Expériences professionnelles

Total des années d'expérience :9 years, 2 Mois

Electrical Project Engineer à CMBC
  • Koweït - Al Koweït
  • Je travaille ici depuis septembre 2020

 Build strong relationships with project stakeholders; owner, consultant, main contractor, sub- contractors and material suppliers.
 Supervising the following tasks:
 Assign foremen and labors daily task and focus on top priorities.
 Installation of electrical pipes & wires as per specs and drawings.
 Low voltage activities (parking system, CCTV, data & telecom, security, sound system,
public address, clock system, nursing system, queuing system).
 Installation of DB, MSB, and LT room (Checking size & Number of the Cables, Wires,
Circuit Breakers & Earth Leakage Relays) as per specs and drawings.
 Installing cable trays and cable trunking as per specs and drawings.
 Installing, connecting and commissioning transformers and generators as per specs and
drawings.
 Installing, connecting and commissioning firefighting system (Checking location &
number of the Heat & Smoke Detectors, Controllers & Alarms as per specs and
drawings).
 Installing, connecting and commissioning lighting control system.
 Install and check location & number of the Light & Power points as per specs and
drawings.
 Review drawings and compare to site.
 Perform Megger Test.
 Perform Earthing Test (grounding system & lightning protection system).
 Prepare Load Form.
 Handing over works based on site procedures.

Electrical site engineer à NETS contractor company
  • Koweït - Al Koweït
  • janvier 2018 à mars 2020

 Build strong relationships with project stakeholders; owner, consultant, main contractor, sub- contractors and material suppliers.
 Supervising the following tasks:
 Assign foremen and labors daily task and focus on top priorities.
 Installation of electrical pipes & wires as per specs and drawings.
 Low voltage activities (parking system, CCTV, data & telecom, security, sound system,
public address, clock system, nursing system, queuing system).
 Installation of DB, MSB, and LT room (Checking size & Number of the Cables, Wires,
Circuit Breakers & Earth Leakage Relays) as per specs and drawings.
 Installing cable trays and cable trunking as per specs and drawings.
 Installing, connecting and commissioning transformers and generators as per specs and
drawings.
 Installing, connecting and commissioning firefighting system (Checking location &
number of the Heat & Smoke Detectors, Controllers & Alarms as per specs and
drawings).
 Installing, connecting and commissioning lighting control system.
 Install and check location & number of the Light & Power points as per specs and
drawings.
 Review drawings and compare to site.
 Perform Megger Test.
 Perform Earthing Test (grounding system & lightning protection system).
 Prepare Load Form.
 Handing over works based on site procedures.

Site Engineer à ODASCO at Kuwait Oil Company ( KOC ) project
  • Koweït - Al Ahmadi
  • juin 2017 à septembre 2017

Supervising the following tasks:
> Assign foremen and labors daily task and focus on top priorities. > Installation of electrical pipes & wires as per specs and drawings.
> Installation of DB, MSB, and LT room (Checking size & Number of the Cables, Wires, Circuit Breakers & Earth Leakage Relays) as per specs and drawings.
> Installing, connecting and commissioning transformers and generators as per specs and drawings.
> Installing, connecting and commissioning firefighting system
(Checking location & number of the Heat & Smoke Detectors, Controllers & Alarms as per specs and drawings).
> Install and check location & number of the Light & Power points as per specs and drawings.
- Review drawings and compare to site.
- Perform Earthing Test (grounding system).
- Handing over works based on site procedures.

Instructing and Consluting à Applies Science Univirsity (ASU)
  • Jordanie - Amman
  • février 2015 à juin 2017

- Instructing Science and Math materials - calculus & physics -.
- Instructing lab Engineering materials - applied, control, advance control . control power system,
computer control, smart control, machine l, ll, power l, ll, Etap, matlab, mixed signal and ETIC.

Reserach assitant à Applied Science Univirsity (ASU)
  • Jordanie - Amman
  • octobre 2016 à mai 2017

- Research with Facility on designing and prototyping a new renewable energy system ( Solar
Charging Station ).
- Also, we had the opportunity to build the prototype, We had an excellent efficiency and results by
following ( Plane, Do, Check, Act ) theory by OSHAcademy.

Chief supervisor à Fuddruckers
  • Jordanie - Amman
  • juin 2014 à août 2014

Fuddruckers Restaurant, Amman (Jordan)

supervisor and consultant à Al-Ghosheh Co.
  • Jordanie - Amman
  • juin 2013 à septembre 2013

Supervising on workmen

Éducation

Baccalauréat, power and control engineer
  • à Applied Science University Asu-Head
  • juin 2017
Etudes secondaires ou équivalent, .
  • à Al- Ikhlas Private School
  • février 2012

Specialties & Skills

Positive Thinking
Persuasive Communication
Innovative Thinking
Generating Revenue
Articulate Presenter
CONSULTING
INSTRUCTION
MATERIALS MANAGEMENT

Langues

Arabe
Langue Maternelle
Anglais
Expert

Formation et Diplômes

photovoltaic systems (Formation)
Institut de formation:
Virginia United States of America, Amman (Jordan) certificate of attendance
Date de la formation:
October 2016
Durée:
10 heures