Abdullatif Al-Abdullatif, PROJECT ENGINEER Offshore Fabrication and Installation of Pipelines, Jacket and Deck Platforms

Abdullatif Al-Abdullatif

PROJECT ENGINEER Offshore Fabrication and Installation of Pipelines, Jacket and Deck Platforms

In-Kingdom Fabrication Unit

Lieu
Arabie Saoudite - Dammam
Éducation
Master, Engineering & Management
Expérience
35 years, 6 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :35 years, 6 Mois

PROJECT ENGINEER Offshore Fabrication and Installation of Pipelines, Jacket and Deck Platforms à In-Kingdom Fabrication Unit
  • Arabie Saoudite - Province de l'Est
  • Je travaille ici depuis avril 2010

• Assigned as NA PD/OPD Representative leads the team for preparation the Capital Project Business Process Master List BPML for Enterprise Project Management Program EPM and anticipated in various workshop, session and seminar for finalizing the final version of BPML.
• Contributed. And anticipated in the Enterprise Project Management EPM Program headed by Project Management Office Department PMOD
• Responsible as a lead Project Engineer "on various BI's:3026, 3040 and 3042 Offshore Maintain Potential / OPD projects.
• Supervise a team of engineers and site superintendents for fabrication, installation and start-up of offshore platforms/Jackets & PDM-Decks.
• Completed Aramco Offshore Facility:Zuluf-440 PDM deck with zero exception items "It is the first time executed at Star Fab.Yard/Dammam"
• Incorporated from detail design of offshore facilities up to commissioning and startup /hydrotesting /top side hook up and SCADA integration for Aramco oil production platforms located at Safaniyah, Zuluf, Marjan, Hamur, Qatif, Manifa, Berry and Abusafah oil fields in Saudi Arabia
• Anticipated in SOW preparation, flow diagram, sizing of safety control valves, control and metering devices, and ILI/instrumentations design
• Completed ahead of schedule the fabrication of Zuluf-490/499, Zuluf-480/489 and Zuluf-440/449 PDM Decks and Zuluf-500/509 Jacket.
• Executed the design and installation of the hookup of Multiphase flow meters in various offshore platforms and integrate the controls
• Resolve and trouble shooting of multi-disciplines: conceptual design, materials and offshore fields construction and operation problems.
• • Participated in the construction completion of the Offshore/Onshore Trunkline No 10 from Tie-In Platform Safaniyah TP 17 to Saf.Gosp-1
• Initiated and performed various SRC papers to increase AEL, New Contract / Amendments and Info. Item for Change Order for VIP approvals

PROJECT ENGINEER OFFSHORE GEOTECHNICAL INVESTIGATION/SERVICES à Saudi Aramco
  • Arabie Saoudite - Province de l'Est
  • novembre 2007 à avril 2010

\• Assigned as a Geotechnical Investigation Soil Boring Project Engineer "on different BI's:8299, 3008 and 3009 offshore OPD projects.
• Participated to study and evaluate the subsea surface soil conditions for new offshore platform proposed locations" PDM-Deck Module/TIP".
• Identified characteristics of the soil parameters by Gathering / correlations soil data, pile friction analysis and obtain the ultimate axial capacity, Schematization Of Soil Stratigraphy, coefficient of lateral for offshore Pile foundation design by bearing capacity /settlement analysis.
• Anticipated in Drilling Rig Jack up penetration analysis / settlements by engineering assessments for offshore oil and gas production wells.
Performed Mud mat analyses study, shallow footings, time aging, loading rates effects and detailed liquefaction analysis in the test reports.
• Completed ahead of schedule the conceptual design study for offshore single gas well platform "deck/jacket "structures "Tripod and Monopod " for offshore observation/evaluation wells at Manifa Development Program and Qatif and Abu-Safah "Oil, Gas and Hydrocarbon Fields".
• Executed the design detailed engineering drawing package for 3-4 legs single well offshore platform jacket for Qatif -1003 and 1004 observation well which will be converted to a production well in the near future with all associated circumstances for future business use.
• Solved and trouble shooting of multi-disciplines: DBSP, design, materials and offshore fields construction and operation problems.
• Developed and Improved the new geotechnical investigation contract "special type of contract" for excellence which leads to cost saving / cost effectiveness ($60, 000, 000), geotechnical investigation study effectiveness and ease of handling, operations and constructability.

