Project Manager Engineering Support Eastern Region
Saudi Industrial Property Authority
مجموع سنوات الخبرة :10 years, 7 أشهر
• Supervision of all activities and daily operations in the eastern region through the follow-up permanently and continuously.
• Ensure the implementation of the best strategies to ensure continuous development.
• Set goals for all tasks, and measure the performance of success in its implementation and a follow-up to their own reports.
• Interest in monitoring the work of the managers of the people, heads of departments and supervisors of the different business.
-Supervising the rehabilitation of consultancy engineering offices in the field of prevention and fire protection.
-Operational Risk Reduction and Assessment Project.
-Key Performance Indicators for all industrial cities for engineering activities.
-Developing the guidelines, standards, and conditions of construction in industrial cities.
Architect in the Saudi Industrial Property Authority - Operating Administration and Investor Relations - Engineering Support Department
-Chairman of the Commission on Accreditation of safety and security designs in the factories in all sectors.
-Administrator Accreditation of designs factories in the central sector.
-Supervision of qualifying engineering offices and contractors.
-Follow-up work of the implementation and development of industrial cities.
-Tackle and resolving complaints of investors in the industrial cities.
-Region central industrial city in Al Qassim.
-Building Industrial water in all industrial cities administration.
-Gate Industrial city of Mecca.
Architect Site Engineer in PROGER Engineering & Management International in King Abdullah Project security Planning and development Agency (KAP4) to Ministry of Interior Kingdom of Saudi Arabia by 16 billion riyals.
1. Checking activities on site.
2.Dealing with two sites the first anti-drug directorate area of 220, 000 m, and the second General Administration of Investigation area of 88, 000 m.
3. Checking of Technical Specification for Project.
4. Examining and approving design drawings, shop drawings.
5. Examining and approval of submittals.
6. Design and Proposal 3 Prototype villas for General Directorate
Project Management
Graduation Project: Designed and built a complete model of King Abdullah Center for Research and studies of renewable energy – Grade A (Top grade for the Graduation Project 2013) Designed and built a complete model of an Urban Design FOR Neighborhood – Grade B+ Designed and built a complete model of a hospital for Women and Birth – Grade A Designed and built a complete model of an architectural design of the towers in the King Abdullah Financial Center Parcel 4.09 – Grade A Designed and built a complete model of an architectural design BMW Showroom and Services and Headquarters – Grade B+