Quality Control Engineer
PARCO
Total years of experience :2 years, 1 Months
I join the PARCO paint industry in 2019 as an internee than after six months I have been promoted as a trainee engineer in the same industry and work for one year than i was shifted to the quality control lab in the same industry.
So my total experience is two years.