Abdul-hameed  nassar PMP , Senior Planning Engineer

Abdul-hameed nassar PMP

Senior Planning Engineer

MOHAMMED AL RASHID COMPANY (MARCO)

Lieu
Arabie Saoudite
Éducation
Baccalauréat, Engineering
Expérience
9 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :9 years, 11 Mois

Senior Planning Engineer à MOHAMMED AL RASHID COMPANY (MARCO)
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis mars 2021

Project Name: Completion Of Fit-Out Works For Parce L3. 0 4
Owner: Saudi Industrial Development Fund
Third-party management: JLL
Consultant: Q Design
Value: 140, 142, 576.47Sar
Duration: 19 Months
Completion Date: JULY 2021
Location: King Abdullah Financial District Riyadh -Saudi Arabia
Built Up Area: 22, 080M2Project Name: Completion Of Fit-Out Works For Parce L3. 0 4 Owner: Saudi Industrial Development Fund Third-party management: JLL Consultant: Q Design Value: 140, 142, 576.47Sar Duration: 19 Months Completion Date: JULY 2021 Location: King Abdullah Financial District Riyadh -Saudi Arabia Built Up Area: 22, 080M2
Skills: Project Scheduling · Project Managers · Procurement · Planning & Scheduling · Performance Reviews · Cost Control · Key Performance Indicators · Interpersonal Communication · Decision-Making · Analytical Skills · Organization Skills · CPM Scheduling · Interior Fit-out · Planning · Problem Solving · Project Plans

Planning & Cost Controller à SAFID Co Ltd
  • Arabie Saoudite - Riyad
  • mars 2018 à mars 2021

Project Owner: ADA (Arriyadh Development Authority)
Main Contractor: BACS Consortium (Bechtel, Al Mabani, CCC & Siemens)
Project Name: Riyadh Metro
Project Scope of Work: Supply & Install Walkways & Fences across Lines 1 & 2 of Riyadh Metro

Project brief: Our client (BACS Consortium) has requested us to supply & install walkways and fences across the whole length of lines 1 & 2 of the Riyadh Metro Project.
The scope of work will include the supply and install of the required materials for this project. Some of the material will be manufactured by SAFID and others will be procured from international and local markets. SAFID will also hire a local sub-contractor to install the material on site.

Courses

-Responsible for managing the cost & schedule control of the project.
-Generation and supervision of periodic cost & schedule reports such as Progress and Earned Value
The report, Critical Path, 6-month look ahead, Cost Deviation analysis, etc.
-Work with Project Managers and PMO to obtain and analyze the project performance proactively
identifying areas of risk.
-Responsible for creating and keeping all project schedules current.
-Supervises internal or external staff participation in project meetings
-leveraging schedule time and cost analysis to drive project performance
-to ensure Schedulers/Cost Controllers are correctly reconciling costs with specific work packages and reported outputs in sufficient detail for Project Manager.

Planning Engneer à Al Bawani Co. Ltd.
  • Arabie Saoudite - Riyad
  • janvier 2015 à mars 2018

Project Name: ( MINISTRY OF FOREIGN AFFAIRS MOFA PROJECT).
Contract sum: 262, 608, 205 SAR.
Project Description:
'IDS (Institute of Diplomatic Studies - Consular Affairs Department
Building) project situated in a parcel of land Nasiriyah, north of Riyadh, with an
approximate total area of 15, 000 square meter, the building containing a built
up area of 45, 500 square meter and the external work with an area of 10, 888
square meter. IDS building comprises of; one basement intended for parking,
service area and major MEP equipments location, ground floor up to 5th floor and
having roof top illuminated with roof lights.
IDS project is highly equipped with 10 units escalators and 15 units elevators of
different capacities and number of stops, complete MEP equipments, security
and access control system, lighting control system.

I am responsible for planning, Scheduling, Reporting and monitoring the execution to achieve the target dates.

My duties are summarized below:

•Prepare schedules to reflect the work to be undertaken in line with the required Work Breakdown Structure.

•Resource loading in order to produce manpower histograms and Planned ‘S Curve’.

•Prepare and update on a weekly basis a Progress Reports.

•Undertake periodic updates of schedules to show progress and impact of any trends or variances.
•Weekly update physical progress against baseline schedule.

•Prepare revised baseline schedule based on additional works and productivity rate.

•Issue S-Curves, histograms, two weeks look ahead, progress pictures monthly reports.

•Prepare the Extension of Time application to the Client.

site engineer à United Friends Co
  • Arabie Saoudite - Riyad
  • juin 2014 à janvier 2015

- managing parts of construction projects.
- overseeing building work.
- checking technical designs and drawings to ensure that they are followed correctly.
- supervising contracted staff.
- ensuring projects meet agreed specifications, budgets or timescales.
- providing technical advice and solving problems on-site.
- preparing site reports and filling in other paperwork.
- ensuring that health and safety and sustainability policies and legislation are adhered to.

Éducation

Baccalauréat, Engineering
  • à MUST-Misr University for Science & Technology
  • août 2014

• Bachelor degree of Construction Engineering from MUST-Misr University for Science & Technology in 2014

Specialties & Skills

MS Office Automation
Primavera
ساب 2000
Drawing using AutoCAD
AUTOCAD
RADIOLOGY
CONCRETE
ENGINEER
CIVIL ENGINEER
COST CONTROL
DRAWING
PRIMAVERA
MS OFFICE
MICROSOFT OFFICE

Langues

Arabe
Expert
Anglais
Expert

Adhésions

Project Management Institute
  • member
  • September 2020
Saudi Council of Engineers
  • member
  • July 2014

Formation et Diplômes

PMP Project Management Professional (PMP)® (Certificat)
Date de la formation:
December 2020
Valide jusqu'à:
December 2023
Egypt (Formation)
Institut de formation:
The Arab Contractors (Egypt)
Date de la formation:
July 2013
Durée:
40 heures
Egypt (Formation)
Institut de formation:
the Ministry of Housing & Urban Development (Egypt)
Date de la formation:
August 2012
Durée:
40 heures

Loisirs

  • الرياضة بشكل عام