Abdelnabi abdallah elsayed ibrahim, Senior Project  Engineer

Abdelnabi abdallah elsayed ibrahim

Senior Project Engineer

Al Kharafi National co.

Lieu
Koweït
Éducation
Baccalauréat, Electrical power and Machines Engineering.
Expérience
24 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :24 years, 7 Mois

Senior Project Engineer à Al Kharafi National co.
  • Koweït - Al Koweït
  • Je travaille ici depuis juin 2006

A-working as project engineer at Ministry of Public Works (MPW) General Services for Operation and Maintenance of Reggae and A9 sewage pumping station.
1. Executing, leading, supervising and coordinating operation and maintenance plans for MPW, sewage pumping station.
2. Analyzes the frequent failures, diagnosing its causes, suggesting suitable treats and supervising corrective action to decrease the probability of those failures
3. Coordinates with manager the technical specifications for all electric spare parts needed to be purchased and their alternatives
4. To Carry out maintenance and repair for switch gear substation, transformer 11KV/3.3 and 11KV/415V
5. To carry out maintenance and repair 11KV, 3.3KV, and 415V sub-station switchgear, 11 KV VCB and low voltage ACB.
6. To carry out maintenance and repair for medium voltage motor, 3.3 KV and low voltage motors different rating from friction hp to 1.5 MW.
7. To carry out maintenance and repair for motor starter, VFD(variable speed drive), SS(soft starter), Star Delta., direct online, MCC, LCP, MOV, ATS and fault rectification in its control. Low voltage lighting system and street light.
B-working as project engineer at Ministry of Public Works General Services for Operation and Maintenance of Egaila sewage pumping station
1.Executing, leading, supervising and coordinating operation and maintenance plans for MPW, sewage pumping station.
2. Analyzes the frequent failures, diagnosing its causes, suggesting suitable treats and supervising corrective action to decrease the probability of those failures
3. Coordinates with manager the technical specifications for all electric spare parts needed to be purchased and their alternatives
4. To Carry out maintenance and repair for transformer 11KV/415V
5. To carry out maintenance and repair 11KV, 3.3KV, and 415V sub-station switchgear, 11 KV VCB and low voltage ACB..
6. To carry out maintenance and repair for medium voltage motor, 3.3 KV and low voltage motors different rating from friction hp to 1.3MW.
7. To carry out maintenance and repair for motor starter, VFD(variable speed drive), SS(soft starter), Star Delta., direct online, MCC, LCP, MOV, ATS and fault rectification in its control. Low voltage lighting system and street light.
and feeder pillar .pressure switch, float switch. Centrifugal pump, submersible pump, A/C Plant and equipment and troubleshooting.
C)- working as Electrical Project Engineer to replacement of existing central air conditioning and ventilation at AZOUR PUMPING STATION AND MINA ABDALLA PUMPING STATION of the State of Kuwait.
The purpose of the project is to improve the performance of the pumps by providing cooler environment in the Pump Hall and to improve air conditioning system in the administration building by installing new A/C system consisting of new A/C Plant and equipment.
1- to prepare as built drawings for modified work
2- to improve and develop the electrical systems and control circuits
3- to lead and supervise construction works
4- to submit, approve interim measurements and evaluation from clients
5- design- calculation of lumen, lux load, current. Consideration for voltage drop rerating of cable, diversity factor, selection of cable, MCB, MCCB, Tray.
6- to do cost estimates and technical studies for other projects Design /review tender document of propose electrical layout drawing. Selection of material and submittal, taking approval by client .preparation /review of quotation, BOQ cost estimation for economical and technical consideration .MR, LPO, checking for the accuracy of delivery report .

project engineer à kharafinational
  • Koweït - Al Koweït
  • Je travaille ici depuis juin 2006

D)- working as Project Engineer for construction works at power stations &water distillation stations of the State of Kuwait.
1- to prepare as built drawings for modified work
2- to improve and develop the electrical systems and control circuits
3- to lead and supervise construction works
4- to submit, approve interim measurements and evaluation from clients
5- design- calculation of lumen, lux load, current. Consideration for voltage drop rerating of cable, diversity factor, selection of cable, MCB, MCCB, Tray.
6- to do cost estimates and technical studies for other projects Design /review tender document of propose electrical layout drawing. Selection of material and submittal, taking approval by client .preparation /review of quotation, BOQ cost estimation for economical and technical consideration .MR, LPO, checking for the accuracy of delivery report.

E )-Maintenance and repair works for Electrical and Control devices with accessories at ministry of electricity &water in different areas of the State of Kuwait, employed as a site engineer responsible for
1- Executing, leading, supervising and coordinating electrical maintenance plans for MEW maintenance of telemetry, electrical and control equipments pumping station, water reservoirs, water towers and water distribution networks
2-Analyzes the frequent failures, diagnosing its causes, suggesting suitable treats and supervising corrective action to decrease the probability of those failures
3- Coordinates with manager the technical specifications for all electric spare parts needed to be purchased and their alternatives
4- To Carry out maintenance and repair for transformer 33KV/11 KV, 33KV/3.3KV, 11KV/415V
5- To carry out maintenance and repair 33KV/11 KV, 33KV/3.3KV, 11KV/415V sub-station switchgear, 11 and 3.3 KV VCB, MOCB, CB SF6, ACB load break switch, fuse / fuse switch .3, 3KV vacuum, air contactor .
6- To carry out maintenance and repair for medium voltage motor 11 kv, 3.3 kv and low voltage motors different rating from friction hp to 1.3MV .
7-To carry out maintenance and repair for motor starter, VFD, SS, Star Delta. Auto transformer, direct online, MCC, LCP, MOV, ATS and fault rectification in its control. Low voltage lighting system, street light and feeder pillar .pressure switch, float switch .barrier gate -- centrifugal pump, submersible pump
8- to prepare as built drawings for modified work.

