Project coordinator
NPCC
Total years of experience :13 years, 2 Months
ABDUL BASIT
B.Sc. Electrical Engineer
Cell No:+966-59-6723815
Email:
Nationality : Pakistani
Discipline : ELECTRICAL (MAJOR IN POWER)
HV/EHV
OBJECTIVE:
Seeking employment as Representative in a Reputable Organization, where I could expose my professional commitment, practical experience, adaptability, dynamism and enterprise that I have acquired through experience in different fields of Power, Control and Protection.
EDUCATION:
Bachelor’s of Science in Electrical Engineering with Major in Power
University of Engineering and Technology, Pakistan
Grade: A
EMPLOYMENT HISTORY:
Position Held
NPCC
(National Power)Ltd. KSA
May 2011 To-date NGSA CONTRACT # 31131145/00 & 31131146/00
Installation of 380kV D/C Overhead Lines (OHTLs) with length 102Km & 42 KM, From Jeddah South PP to the Proposed Al-Masha’ar 380 kV GIS Substation.
continuous involvement in preparation, coordination & follow-up for design submittals: i.e
Technical Submittals, Route Drawings, Plan & Profile Drawings and Structure Lists etc with the Clients / Consultants.
Calculation of Bill of Materials (BOM)/BOQ’s.
Logistical control of materials including Testing and Inspections at Manufacturer's Works and Supervision of all progress reporting.
Route Survey, Construction of Access Roads / Structure Pads, Excavation for the tower foundations.
Tower grounding along with the stringing of OPGW.
Tower assembly and tower erection.
Stringing of Conductors & Shield Wires and Testing & Commissioning of Transmission Lines.
PLS-CAAD trainer to my juniors.
PLS-CADD certified from power systems.
Daily site coordination with SEC and with H.O.
Weekly progress reports and monthly progress charts preparation along with designs.
Plan & profile designing for OHTL.
Provide technical assistance to the project team at all times and constantly involve in all site activities.
Assure construction projects are completed in compliance with drawings and specifications, within Schedule & allocated budget.
Monitor & ensure the execution of works per to the good engineering practices.
•Equipment & Material Proposal and Technical Submittals as per PTS, SEC Standards.
• Design Coordination with Contractor and Sub- Contractor’s to overcome various shortcomings in their proposed Design Submittals.
• Installation of Cable Trays and cable ladders in the basement of GIS S/S.
• T&C of 110 kV GIS S/S.
One week Safety training from OSHA safety Institute Jeddah.
3 months worked as safety engineer on the Site.
My progress during education was very good and Outstanding. My Final Year Project was design and fabrication of power transformer.