1.Maintain document logs for correspondence, material approval submittals, shop drawing, RFI (incoming & outgoing).
2.Receive and distribute all documents. Preparation transmittal sheets for Inspection Requests, Material & Shop drawing submittals and Filing etc.
3.Store & registrar original & electronic documents, update information in the electronic management system.
4.Assist project staff in creating document to project standards, work closely with the project management team. Process all requests and documentation in accordance with prescribed procedures
5.Ensure that all technical documents are filed and stored correctly for easy retrieval and use.
6.Ensure the transmission of document from/to client/vendor/sub contractor/inside office/filing system in properly manner
7.Create and maintain document control system and relevant production documentation
8.Filing, scanning and photocopying, daily routine activities of Document Control, including distribution of documents, maintaining electronic folders and directories, tracking and retrieval of documents and drawings.
9.Maintain registers of all receipts and issues or submissions of documents and correspondence.
10.Expedite the return of documents and approvals or comments within the required time period from internal and external parties to whom they have been issued or distributed.
11.Ensure the effective running of the day-to-day operations of the document center.
12.Hands on experience in identifying, sorting of Engineering Documents and drawings.
13.Register, log, distribute, track, issue, maintain and control office and site project documents and drawings.
14.Coordinate the activities of Document Control, including distribution of documents, tracking and reporting on document review progress.
15.Assist with the implementation, management & administration of electronic document management system.
16.Perform document control & Quality management activities.
17.Maintain procedures for maintaining documents and manage change control of documents.
18.Reporting on the performance of the document control system for review and as a basis for improvement of the documents control system.
19.Ensure Project Team & contractors comply with the document management system process and procedures.
20.Work closely and liaise with contractors’ document control group in all matters relating to document control.
21.Maintain document logs for correspondence, material approval submittals, shop drawing, RFI (incoming & outgoing).
22.Receive and distribute all documents. Preparation transmittal sheets for Inspection Requests, Material & Shop drawing submittals and Filing etc.
23.Ensure compliance with quality assurance requirements at all time. Coordinate engineering key performance indicators.
- Company industry:
- Construction & Building
- Job role:
-
Administration