• Project Name: R989 Foot Bridges at Al Etihad Road, King Faisal and King Abdul Aziz Streets
Sharjah-United Arab Emirates
Category: Infrastructure - Footing bridges
Value: 21.55 Million AED
Client: Sharjah Roads and Transport Authority .
Consultant: Jacobs ( Ch2m ).

• Project Name: R1141/2A - Sharjah BRT - Infrastructure Works at Aquarium, Al Tawun and Muweilah
Dubai Part, Dubai -United Arab Emirates
Category: Infrastructure - Access Road & Utilities.
Value: 9.5 Million AED
Client: Sharjah Roads and Transport Authority and RTA .
Consultant: Parsons Overseas Limited .

infrastructure construction manager في El Seif Engineering Contracting
  • الإمارات العربية المتحدة - دبي
  • مايو 2015 إلى يوليو 2018

• Project Name: Mohammad Bin Rashid Al Maktoum City District 11 (1500 Villa)
Dubai - United Arab Emirates
Category: Infrastructure - Villa community roads and utilities .
Value: 2.1 billion AED
Client: MEYDAN Group.
Project Manager: Turner Project Management
Consultant: AE7 Morse consultant.
Description: The Project Conveniently located on a 950, 000 square meter plot of land at the corner of Al Ain Road and Mohammed Bin Zayed Highway, The 1, 500 semi-detached four-bedroom villas are carefully designed to meet the airline’s high standards, with large 300 square meter living spaces boasting quality fixtures and fittings including construction of all associated infrastructure networks such as completed networks of storm water, sewerage, street lighting, Etisalat, irrigation and fire fighting with associated pumping station, secondary irrigation and all associated soft scape and hard scape furniture and lighting, road works (sub grade, sub base, road base, asphalt ) with all associated road markings, HV network construction including substation, LV network construction including feeder pillars and connection to 1500 villa .

construction manager في BESIX
  • الإمارات العربية المتحدة - دبي
  • يوليو 2007 إلى مارس 2015

• Project Name: R979/1- Pedestrian Bridges at Al Safouh Tram Stations 4, 6, 7 & 9
Dubai - United Arab Emirates.
Category: Infrastructure - Railway
Value: 46.8 million AED
Job title: Construction Manager (May 2014 till to March 2015).
Client: RTA (Roads & Transport Authority)
Consultant: SYSRTA
Description: Design and Construction of four (4) bridges at Al Safouh Tram Stations 4, 6, 7 & 9 including study of pedestrian movement to determine the width of the bridges, stairs and capacities of lifts / elevators, defects liability and decennial liability.


• Project Name: Cleveland Clinic Abu Dhabi, Abu Dhabi - United Arab Emirates
Category: Buildings - Hospital
Value: 4.705 billion AED
Job title: Deputy Construction Manager (Aug 2010 - Apr 2014).
Client: AL DAR (MUBADALA).
Project Manager: Jacobs Project Management.
Consultant: KEO International.
Description: Construction of a 360 bed Clinic, a Car park & technical buildings, totalling a built-up area of 400.563 m², on 3 podium levels + 22 levels, height of the building: 135 m. This is a mixed structure concrete/steel . This building has been designed with a deep concern for the environmental issues: water treatment, solid waste, medical waste, and energy savings.
• Project Name: AL Safouh Tramway Transit System (D&B) Dubai - United Arab Emirates
Category: Infrastructure - Railway
Value: 4.552 billion AED
Job title: Project Engineer (Aug 2009 - Aug 2010)
Client: RTA (Roads & Transport Authority )
Consultant: SYSRTA
Description: Detailed & final design, geotechnical investigations & topographical surveys, utilities relocation and protection, construction, supply and installation of the Dubai Al Safouh transit system including: Track platform: 12, 658 lm; Elevated Viaduct: 3, 321 lm; Bridges: 400 lm; Tram stations: 19 no’s; one depot including earthworks, piling, concrete works, granite flooring, paving, roads, landscaping and planting.
• Project Name: Palm Deira Access Bridges, Dubai - United Arab Emirates
Category: Infrastructure - Bridge
Value: 556.6 million AED
Job title: Project Engineer (Mar 2008 - AUG 2009 ).
Client: Nakheel
Consultant: PARSONS Overseas Limited.
Description: The project consists of two major bridges and associated in-situ concrete retaining walls. Scope includes also the construction of roadways, signage and pavement marking, street lighting & R.T.A. road lighting works.
• Project Name: AL Garhoud Bridge Widening, Dubai - United Arab Emirates
Category: Infrastructure - Bridge
Value: 502.81 million AED
Job title: Section Engineer (Jul 2007 -Mar 2008).
Client: RTA (Roads & Transport Authority) .
Consultant: Halcrow International.
Description: Construction of a new seven lane dual carriage way bridge, length 520 m, width 75m , Construction of approach embankments and retaining walls. Road works, connecting to existing roads with all associated infra-structure, Demolition of existing bridge and access roads.

