Abdul Mannan, Consultant

Abdul Mannan

Consultant

Beaver Infr

Location
India - Delhi
Education
Master's degree, Geology
Experience
8 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :8 years, 9 Months

Consultant at Beaver Infr
  • My current job since September 2015

New Panvel Mumbai.

Project in- charge and Geologist at SM Consultancy
  • India
  • to January 2011

Geo-tech related investigation of soil and Rock mechanics in both field and laboratory.
•In the field I have to done my duties to conduct the Drilling, Boring to collect the samples of soil and rocks.
•In the field I have to play as a role of Geologist to collect the Regional geology of the project area.
•In the field myself have found sometimes as Surveying and mapping with the survey team.
•I have usually sent to hold to deal a new project of their requirement as a representative of the company.
•I have done my duties and responsibilities as the site- in- charge and Geologist.
•After getting the results, I have found as project report writing in the computer lab also.
I have to directly reporting to the Managing Director (MD) of the company..
LIST OF PROJECTS ON WHICH THE PERSONNEL HAS WORKED

Sr. Geologist at Beaver infra Consultant pvt ltd
  • India
  • December 2016 to

Abdul Mannan
Geo-tech Geologist (HEP)
Mud Logger Geologist (MLU)
Sr. Geologist (Tunnel)












Abdul Mannan, Sr. Geo-tech Engineering Geologist (Hydral & Tunnel - project) and former Sr. Well Sites Mud Logger Geologist (MLU) of OIL & ONGC

Chief- in- Charge at M/S SM Consultancy
  • India
  • to

And looked after Pre & Post Geotechnical investigation, Field, survey, Drilling, planning, Geo-tech Report Submit & billing on that project.
3) Construction of 9 MW of Rima Ghat Hydro Electric Power (HEP) in, Kharsang district of Arunachal Pradesh. Worked as Chief-in-Charge and Geo-tech Engineering Geologist of the project for representative of M/S Sanjib Services Consultancy Guwahati Assam and looked after Pre Geotechnical & Post Geotechnical investigation, Field, survey, Drilling, planning, Geo-tech Report Submit & billing on that project.



Construction of 9 MW of Dilli-Ghat Hydro Electric Power (HEP) in, Disang river of Nagaland. Worked as Chief-in-Charge and Geo-tech Engineering Geologist of the project for representative of M/S Sanjib Services Consultancy Guwahati Assam and looked after Pre Geotechnical & Post Geotechnical investigation, Field, survey, Drilling, planning, Geo-tech Report Submit & billing on that project.
4) Construction of 63 MW of
Dardu Hydro Electric power (HEP) project at Papum Pare River District, Arunachal Pradesh.(Client: KVK -ECI Hyderabad) Worked as Chief-in-Charge and Geo-tech Engineering Geologist of the project for representative of M/S Sanjib Services Consultancy Guwahati Assam and looked after Pre Geotechnical & Post Geotechnical investigation, Field, survey, Drilling, planning, Geo-tech Report Submit & billing on that project.
5) Construction of 63 MW of Toru Hydro Electric power (HEP) project at Papum Pare River District, Arunachal Pradesh (Client: KVK -ECI Hyderabad) Worked as Chief-in-Charge and Geo-tech Engineering Geologist of the project for representative of M/S Sanjib Services Consultancy Guwahati Assam and looked after Pre Geotechnical & Post Geotechnical investigation, Field, survey, Drilling, planning, Geo-tech Report Submit & billing on that project.
6) Construction of 54 MW of Saghalee Hydro Electric power (HEP) project at Papum Pare River District, Arunachal Pradesh (Client: KVK -ECI Hyderabad) Worked as Chief-in-Charge and Geo-tech Engineering Geologist of the project for representative of M/S Sanjib Services Consultancy Guwahati Assam and looked after Pre Geotechnical & Post Geotechnical investigation, Field, survey, Drilling, planning, Geo-tech Report Submit & billing on that project.
7) Carried out more than TEN Well’s Complication report/ Well Resume/ Well Construction Diagram/ Lithology/Laboratory testing/ Casing Cementing/ Logging/Hermonical testing/Production testing etc were done in Rig sites of OIL & ONGC. Worked as Sr. well sites Mud logging Geologist Monitoring the MUD Logging Unit (MLU) - RT Main, RT Graphics & Play- back.
Maintain the up to Date Data on regular wise - DPR/DMR/DGR, MIS, STBU, Master Log, ROP data, Gas Data, D - exponent log, Composite Log, Pipe Tally, Casing Tally, Casing & Cementing Details, Well Construction Diagram (WCD), Well Resume, Well History, Well Complication Report (WCR), Drilling progress plot, Lick of test plot (LOT), Pressure Integrative test (PIT), Casing integrative test (CIT), Formation Integrative Test (FIT), Deviation Data, Equivalent mud wt (EMW), Calculated Lag time, Shale Factor & Shale Density, Wait on cement (WOC) Calcimitry Test, logging data, Site Wall Coring etc.

Sr. Geologist at Beaver infra Consultant pvt ltd
  • to

Mumbai and former Sr. Mud logger Geologist in MLU of Jindal Drilling & Industries pvt ltd. Mumbai under OIL & ONGC.

Education

Master's degree, Geology
  • at GAUHATI University (GU)
  • December 2010

Master Degree in Geology from Gauhati University Guwahati Assam India

Specialties & Skills

Drilling
Logging
Rock Mechanics
Testing
Laboratory Research
CONSULTING
CUSTOMER RELATIONS
GRAPHICAL USER INTERFACE
PROGRESS
REPORT WRITING
REQUIREMENTS

Languages

English
Intermediate
Hindi
Expert