I - ABU DHABI TRANSMISSION& DESPATCH COMPANY -TRANSCO
Senior Water Control Engineer in Abu Dhabi water Control Center (Seb.-2004- July -2012)
JOB DESCRIPTION:
• Monitor, operate and control the water production, transmission systems, DN 2x1200mm (GRP) lines with
Flow rate 27, 000m3/h (142.5Mg/d) From Fujairah, DN 2x1200mm, with flow rate DN 14, 000m3/h (74Mg/d)
From taweelah pumping station to Al ain city.
• Ensure smooth, safe and economic dispatching of water transmission System from production sites to distribution boundary i.e. distillers pumping stations.
• Use the Water Control Center Siemens Germany SCADA, remote control facility to deliver Assured quality and quantity of potable Water, in line with the company safety procedures rules (SSR).
• Preparation, Finalize all related reports and documents, Daily and Annual reports & Forecast targets.
• Check and Approve Application for Work (AFW), Issues Permit To Work (PTW), Check site method of statement if properly implemented.
Water Shift Engineer in Water Control Center Al Ain City (July 2000-Sept.2004)
JOB DESCRIPTION:
• LSX- SCADA Center Operation of water transmission and Distribution systems i.e. Transmission pipelines DN 2x1400mm, DN 2x1200mm, DN 2x900mm, reinforced concrete Reservoirs (4x5MG), 2x20 Mg Steel Tanks, Chlorination and Auxiliary System, Recirculation pumps, Surge Vessels, Air compressors, MOV, FCV. Valves, Fire fighting system, From Taweelah & Fujairah Pumping Station to Al ain city with total daily Target 120mg/d
II- ABU DHABI WATER& ELECTRICITY AUTHORITY- WED
Operation& Maintenance Engineer (September 1997- July 2000)
Job Description:
• Inspection, Supervision of Maintenance works through supervisor with team according to documents and approved drawings.
• Apply preventive Maintenance actions on site of all TRANSCO Water Sub Station and Pumping Station. in Al Ain City For:
Transformer 6.6KV/0.415KV and Tapchanger, Switchgear/Ring Main Station, Diesel Generator, 6.6KV/0.415KV
Motors, LV Distribution Systems, 415V AV, 240V AC UPS, 110V DC, 240V DC, Batteries, HVAC, Recirculation
Pumps, Transmission, Distribution pumps, Anti-Flooding System, Chlorination systems and Auxiliary system.
• Manage electrical materials available in stock according to schedule and site requirements.
OPERATION& MAINTENANCE FIELD
III- Municipality Water Projects - Nile twin line 700 mm water Pipeline Projects-Egypt
Operating & Maintenance Engineer (June 1990 - September 1997)
Job Description:
• Maintenance of water pumping stations with 11 KV/0.380 KV Transformer and A/C Slip Ring motors, switchgears. In water project 2x700mm steel pipe line of total capacity 10, 000 m3/d.
• Preparation of Time schedule for Preventive maintenance works.
CONSTRUCTION FIELD
IV- Engineering Construction Directorate - Projects Department
General Electrical Engineer (July 1984 - June 1990)
Job Description:
• Managing all electrical site activities, Electrical building networks Design, layouts, wiring diagrams. MCB, MSB and MCC lighting panel and Switchgear installations. For Government Bldg , Schools and Universities Bldg, Hospitals and other public bldgs.
• Ensure the coordination in between civil and electrical activities and cover any interface if any.
• Monitor and ensure all electrical site works comply with contract documents and client specifications.
• Preparing documents for tendering (Technical and Commercial Offer)
• Check tender electrical plan drawings, loads and specification, Execute approved design work with maximum supervision.
• Calculate and estimate electrical materials quantity (A Bill of Quantities), and cost as per tender BOQ.
• Planning, Execution, Costing & Preparing Purchase requirements.