عبدالخالق ادريس درويش, Construction Manager

عبدالخالق ادريس درويش

Construction Manager

Synergy

البلد
العراق - اربيل
التعليم
بكالوريوس, Civil Engineering
الخبرات
13 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 7 أشهر

Construction Manager في Synergy
  • العراق - اربيل
  • أشغل هذه الوظيفة منذ أكتوبر 2023

Overseeing and managing construction projects from inception to completion. responsible for planning, coordinating, and supervising construction projects from start to finish. Work closely with project stakeholders, including architects, engineers, subcontractors, and clients, to ensure successful project delivery on time, within budget, and in accordance with the specified quality standards and regulations.
•EMC (Erbil Media City): Supply, install and commissioning of Water Supply, Fire Fighting, Air Conditioning, Ventilation, and Jet-Fan Systems for MO2 building (9 Floors + 2 Basements).
•Supply and install 2 Lines (1x400mm2) of 33 KV from the Shawes Substation to EMC.

HSE Engineer في Khatib & Alami
  • العراق - الموصل
  • يوليو 2023 إلى ديسمبر 2023

Health, Safety, and Environment Engineer (PART-TIME). Mosul - Al Qayyarah District.
• Fostering a safe and environmentally responsible work environment, implementing comprehensive health, safety, and environmental programs to ensure compliance with regulations and industry standards.
• Conducting risk assessments, incident investigations, and safety training to minimize workplace hazards and protect personnel. Proficient in developing and maintaining safety policies, emergency response plans, and sustainability initiatives.
• Effectively communicating safety procedures through great communication skills and painstaking attention to detail.

Supervisor Civil Engineer في UNDP
  • العراق - الموصل
  • مارس 2017 إلى أغسطس 2023

UNDP (United Nations Development Programme) - Supervision Engineer March 2017 - August 2023.
Funding Facility for Stabilization (FFS) - West-Mosul team
• Managed the successful implementation of 24 projects in Mosul for the FFS, UNDP’s largest infrastructure project worldwide (1.3 bln across Iraq). Projects include the rehabilitation or full reconstruction of the Shifaa complex blood bank, the Radiology hospital, the Ninewa water directorate building, 7 Police Stations, 4 primary and secondary schools and 4 132 KV and 4 33/11 KV substations; 2 road paving projects; 3 sewerage pipeline and 1 culverts repair project. Also supervised projects for the installation of furniture and specialized equipment, and +10 cash-for-work projects.
• Supervised a 30 Mosul-based and international companies to undertake the works above. Ensured compliance with timeline and budget, designs and work plans, health and safety, quality of materials and preventing corruption. Undertook on-site liaison with end-user directorates.
• Supervised 18 quality control engineers (QAQC) during project implementation.
• Drafted and developed Bills of Quantity (BoQs) and designs, scope of works, pricing and price assessments and Variation Orders (VO) where required. Undertook final measurements and ensured completion of ‘punch list’ items, payment documentation and project closure.
• Also, appointed by the UNDP country office in Baghdad to Lead a team of 15 engineers in the distribution and installation of 54 autoclaved shredders (World Bank-funded) for the PHCCs in Northern Iraq cities (Erbil, Duhok, Kirkuk, Sulaymaniyah, and Ninawa). The task involved site preparation for the shredder rooms, liaising with the MoH Focal Persons for each City, overseeing contractors, and conducting end-user trainings.

Site Construction Engineer في Talary Hawcharkh Company
  • العراق - اربيل
  • مارس 2012 إلى يناير 2017

• Construction engineer at Talary Hawcharkh, a company specialized in finishing and cladding of buildings as well as automation products (sliding doors, hydraulic road blockers, road barriers etc.)
• Responsible for all marketing, sales, supervision and accounting works for dozens of projects, including Erbil International Airport direct executive projects and commercial buildings in Erbil, Kirkuk, and Tikrit.
• Managed logistics and shipping on the mentioned projects, ensuring the timely delivery of items like Automation products, Aluminum & PVC materials, and other accessories from across Iraq as well as from Turkey, Iran and China.

Site Civil Engineer في Engla
  • العراق - اربيل
  • سبتمبر 2010 إلى مارس 2012

• Site engineer on the Kavar City project on Shaqlawa road, to construct 60 houses, 17 villas, and two 8-floor recreational complexes (motel, restaurant, swimming pool etc.)
• Responsible for appointing the borders and levels of all the foundations of houses and other facilities, in close collaboration with the company surveyor.
• Supervising the subcontractors during all steps in construction of the houses, from casting to bricklaying, water and electrical supply, sewerage system installation, form works, steel works, roof casting and finishing works (plastering, tiles, painting, decoration etc.)
• Measuring work progress and calculating payments to subcontractors.
• Writing health and safety procedures, ensuring all HSE measures on-site were followed, and reporting on any breaches of the rules and accidents on-site.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Salahaddin University-erbil
  • أكتوبر 2010

Bachelor's degree in Civil Engineering - Dams & Water Resources Department. 2006-2010.

Specialties & Skills

Engineering
Leadership
Teamwork
Project Management
Construction
CONSTRUCTION
INSTALLATION
INFRASTRUCTURE
QUALITY CONTROL
RADIOLOGY
REHABILITATION
AUTOMATION
ACCOUNTING
CASTING
SWIMMING

اللغات

العربية
متمرّس
التركية
متمرّس
الكردية
متمرّس
الانجليزية
متمرّس

التدريب و الشهادات

Health, Safety and Environment (تدريب)
معهد التدريب:
CANADIAN BUNISNESS ACADEMY
تاريخ الدورة:
March 2023
المدة:
12 ساعة
PRINCE 2 (الشهادة)
تاريخ الدورة:
May 2021