Civil Site Engineer,KHALIFA AVENUE ROAD (QPR DUKHAN ROAD EAST CONTRACT P005) – QD-SBG (Main contract
QD-SBG construction
مجموع سنوات الخبرة :14 years, 4 أشهر
• Execution of all civil works as per contract drawings and specifications.
• Implementing plans and direction of site management.
• Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
• Handing over the project to the client Ashghal.
• Closing the snags issued by parsons and Ashghal.
• Responsible for resolution of all technical issues related to civil works.
• Coordination with subcontractors / suppliers and other disciplines.
• Plan and control, material and equipment logistics.
• Preparation of daily activities and analyzing / improving site methodology of execution.
• Directing team for proper achievement and fulfillment of the tasks.
• Control of site production rates and distribution of resources.
• Quantity take-off including preparation of price analysis cost comparison, Estimate quantities and cost of materials, equipment, or labor to determine project feasibility, prepare internal and external BOQ’s and prices
• Review all Contractor submittals related to his discipline addressing Method Statements, Project Quality Plan, Safety Plan, Schedules and compliance with Project objective.
• Estimate quantities and cost of materials, equipment, or labor to determine project feasibility.
• Provide technical advice to industrial or managerial personnel regarding design, construction, or program modifications or structural repairs.
• Plan and design transportation or hydraulic systems or structures using computer assisted design or drawing tools.
• Direct or participate in surveying to lay out installations or establish reference points, grades, or elevations to guide construction.
• Direct engineering activities ensuring compliance with environmental, safety, or other governmental regulations.
• Manage and direct the construction, operations, or maintenance activities at project site.
• Test soils or materials to determine the adequacy and strength of foundations, concrete, asphalt, or steel.
• Ensuring all materials used and work performed are as per specifications
• Conduct studies of traffic patterns or environmental conditions to identify engineering problems and assess potential project impact.
• Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
• Manage and direct the construction, operations, or maintenance activities at project site.
• Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
• Execution of all civil works as per contract drawings and specifications.
• Estimate quantities and cost of materials, equipment, or labor to determine project feasibility.
• Assist the project management in all stages of the project.
• Preparation and submitting of CAC file to Lusail Real Estate Development Company for revising and getting permit to start to work.
• Responsibilities:
• Insuring steel cages are fixed as per approved drawings
• Management of the steel yard.
• Supervision of welding lifting hooks.
• Supervision of fixing lifting bars of the cages
• Supervision of fixing anchor sleeves
• Guide wall supervision.
• Responsibilities:
• I was fully responsible of managing, controlling, and executing these projects.
• Execution of all civil works as per contract drawings and specifications.
• Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
Projects executed
• (B+G+M+7) hotel building in bin Mahmoud, Doha, Qatar.
• Compound of 10 villa (G+1+P) in Sukhama, Doha, Qatar
• 3 villa(G+1+P) in Rawdat alhamam in Doha, Qatar.
• A 10 villa compound in west bay lagoon Doha-Qatar.
• A palace of (B+G+1+P) in Dafna, Doha, Qatar
• (G+4) residential building in Al nasr, Doha, Qatar
first division(68%)