Maintenance Engineer
Mezzan Holding Co.
مجموع سنوات الخبرة :9 years, 5 أشهر
● Directed cross-functional team of 8 people to seamlessly execute breakdowns of production machines and utilities
● Increased operational efficiency up to 90% in Sidel & Krones water bottling production machine through preventive maintenance
● Executed a project to install and commission 5 gallon bottled water manufacturing machine of Siapi & Bardi
● Developed vendor relationships in Kuwait market for negotiating prices of critical spare parts
● Conducted weekly data analysis and determined shortage of stock order quantities by 10%
● Implemented vacuum pumps for suction of process fumes, thus protected damage to Cling Film Roll in hot and humid climatic conditions at 50⁰C
● Advocated 5S system which led to 15% increase in line productivity
● Evaluated with senior managers to install 50TR chiller which improved process operation in summer
● Lowered 40% product infestation by mounting electric insect killer lamps
● Introduced 3 numbers of ionizers and eliminated static charge from the surface of Cling film roll
● Installed 5 numbers of FTTH (Fiber to the Home) Optical fiber cable manufacturing machines
● Trimmed 5% electricity meter count by operating cooling tower fan based on process sump temperature
● Slashed 30% spares consumed by replacing fibrous material of extrusion heater wires with Teflon
● Modernized the detection of flow of petroleum jelly in mild steel pipes by introducing TED-6 jelly Pressure Transducer and PIC 152A process indicator
● Accelerated line speed from 350MPM to 450MPM by synchronizing yarn and fiber motor assembly and their VFD
● Improved system to drain moisture from air receiver tank automatically by designing control circuit with SELEC 800XC timer
# Implemented a Working model of Intelligent energy meter through GSM modem # Conducted Seminar on energy saving through LED's (Light Emmitting diodes)