Surveyor
AL ASAB GENERALTRANSPORT & CONTRACTING L L C
Total years of experience :14 years, 3 Months
Oil Pipeline Project Civil Works and Building.
- CLIENT : ADNOC
- Used equipment : GPS (Trimble) -Total Station (Leica - Nikon) - Level (Leica)
- Used software : civil 3d -Google Earth Pro - GIS
- Key responsibility :
- Setup Project Bench Marks & Control Points.
- Survey Reports & Level Sheets Preparation.
- Drawing Study and Review
- Surveying Calculations.
- Quantity Surveying & Material Collect.
- GPS Surveys -As-Built Surveys -Leveling Surveys - Set out Survey - Topographical
Surveys.
- With limited supervision I can prepare method statements and risk assessments.
- Ability To Prepare Work Schedules For Surveyors And Junior Grade Staff.
Building, Infrastructure
- Project : Home Ownership Development (South Dhahran) value: 2.5 $ Billion
- CLIENT : ARAMCO
- Used equipment : GPS (SOKKIA Grx2) -Total Station (LEICA - SOKKIA) - Level (all)
- Used software : SOKKIALINK - AutoCAD
- Project description : Aramco plans to build eight thousand and 521 housing units for its
Employees as well as schools and social facilities on ten thousand
square kilometers in Dhahran so this project make me Dealing with
a big data and working in competitive environment.
Modern Structure and Equipment's (M.S.E).
- Location : Port Said - ARE.
- Company Industry : Marine Construction - Deep Foundation Works - Sheet Piling.
- Project : Quay Wall Structural East Port Said Port Consultant.
- CLIENT
Roads, Infrastructure
- Projects:
1- Site Development Of MATRAFIA
o Client : ARAMCO - Consultant : AECOM
2- Development Of Buffer Zone
o Client : Royal commission - Consultant : BECHTEL
3- Site Preparation Works For KHURAIS Al Crude Increment
o Client : ARAMCO
- Scope of work : The Scope Required the Following Infrastructure Systems As well As
Landscaping: Roads, Storm Drainage, Potable Water, Sanitary Waste Water, Irrigation, Electrical
Power, Street Lighting, Traffic Signaling, channels, Telecommunication and Culverts.
varied
- CLIENT : Fayoum Gas Company
- Key responsibility : Doing the surveying Service before and during the Drilling.
Land Surveyor under Training “