Project:
Site Supervision of the Construction of Pre-stressed Concrete Strategic Water Reservoirs in Al Faysaliah & Steel Strategic Water Reservoirs in Jeddah City

CLEINT: NWC National Water Company.

Two groups of tanks with a total capacity of 2, 000, 000 m3, will store and supply water to Jeddah. Located in Faisaliyah and Briman, in the Jeddah urban area, the projects include buildings, infrastructure systems, pumping stations and lines connected to Saline Water Conversion Corporation (SWCC) and NWC lines.

Position Held: QA/QC Chief.
Reporting to: Project’s Manager.

Tracking ID: NWC 103

Accountabilities:

 To collaborate closely with the Projects manager and assume responsibilities of managing daily activities related to QA/QC, directing operations and supervising staff when required in order to assist in actualizing project goals and objectives.
 Being a part of management team, incumbently also holds the responsibility to assist in the setting, implementing, monitoring, and reporting of all required management reports and KPIs for the Area in accordance to the program’s procedures.
 Holding the responsibility for ensuring that all Quality of works are executed in accordance to the client’s requirements to the highest standard through the management of a team of Engineers and Inspectors.
 Attending regular meetings with contractor to ensure the progress on site activities meets the requirements of the construction program
 Manage the site supervision team to ensure that the progress of the work meets the milestones of the project.
 Establishing supervision procedures for the team and monitor during the life cycle of the project
 Ensuring full coordination between all other disciplines of the supervision team and contractor
 Monitoring and review of the team performance, and control team resources and report to the projects manager.
 Implementation of communication procedures and correspondence between supervision team.
 Collect all information from all disciplines and makes a summary and report to the projects manager
 Highlight and make recommendations of all the obstacles on site related to (Team, project, performance, resources) to area manager for action
 Assist in the preparation of the weekly & monthly reports and project status with respect to the project base lines.

QA/QC Manager. في Drake & Skull International.
  • المملكة العربية السعودية - الرياض
  • مايو 2013 إلى يناير 2015

Project:

(ITCC) Information Technology Communication Complex.

CLEINT: Saudi Public Pensions Agency / Rayadah Investment Company.

The Area divided in to four Projects Package 1, Package 2, (DCP District Cooling Plant), and Auxiliary.

Position Held: QA/QC Manager
Reporting to: QHSE Manager.

Tracking ID - 9819.

Accountabilities:
 Daily administrative management of the department staff (all QA/QC Engineers and Inspectors)
 The Day to Day monitoring and maintenance of PQP and specs as per ISO 9001:2008
 Provide inputs, estimates for QA/QC equipment and facilities, man-hour estimates and staffing recommendations, as appropriate for pre-qualification and tender purpose.
 Interact with the project sites and departments in Quality requirements and it conformance.
 Implement the internal audit process for the system as.
 Ensure that the company system is regularly reviewed for its continuing effectiveness and that adherence to procedures is assessed by means of planned and independent internal audits.
 Frequent communication with the certification and governmental bodies regarding the Quality requirements.
 Review and monitor the KPI established for every activity
 Report to the area management and corporate QHSE manager the status of the QMS management system.
 Provide advice, guidance and training on Quality matters within the company and where appropriate within individual projects.
 Coordinate with the consultants employed by company for any of the concerns.
 Attend training and seminars related to Quality
 Lead Corrective/ Preventive action process on NCR trends and customer complaints.
 Raising of non-conformity reports (NCR) and quality Observation report (QOR) Quality surveillance report (QSR) whenever Job work does not confirm to concerned drawings/Specification and site clarification report.
 follow up for look ahead plans and Attending weekly QMS meeting with all the concerned construction managers and QC Manager of sub-contractors to discuss the Quality issues of the last week and make the Completion target in Quality manner
 Committed to company HSE requirements and all applicable legislations and contractual requirements affecting the HSE activities at project site and administrative offices.

QA/QC Manager في AnelKSA
  • المملكة العربية السعودية - مكة المكرمة
  • فبراير 2012 إلى مايو 2013

Project:
‘Al Harmain High Speed Rail Project’ Makkah.

CLEINT: Saudi Railway Organization (SRO).
It’s a mega project of around 400 km track traveling with speed 320 km/h from Madina Munawara to Makkah Mukarama with four stops and four stations including Rabiq and Jeddah.

Position Held: QA/QC Manager.
Reporting to: Project Manager.

Tracking ID - 1333.

Job Accountabilities: As mentioned above.

