Electrical Technologist
SADARA Chemical Company
Total years of experience :20 years, 10 Months
The candidates will perform engineering analysis, development, design and control of assigned projects within their
engineering disciplines. Their jobs require that they have training, knowledge, and ability in their engineering disciplines and
a working knowledge of related industry codes and standards. These incumbents will be required to rotate between various
operation, maintenance, and engineering support staff on developmental assignments
this job done in SADARA Company:
- Pre Commissioning & Commissioning Activities.
- SAT Inspection.
- RFI Inspection.
- Witnessing Electrical Testing Activities.
- Pre Commissioning Binder Making.
- Making of Commissioning Procedures.
- Making of Maintenance Procedures.
- Walk down & Punching.
Job Purpose:
Repair electrical faults in the station pink.
Job Requirements:
1. Knowledge and application of safety rules and regulations.
2. The application of laws and regulations of the institution.
Tasks:
1. Receives a work shift observed.
2. Make sure to get the work permit of the stomach to be fixed.
3. Ensure the safety of the work to be done and the health of electrical insulation.
4. Preparing and attending the kit and equipment and electrical equipment necessary to complete the Work.
5. Get on the graphics and maps and instructions necessary electrical repair of holidays observed Rosary.
6. Review and study the drawings and maps and instructions necessary electrical repair work immediately before the holidays.
7. Performs maintenance and repair of electrical equipment during the shift in a sound and safe.
8. Technical co first electric pink in the completion of the work required.
9. Confirmed by the application of work instructions for maintenance of the Model of electrical equipment.
10. Participate in the training of technicians.
11. Solve technical problems or participate in solving.
12. Reads the test methods and the use of electrical test and measurement devices.
13. Cleans and arranges the work area and return the stomach to normal after the completion of the work.
14. Has observed the completion of the Rosary.
15. Write a technical report on the damage done during the hours of the Rosary.
Technician 14Oct’2008 - up to this time
1- Responsible of the corrective and preventive maintenance of the electrical equipment at SWCC-Reverse Osmoses Plant.
2- Carries out preventive maintenance of the high and medium voltage vacuum switchgears, bus coupler, feeders, 15 X 2.45 MW 13.8 KV High pressure pump drive motors, 3 X 1.40 MW 13.8 KV Filtered water pump motors, 2 X 425 KW Backwash pump drive motors and its auxiliaries.
3- Conducting preventive maintenance of the 2 X 63 MVA 230KV/13.8KV Main power transformers,
4- 7 X 2.50 MVA 13.8KV/480V Auxiliary power transformer, MCC, UPS, Battery charger and inverter panel, station batteries, OHC, Compressors and blowers.
5- Responsible of the inspection, calibration, routine maintenance of the protection relays of drive motors, transformers and thermal overload relays in low voltage MCC.
6- Responsible of the motor overhaul of all 480V drive motors from fractional to the largest motor in the plant.
• Arabian Pipe Company ( SAW - Project ) in Jubail
Oct’2005 - Jan’2007 as Electrical Technician in A.P.C. Co. for 16 months up to now on the job
Electrical Maintenance Division / Electrical work shop (Foreman)
1- Electrical troubleshooting & maintenance
- PLC Panel trouble shooting
- M.C.C. Panels
- Motors maintenance & repairing.
2- Electronic troubleshooting.
- Electronics cards & components troubleshooting & repairing
Yusuf Bin Ahmed Kanoo Co.
Jul’2003 - Sep’2005 as Sales in Kanoo Co. for 28 months
-Security System Division (Sales Representative (
1- Electronics Security such as: Access Control System, CCTV Surveillance Systems, Metal Alarm Detectors Systems, Intruder Alarm Systems, Fire Alarm Systems.
Education of Technical Academy ( Institute of Navy Education ) Period 3 months Feb’2002 - May’2002