Total Years of Experience: 31 Years, 8 Months
April 1987
To June 1999
ASSOCIATE ENGINEER.
at P.B.ASSOCIATES
Location :
India
Initially was coordinating between clients and engineers and contractors, and was in charge of getting structural design and drawings done.Myself designed the the structural reinforcements and cement concrete strength under guidance from sir Baabu narayan, for a residential villa, also for a twin house.Except for the architectural drawings, all other aspects like excavation, p.c.c, foundation masonry, d.p.c, walls, lintols, beams, slab, r.c.c.column, steel column, etc were designed, implemented
and supervised by me.After the building was complete measurements for payments was done by me.lastly the total cost of the project was also prepared by me.( I will give more details later, GOD WILLING).
and supervised by me.After the building was complete measurements for payments was done by me.lastly the total cost of the project was also prepared by me.( I will give more details later, GOD WILLING).
January 1982
To December 1982
junior engineer
at Asean techs ljmited
Location :
India
Studying drawings and giving markings to the contractor tostart excavations.After the excavation is complete supervising the concreting of mud mat of the designated mix.Next supervision of footing concrete for designated mix with bolts in place for fixing of stanchions later .Once ground level is reached backfilling of soil is overseen.Then supervision of r. c.c works above ground level (columns). Then beams of concrete around first floor level had to be supervised.In all the above works bill of of quantities had to be made and given to the assistant engineer every weekend, with our opinions and suuggestions to him.(in concreting works bar bending details and its placement had to be given to the barbender.) At this point of time i had to discontinue work because i had to clear the engineering subjects which were pending.
January 1982
To December 1982
junior engineer
at Asean techs ljmited
Location :
India
Studying drawings and giving markings to the contractor tostart excavations.After the excavation is complete supervising the concreting of mud mat of the designated mix.Next supervision of footing concrete for designated mix with bolts in place for fixing of stanchions later .Once ground level is reached backfilling of soil is overseen.Then supervision of r. c.c works above ground level (columns). Then beams of concrete around first floor level had to be supervised.In all the above works bill of of quantities had to be made and given to the assistant engineer every weekend, with our opinions and suuggestions to him.(in concreting works bar bending details and its placement had to be given to the barbender.) At this point of time i had to discontinue work because i had to clear the engineering subjects which were pending.
January 1982
To December 1982
junior engineer
at Asean techs ljmited
Location :
India
Studying drawings and giving markings to the contractor tostart excavations.After the excavation is complete supervising the concreting of mud mat of the designated mix.Next supervision of footing concrete for designated mix with bolts in place for fixing of stanchions later .Once ground level is reached backfilling of soil is overseen.Then supervision of r. c.c works above ground level (columns). Then beams of concrete around first floor level had to be supervised.In all the above works bill of of quantities had to be made and given to the assistant engineer every weekend, with our opinions and suuggestions to him.(in concreting works bar bending details and its placement had to be given to the barbender.) At this point of time i had to discontinue work because i had to clear the engineering subjects which were pending.
Share on Facebook
Share on Twitter
Share Via Email