting
  • الإمارات العربية المتحدة - أبو ظبي
  • يوليو 2006 إلى يونيو 2016

A- Working as Project Manager in Two Steel Str.
- project with U.A.E Armed Forces and Critical infrastructure & Coastal protection Authority in all U.A.E Defense camps.
B- Working as Al Ain Area manager for Four projects :
- Al Saad inspection center With Emirates transport as a client and AL Torath consulting Engineers .
- Commercial Building ( B + G + 3 typical ) with ADCE as a client and Madi consultant
- Commercial villa ( B + G + 1 st floor ) with ADCE as a client and ARCO consultant .
- Commercial villa ( G + 1 st floor ) with ADCE as a client and Violet consultant .
C- Working as construction manager .
- Mobil Camps and offices Camps with National Drilling company at Habshan Camp under ADNOC management .
D - Working as Project Manager .
- New Facilities Extension for ADCOM Systems factory (office showroom, kitchen block, Toilet Block, Security block, Infra structures and External roads).
- Working as Project Manager
- Two project with U.A.E Armed Forces .
Construction of building for combined training center (Sharjah).
Construction of building concrete stores for coast guard group H. Q (Fujairah).
A -Working as project
Engineer in GULF EAGLE CONTRACT in Two Tower for the same basement: 1- Consultant: syrconsult consulting engineering
Description: 4 basement + Gr. + Mezz + 12 typical + health club + roof
2- Consultant: Eng. Adnan Saffarini
Description: 4 basement + Gr. + Mezz + 12 typical + pent house + roof

B - Working as project manager in two project with RAS AL KHAIMAH government at: Construction of super span store size 28.00 x 150.00 x 10 m height and the walls is completely concrete and hollow core, as well as working as subcontractor for civil work of electrical substation, main contract "Siemens" for R.A.K cement factory, RAS AL KHAIMAH.

Construction for all building in MINA RAS AL DAHRA, the building is (Motel + 9000 m2 Storage area + Mosque + Administration building + Supermarket + Workshop + Service block) for R.A.K government department of customs and ports, RAS AL KHAIMAH.

site engineer في MAX - GROUP company
  • الإمارات العربية المتحدة
  • يناير 2005 إلى يوليو 2006

From Jan. 2005 up July 2006: - Working as site engineer in MAX - GROUP company, with U.A.E Armed Forces and having the approvals from Directorate of Military Works, at 1- Contract by 5, 000, 000 DHS, for Maintenance of coast guard at (Al Mina), Abu Dhabi.
2- Execution of boundary wall 1600 L.M & 2 Main Gate (G + 2 floor) as castle at (Al Ras Al Akhder), Abu Dhabi.
3- Contract by 5, 00, 000 DHS, for Maintenance of (Al Batten Air Port), Abu Dhabi.

Supervision engineer في Inter City
  • الإمارات العربية المتحدة - أبو ظبي
  • مارس 2004 إلى يناير 2005

From Mar. 2004 To Jan. 2005: - Working as Supervision engineer in Inter City consultant, for construction 150 Villa each Villa (content of 6 bed rooms + 2 majles) at El Hellia, Abu Dhabi

Engineer في AL Agwaa contracting
  • الإمارات العربية المتحدة
  • نوفمبر 2003 إلى مارس 2004

From Nov. 2003 To Mar. 2004: - Working in AL Agwaa for contractors as site Engineer in 2 Villa at El Mezhr and Al Kosees, Dubai.

site engineer في United Engineering
  • مصر
  • ديسمبر 2002 إلى نوفمبر 2003

From Dec. 2002 To Nov. 2003: - Working in United Engineering as a site engineer.
- Following the construction of big school (G + 4 floor) from piles up to finishing, EGYPT.

civil engineer في Al.Moneer consultant Engineering
  • مصر
  • يوليو 2002 إلى ديسمبر 2002

- Following the most of the office projects, EGYPT.

All of this previous work is based on the followings:
1- Raise monthly payment for progress of work.
2- Run construction projects independently.
3- Follow the schedule of works.
4- Order materials required for project.
5- Organize proper work force.
6- Procure the machinery and equipment required for works time wise and type wise.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Mansoura University
  • يونيو 2002

1997 - 2002: BSC. of Civil Engineering in June 2002, Mansoura University. Total grade: Good. Project: Material Quality ( V.Good)

Specialties & Skills

Concrete
AutoCAD
Microsoft Office
CONCRETE
ENGINEER
MAINTENANCE
PROJECT ENGINEER
PROJECT MANAGER

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

نقابة المهندسين
  • دائمه
  • August 2002

التدريب و الشهادات

PMP training (تدريب)
معهد التدريب:
Cambridge education
تاريخ الدورة:
May 2015
المدة:
30 ساعة