QA/QC Engineer. في Drake & Skull International Engineering.
  • المملكة العربية السعودية - جدة
  • مارس 2011 إلى فبراير 2012

Project:

Iconic ‘Al Jawhara Tower’ (Damac Properties)

CLEINT: DAMAC PROPERTIES

Is a High Rise Building (Tower) Located on the Jeddah's cornice alongside the red sea, Al Jawhara tower is a deluxe residential tower designed by VERSACHE interior designers & the project consists of 48 floors including Health club and parking.

Position Held: QA/QC Engineer.
Reporting to: QHSE Manager.

Tracking ID: 4777


Accountabilities:
 Preparing and following ITP & MS (Method Statement) which includes Scope of work, Purpose, Abbreviations, References; Responsibilities, Safety and Procedures e.g. Handling & Storage of material, Equipment’s & Tools required, Preparations, Installation and Inspections.
 Review of IFC drawings, approval status, Material availability along with MTC
 Fallowing all procedures of quality control works as per Standards and project specifications
 Material Inspection of all mechanical works like HVAC, PLUMBING, FIRE FIGHTING comply with the approved MSS (Material Submittal Sheet)
 Inspection, Pre-Commissioning & Commissioning inspection of all mechanical works like HVAC, Plumbing, Fire Fighting and verifying the compliance of the works with the project specifications and approved execution drawings
 Clearing the NCR issues with consultants after finishing the work by complying project specifications and standards.
 Monitoring the sub-contractors for the quality and progress of the work to complete the project in dead line timing
 Ensures that the completed site work conforms with the technical specification, drawings, and satisfy the functioning
 Preparing RFI’s for the completion of the work for client
 Monitoring the installation of chillers, pump’s and A.H.U’s to assure the quality and progressive installation.
 Maintain all QA and QC documents legible (e.g. complete, updated and approved).
 Monitor the QA (Quality Assurance) for various activities at site e.g. document controller, stores, to verify its compliance to the company policies and procedures.

Mechanical Engineer. في CR-18th Bureau Group Co. SubCo. Desert Wave
  • المملكة العربية السعودية - مكة المكرمة
  • فبراير 2009 إلى مارس 2011

Project:

AL MASHAAER AL MUGADDASSAH METRO PROJECT (MMMP), MAKKAH, KSA

CLEINT: MOMRA
An 18.1Km line constructed to connect the holy cities of Mecca, Arafat, Muzdalifa and Mina

Position Held: Mechanical Engineer

Employment ID: 18387

Worked Stations- Saudi Electric Co. (SECO) Substation, Arafat area
Electric Eco Path, EEP/1/2/3 (SECO) - Muzdalifa and Mina station

Site Accountabilities:
 Checking the Mechanical equipment submittals prepared by contractors.
 Checking the work progress and quality of work as per the consultant design and quality plan.
 Attaining the onsite meetings from the consultant side with Client, Project Management team, Contractors, Sub contractors.
 Attaining to the Inspection Requests submitted by the contractors.
 Helping the contractors to prepare the as build drawings.
 Providing the Technical Support at the site to the site Engineers, & Site Supervisors.
 Preparing the work progress reports for office information.

HVAC Engineer في Superior Technologies Building Services.
  • الهند - حيدر اباد
  • أكتوبر 2007 إلى سبتمبر 2008

Project Handled:
Vanen Burg I.T Park Phase-II, Hi-Tech City
Residential Project at Banjara Hills & Jubilee Hills

Position Held: HVAC Engineer


Design Accountabilities:
 Working with the team of Engineers for studying Architectural Design, preparing HVAC Concept Designs, Preliminary Designs and Detail Designs.
 Handling heat load calculations of High Rise Building (Towers), Shopping Malls, Five Star Hotels, Hospitals, Residential& Commercial buildings, Factories, luxurious Villas, using software like carrier E-20, Block load 4.15 HAP 4.34, as per ASHRAE Standards.
 Designing suitable Ventilation Systems for different applications like residential buildings, commercial buildings, industrial purpose, car parking basements etc. as per ASHREA Standards.
 Designing suitable Stair Case Pressurization System as per NFPA & local regulations.
 Developing Smoke Management System as per NFPA- 2001 Standards.
 Selecting AC Machines (DX and chilled water systems) like Chillers, Fan Coil Units, Air Handling Units, Fresh Air handling Units (Using SPC Software), Cooling Towers, Heat Exchangers, Package Units and Extract Fans.
 Managing Duct Size Calculations, Chilled Water Calculations, Chilled Water Pipe Sizing, Pump Head Calculations and selecting Suitable Chilled Water Pumps.
 Attending meetings with consultant Engineers and getting approvals for task done.

الخلفية التعليمية

ماجستير, Bachelor of Engineering Mechanical Engineering
  • في M. Tech. Mechanical HVAC
  • يوليو 2007

Specialties & Skills

Project Management
Quality Management

اللغات

الانجليزية
متمرّس