site civil engineer في Bin Hafeez General Contracting
  • الإمارات العربية المتحدة - دبي
  • مايو 2005 إلى يونيو 2007

• Project Name: Contract R 800/3A ( Ras Al khor Crossing) Dubai - United Arab Emirates
Category: Infrastructure - Roads & Utilities
Value: 607 million AED
Job title: Site Civil Engineer (Jul 2006 - Jul 2007).
Client: RTA (Roads & Transport Authority) .
Consultant: PARSONS Overseas Limited.
Description: The Project comprises of eleven (11) Bridges grouped into two major interchanges which connect the new Ras Al Khor Main Road to the existing OUD Metha and 2nd Za’abeel Roads. The OUD bridges also cross over the new Business Bay Canal with associated road works, consisting of a multitude of access roads, ramps and slipways including the widening and improvement to the existing OUD Metha and 2nd Za’abeel Roads.. Construction of 4.7km 5-lane dual carriageway Ras Al Khor Main Road, extending from the new Fourth Creek Crossing
(Business Bay Crossing) to the limit of work with Contract R800/3B at Za’abeel area. The Project also involves extensive construction of new utility services into specified reservations for water, electrical, telephone and internet lines, irrigation, drainage, sewer and street lighting with two storm water drainage pumping stations. A 40m wide, 842m long dual carriageway underpass (EP-2D) was added to the scope of the Project, comprising about 26% of the original contract value.


• Project Name: Contract R 757/1B (Al Safouh Road Interchange Palm Jumeirah - Access Road)
Dubai - United Arab Emirates
Category: Infrastructure - Roads & Utilities
Value: 178.2 million AED
Job title: Site Civil Engineer (May 2005 - Jul 2006).
Client: Dubai Municipality.
Consultant: PARSONS Overseas Limited.
Description: Construction of free flow interchanges along Al Safouh Road and to the Entrance of Palm Island (Jumeirah) including widening of Al Safouh Road and relocation/protection of Services, Construction of a complete new gravity storm water drainage network (9000 LM, Automatic Irrigation and landscaping, Relocation of existing water lines, Relocation of existing Electrical cables 11Kv, 33Kv & 132Kv (approx. 6500 LM), Relocation of ETISALAT and DIC Network (24000 LM of UPVC Pipes) including construction of various types of chambers.

الخلفية التعليمية

بكالوريوس, Engineering
  • في Damascus University
  • سبتمبر 2004

Specialties & Skills

Work Planning
General Construction
civil engineer
Project Management
UTILITIES
BRIDGES
MICROSOFT ACCESS
MICROSOFT WORKS
APPROACH
LIGHTING
TELEPHONE SKILLS
AUTOCAD

اللغات

العربية
متمرّس
الانجليزية
متمرّس

التدريب و الشهادات

concrete technology (تدريب)
معهد التدريب:
BESIX
تاريخ الدورة:
March 2010
المدة:
12 ساعة
Risk management and job safety analysis (تدريب)
معهد التدريب:
BESIX
المدة:
12 ساعة
soil investigation (تدريب)
معهد التدريب:
BESIX
المدة:
12 ساعة
planning and productivity (تدريب)
معهد التدريب:
BESIX
تاريخ الدورة:
March 2015
المدة:
12 ساعة
high rise building (تدريب)
معهد التدريب:
BESIX
تاريخ الدورة:
September 2013
المدة:
12 ساعة
form work and scaffolding (تدريب)
معهد التدريب:
BESIX
تاريخ الدورة:
November 2014
المدة:
12 ساعة

الهوايات

  • Swimming