Sr. Electrical Engineer
Power Plant
Total des années d'expérience :11 years, 0 Mois
❖ Led and managed successful User Acceptance Testing (UAT) of 1MW generator's AVR, ensuring seamless performance validation.
❖ Economized power distribution through implementation of a cost-effective 400kW grid tie inverter solution, resulting in optimized energy allocation and significant cost savings.
❖ Designed and assembled LV switchgears, enhancing motor control efficiency and reliability.
❖ Successfully led installation and functional testing of SIEMENS-SIPROTEC 4 7VU68 high-speed bus transfer device (HSBT) on MV system.
❖ Rapidly troubleshooting of excitation system of 1MW Turbine Generator, minimizing downtime and ensuring uninterrupted power generation.
❖ Initiated and conducted an energy audit, resulting in a monthly reduction of 31Tons of CO2 emissions and savings of 31, 000 kWh.
❖ Contributed to the green energy drive by designing 10kW grid tie inverter solar systems for office sites, demonstrating the financial and environmental benefits.
❖ Successfully managed installation and commissioning of electrical systems in a power plant project, adhering to project plans and schedules.
❖ Oversaw installation, configuration, and functional testing of SIEMENS 440/430 VFDs and 200kW INVT VFDs, ensuring optimized performance.
❖ Led and managed UAT of a frequency converter for a special motor, validating system functionality.
❖ Provided technical expertise and valuable suggestions for electrical system design documents and technical specifications of a production facility.
❖ Planned and executed testing and commissioning of centrifugal pumps up to 75kW, ensuring optimal performance and adherence to standards.
❖ Demonstrated expertise in testing and troubleshooting of solenoid valves, meeting tight deadlines.
❖ Conducted testing & qualification of centrifugal pumps for BOP systems, ensuring compliance with performance standards.
❖ Prepared & obtained approval for commissioning, testing, and qualifications reports, coordinating stakeholders for accurate documentation.
❖ Developed comprehensive installation, testing, & commissioning procedures in adherence to relevant codes and standards, ensuring high-quality outcomes.
❖ Operated Balance of Plant (BOP) systems as a shift engineer in the power plant control room, maintaining safe and efficient operations.
❖ Led the planning, installation, testing & commissioning of LV switchgears, LV Motors, Motor Control Centers (MCCs), Air Circuit Breakers (ACBs), and MV (11kV) switchgears from leading manufacturers like ABB, SIEMENS, and Schneider, ensuring seamless integration, functionality, & compliance with codes and standards.
❖ Performed testing & commissioning of 500VDC 2000AH battery banks, ensuring their reliable operation.
❖ Conducted functional testing & configuration of Gutor-500VDC rectifiers ensuring their proper functionality in the system.
❖ Successfully completed testing & commissioning activities for a 1000KVA emergency diesel generator, ensuring its readiness for backup power supply.
❖ Conducted testing & commissioning of electrical components for HVAC and chiller systems, including dampers, pressure & flow transmitters, and Programmable Logic Controllers (PLCs), ensuring optimal performance.
❖ Ensured the functionality and reliability of the fire water system through testing & commissioning activities, including Motor Operated Valves (MOVs) and pressure and flow transmitters.
❖ Designed control wiring for Motor Control Centers (MCCs), ensuring efficient and organized electrical connections.
❖ Performed functional testing of Siemens PLC S-300 for a 20RT Chiller, HVAC system, and Sewage Treatment Plant, ensuring proper control & automation.
❖ Conducted functional testing of ABB Distributed Control System (DCS) for power plant operations and pump test rigs, ensuring their effective control and monitoring capabilities.
❖ Verified and configured the ComAp controller of a diesel generator, ensuring its proper functionality and synchronization with the power system.
Designed electrical layout for Under Ground Tank for LUCKY ONE PROJECT KHI.
Designed Basic Facade Lighting for LUCKY ONE PROJECT.
Managed Work Inspection Reports and different project dealing of LUCKY ONE PROJECT.
Simulated lighting design of Under Ground Tank ON DiaLux for LUCKY ONE PROJECT.
Calculations have been done for the connected load in CREEK VIEW HUT AT PHASE 7 DHA, different loads consist lightening load, non-motorized load, motorized load.
Load flow analysis has been done for Creek View Hut.
Designing of Circuit Breaker and Cables have been done for motorized and non-motorized load connected in Creek View Hut.
Generator rating has been calculated for Creek View Hut.
Calculations have been done for connected load in RADAR AND RADIO BUILDING BENAZIR BHUTTO INTERNATIONAL AIRPORT.
Circuit breaker and cable designing of motorized and non motorized load for Radar and Radio Building BBI Airport.
Generator rating has been calculated for Radar and Radio Building BBI Airport.
Project Management