Sr. PROJECT ENGINEER (A) (GAS/NGL) Third Party Projects Gas Customers Projects Support Unit à Aramco/Northern Area Project Dept. NAOO & BGP Project Division
  • Arabie Saoudite - Province de l'Est
  • avril 2007 à novembre 2007

• Provided technical and engineering support services for different BI's projects, to GAS /NGL Planning & Domestic Marketing Department and their customers and Minimized Saudi Aramco cost to customers and adhered to contract agreements "cost effectiveness for the three parties".
• Ensured all documents are complying with engineering and construction agreement with customers and in compliance with Aramco standards.
• Anticipated on managing, supervising and leading both engineering (GES) and construction contractors hired by the third party customers.
• Ensured all customers works are in compliance with Saudi Aramco standards, specifications, practices, rules and contractual requirements.
• Assigned as a field coordinator for the GAS /NGL customers with various Saudi Aramco organizations agencies and resolved field's problem.
• Supervised the design and construction phases for various custody metering facilities skids and associated piping, valves and vessels in different chemical /hydrocarbon plants and manufacture at Royal commission /Jubal and Yanbu industrial cities at kingdom of Saudi Arabia.
• Key role in minimizing customer's schedules and material delays, cost overrun, cash flow and solving daily design and construction problems.
• Solved and trouble shooting of multi-disciplines engineering, execution, controlling, monitoring, staffing and material procurement problems.
• Advised customers of Aramco most strategic long lead planning requirements which is allowing him to maximize his time and manpower.
• Leveled customer's resources to properly plan and execute their metering system project to meet his on-stream production demands on time.
• Developed the timely review meeting agenda and the 2007 Unit Role of Functions, Responsibility and Authority presentation for the unit head.
• Settled the job satisfaction with harmonic relationship between the Royal Commission customers and Saudi Aramco executive managements.

CONSTRUCTION PROJECT ENGINEER à Northern Area Project Dept. OPD/ Offshore Project Division
  • Arabie Saoudite - Province de l'Est
  • mars 2006 à avril 2007

• Worked as a High Integrity Protection System engineer for offshore platforms" Hips' Manager "on different BI's:8289 and 8299 projects.
• Anticipated on Quantitative Risk Assessment "QRA" to determine the risk gap and SIL protection levels and risk assessments analysis for HIP.
• Assigned as a coordinator of Prel. Hazard Analysis "PHA" and HASOP study for HIPS design, material procurements and implementation.
• Performed Life-Cycle Cost Benefits Analysis "CBA" for all options to bridge the risk gap for PRV, ESD, Logic Solver, trans. gauges/ HIPS.
• Completed multi-projects instrumentals design works for Multi Phase Flow Meters, P&ID, ESD, ILDS, RTU, CIU, ISS, IIS, and IPL & EWD.
• Assisted as Material Procurement Engineer reported directly to project manager, to pursue DC and SAM's materials delivery ETA on time.
• Solved and trouble shooting of multi-disciplines engineering, construction, material and procurement problems from engineering view point.
• Developed the Offshore Project 2006 Accomplishments presentation for the division head for the annual department final events meeting.
• Reviewed the progress reports of RFQ, TBE, NMR & P.O placed for submarine pipelines and Sub Sea piping system material elements.
• Resolved different instrumentals, material, technical, mechanical, engineering, construction and managerial problems among OPD projects.
• Reviewed and settled the submarine pipelines design laying alignments and Sub Sea cables alignments and jacket /deck platform installation.
• Anticipated on Positioning Vessel for deep and Shallow Water Spread (DP Spread) and ensured about off /Onshore Lab. testing equipments.
• Incorporated on DB- Vessels/Marine inspection, Marine crews and Survey personnel qualifications and approvals by Rig Move Masters.
• Resolved all Back up unplanned conditions such as Supply boat availability, Drilling Pipe sticking and offshore drilling equipments conditions.