Electrical engineer à El-Kureimat Thermal Power Plan
  • Egypte - Le Caire
  • juin 2002 à juin 2006

Since 6\ 2002 - 6\2006.
Working as electrical maintenance engineer in El-Kureimat Thermal Power Plant (2X627) MW
Responsible for step up transformer (3x1ph -23/500kv)high voltage switch gear 500 KV auto transformer 500/220 KV -Switch gear 220 KV - start up transformer (220/6.6KV)-unit auxiliary transformer 23/6.6 KV-low voltage & medium voltage-Control & protection for motor in power station

1- Preventive, shutdown maintenance of plant electrical equipments.
2-Troubleshooting of power and control electrical circuits.
3-Modification and rectification of control, metering, indication & protection circuits.
4- Analyzes the frequent failures, diagnosing its causes, suggesting suitable treats and supervising corrective action to decrease the probability of those failures
5- Coordinates with manager the technical specifications for all electric spare parts needed to be purchased and their alternatives
6-To Carry out maintenance and repair for transformer 23KV/500 KV, 500KV/220KV, 220KV/6.6kV, 6.6kv/415v
7- To carry out maintenance and repair sub-station switchgear, 500 and 220 KV SF6, CB SF6, ACB load break.
8- To carry out maintenance and repair for medium voltage motor 6.6 kv and low voltage

Electrical maintenance engineer à Maasara for Engineering Industries Co. (Ex. 45 Factory).
  • Egypte - Le Caire
  • octobre 1999 à juin 2002

Working as as electrical maintenance engineer r in the Electrical maintenance department - Responsible for

1-.Executing, leading, supervising and coordinating electrical maintenance and control equipments.
2-.Analyzes the frequent failures, diagnosing its causes, suggesting suitable treats and supervising corrective action to decrease the probability of those failures
3-Coordinates with maintenance manager the technical specifications for all electric spare parts needed to be purchased and their alternatives
4-To repair production line- Maintenance Of Presses (from 2 ton to 900 ton) -Plastic Injection Machines -Automatic lathes( 6 spindles)
5-Modification and rectification of control for old conventional relays control panels and new control panels -based on PLC
6-To carry out preventive maintenance for .AC motors (Rating ranges are 2 MW, 1.5 MW & 0.5 MW) & DC motors (Rating ranges are 90 kW to 200 KW) and troubleshooting faults
7-To carry out preventive maintenance for over head crane -Dealing with the following types of PLC & Inverter systems: Toshiba, Mitsubishi, Allen Bradley& Siemens (Step 7) troubleshooting faults.

Éducation

Baccalauréat, Electrical power and Machines Engineering.
  • à Cairo Faculty of Engineering
  • juillet 1999

1994 - 1999 College::Cairo Faculty of Engineering, Cairo University Department: Electrical power and Machines Engineering. Graduation grade: Good (70.38%) as a total grade. Graduation Project Title "Automatic control" Description - Development control system for ship unloader (Develop a PLC -based control system for ship unloader) Project Grade: very good

Specialties & Skills

Power Electronics
Power Distribution
control system maintenance
Project Coordinating
Site Plans
Microsoft Office software & the Internet- Expert. Programming language :Q-Basic, FORTRAN, Pascal, C
Working under pressure
Communication skills
Trouble shooting
Decision maker
Electrical Skills

Langues

Arabe
Expert
Anglais
Moyen

Adhésions

نقابة المهندسبن المصريين
  • مهندس كهرباء
  • July 1999
نقابة المهندسبن المصريين
  • مهندس كهرباء
  • July 1999
نقابة المهندسبن المصريين
  • مهندس كهرباء
  • July 1999

Formation et Diplômes

. Basic course on (programmable logic control “PLC") (Formation)
Institut de formation:
2005 Cairo south training centre. Basic course on (programmable logic control “PLC")
Date de la formation:
January 2005
trained on studying feeder, generators ,transformers , electrical motors, C.B and, GIS power statio (Formation)
Institut de formation:
- Cairo west power station
Date de la formation:
July 1996
C.B and, GIS power station500kV,220kVstudying generators and transformer protection circuit studying (Formation)
Institut de formation:
- Cairo west power station
Date de la formation:
July 1997
Training course on (frequency converter) (Formation)
Institut de formation:
technology competency center
Date de la formation:
October 2004
Training course on (operation of combined cycle power stations) (Formation)
Institut de formation:
Egyptian electricity holding company – Damietta thermal power plant
Date de la formation:
September 2004
Training course (Introduction to programmable logic control PLC) (Formation)
Institut de formation:
Control & Instrumentation Systems Tech CO.
Date de la formation:
August 1997
Training on (maintenance &operation electrical machine equipment) (Formation)
Institut de formation:
Egyptian society of engineers-society of electrical engineers
Date de la formation:
August 2004
trained on studying sub_ station, generators ,transformer, power factor correction panels ,speed (Formation)
Institut de formation:
sugar and its integrated Industries Co.
Date de la formation:
August 1997
training on –Power Electronics &sensor technology (GTZ) controlling AC (Formation)
Institut de formation:
GTZ
Date de la formation:
April 2004
Training course on transformer tap changer (Formation)
Institut de formation:
Cairo south training cent re.
Date de la formation:
May 2005