Work Experience

Total years of experience :4 years, 0 Months

Commissioning Engineer at MAPNA Group
  • Iran
  • January 2010 to January 2011

AL-SADR GAS POWER PLANT/Iraq- baghdad
Click to edit position description Position: Gas turbine Instrumentation and Control System
(I&C) Commissioning Engineer
Tasks:
Responsible for checking signals between Control System and Gas Turbine field devices
Responsible for testing the functionality and protections, as well as tuning and optimizing the
Gas Turbine Operations.

Contractor at MAPNA Group- Nasb Niroo Iran-Ardabil Power plan
  • February 2009 to January 2010

Contractor for Execution of Electric and instrumentation Erection:
Responsibilities include:
I had experience of erection, for following electrical and instruments equipment/systems
Power Transformers erection
*15KV Bus Duct Erection.
*Battery Bank & Battery Charger Panel (with UPS) Erection.
*Installation of RTU, Telecom Panels, Cable pulling of LT and HT grades for various
transformers, motors and switchgears panels in various ratings, and Loop testing.
*MV & LV Switchgears Erection.
*MV, LV Power and Control Cables Routing, Jointing & Termination.
*MV, LV & Control Cable Tray Routing.
*Structural Earthling & Grounding of whole plant.
*installation of (Flow, pressure, & temperature), indicators and transmitters, as well as
Solenoid operated valves,
feed line and airline. On/off & Regulating Power cylinders for suction, delivery and line
dampers of PA, ID, FD.
*Lighting system & Lightning system of whole plant.
*Planning of requirement of raw materials for process
*Preparing BOQ's for Project works.
*Arranging manpower, materials, and tools for site activities.
*Interact with client and consultant.
*Preparing the as built drawing.
*Reporting to project manager and implanting project procedures as per schedule and
preparing report.

Contractor at MAPNA Group-Niroo Pajooh Iran- Aliabad-E Katul, Golestān Power Plan
  • February 2008 to January 2009

Contractor for Execution of Electric and instrumentation Erection:
Responsibilities include:
I had experience of erection, for following electrical and instruments equipment/systems
Power Transformers erection
*15KV Bus Duct Erection.
*Battery Bank & Battery Charger Panel (with UPS) Erection.
*Installation of RTU, Telecom Panels, Cable pulling of LT and HT grades for various
transformers, motors and switchgears panels in various ratings, and Loop testing.
*MV & LV Switchgears Erection.
*MV, LV Power and Control Cables Routing, Jointing & Termination.
*MV, LV & Control Cable Tray Routing.

Contractor at MAPNA Group Iran-Urmia Power plan
  • February 2007 to January 2008

Contractor for Execution of Electric and instrumentation Erection:
Responsibilities include:
I had experience of erection, for following electrical and instruments equipment/systems
Power Transformers erection
*15KV Bus Duct Erection.
*Battery Bank & Battery Charger Panel (with UPS) Erection.
*Installation of RTU, Telecom Panels, Cable pulling of LT and HT grades for various
transformers, motors and switchgears panels in various ratings, and Loop testing.
*MV & LV Switchgears Erection.
*MV, LV Power and Control Cables Routing, Jointing & Termination.
*MV, LV & Control Cable Tray Routing.
*Structural Earthling & Grounding of whole plant.

Senior Electrical Engineer at Zozik Group for Substation Construction
  • to

completely installation of high, medium and low voltage cables, associated equipments, power
transformers, and commissioning anything from a distribution panels to substation
constructions for Iraqi Kurdistan stage (5 & 6) substation projects.
My duties were included:
Supervisor of Electrical commissioning and installation services that are included: power
transformers, Gas-insulated high-voltage switchgears(GIS), cable installation, splices, cable
termination, substation construction, underground cable installation, for:
1. Sulaymaniyah -Taq taq - Substation 33Kv/11kv Stage-5
2. Sulaymaniyah -Ashti - Substation 33kv/11kv Stage-5
3. Sulaymaniyah -Rzgari - Substation(GIS) 132kv/33kv Stage-6
4.Barda qarman - Substation132kv/33kv/11kv Stage-6
5. Sulaymaniyah -Qola Raisi - Substation132kv/33kv/11kv Stage-6
6. Sulaymaniyah -Tangero - Substation132kv/33kv/11kv Stage-6
7. Sulaymaniyah -Ranya - Substation132kv/33kv/11kv Stage-6

at Structural
  • United Arab Emirates
  • to

of whole plant.

Education

Bachelor's degree, Electric Engineer
  • at Urmia University

Specialties & Skills

CABLEADO
CONSULTING
CUSTOMER RELATIONS
DELIVERY
EDITING
ENGINEERING
ROUTERS
TELECOMMUNICATIONS

Languages

Arabic
Expert
English
Expert
Turkish
Expert