SR. OPERATION PROPONENT REP. à saudi aramco
  • Arabie Saoudite - Dammam
  • mars 2006 à avril 2007

SR. OPERATION PROPONENT REP. Qatif and Abu-Safah Development project program”Q&ADPP”

• Displayed dedication in the performance of an essential role as Sr. Operation Rep. for Qatif &Abu -Safah DPP.
• Demonstrated strong technical ability in pipelines engineering and operation functions.
• Supervised the overall construction phases for Qatif Downstream D/S Pipeline project (BI-3020, 3021 & 3029).
• Reviewed & approved construction detailed procedures, IFC drawings, hot tap cal., caliper run reports…etc.
• Developed the start up/commissioning ope. Procedure for sour gas & oil P/L with progressive, timely safety successes.
• Achieved Photostat books, Main & Oper. Manual, OIM agreement and Project data Records for Qatif D/S P/L project.
• Performed well in the completion of quality work under tight, high pressure schedule with great effectiveness.
• Initiated valuable contributions in the new method for EIMS Electronic Excepting item Management system output.

CONSTRUCTION LEAD PROJECT ENGINEER Hawiyah, Haradh and Hawtah à Aramco/Pipeline Project Dept. Oil and Gas Upstream Project
  • Arabie Saoudite - Province de l'Est
  • juillet 2004 à mars 2006

07/04 - 03/06 Aramco/Pipeline Project Dept. Oil and Gas Upstream Project. Division Saudi Arabia

CONSTRUCTION LEAD PROJECT ENGINEER Hawiyah, Haradh and Hawtah (central Arabia) projects

• Assigned as a lead project engineer on different BI's:8289, 8287and 8290 projects.
• Trouble shooting of multi-disciplines hydrocarbon piping boostering projects problems.
• Implemented effectively integrated material reconciliation process and quality program -cost saving.
• Resolved different operational, material, technical, mechanical and managerial problems.
Developed a tracking tool of "master construction plan" to pursue the existing and the future projects.
• Settled difficult design pipelines changes during construction and material substitution problems.
• Assigned to work as lead scheduling engineer for Oil and Gas Upstream Projects Div. /PPD.
• Proposed to work as lead engineer for Hawiyah projects Unit / Oil and Gas Upstream Projects Div. /PPD.

General Manager à Saudi Construction house
  • Arabie Saoudite - Province de l'Est
  • janvier 1990 à février 2005

General Manager of company

SR. OPERATION PROPONENT REP. Qatif and Abu-Safah Development à Aramco/Northern Area Pipeline Operation Dept
  • Arabie Saoudite - Province de l'Est
  • juin 2003 à juillet 2004

06/03- 07/04 Aramco/Northern Area Pipeline Operation Dept. (NAPD) Saudi Arabia

SR. OPERATION PROPONENT REP. Qatif and Abu-Safah Development project program"Q&ADPP"

• Displayed dedication in the performance of an essential role as Sr. Operation Rep. for Qatif &Abu -Safah DPP.
• Demonstrated strong technical ability in pipelines engineering and operation functions.
• Supervised the overall construction phases for Qatif Downstream D/S Pipeline project (BI 3020, 3021 & 3029)
• Reviewed & approved construction detailed procedures, IFC drawings, hot tap cal., caliper run reports etc.
• Developed the start up/commissioning ope. Procedure for sour gas & oil P/L with progressive, timely safety successes.
• Achieved Photostat books, Main & Oper. Manual, OIM agreement and Project data Records for Qatif D/S P/L project.
• Performed well in the completion of quality work under tight, high pressure schedule with great effectiveness.
• Initiated valuable contributions in the new method for EIMS Electronic Excepting item Management system output.

CONSTRUCTION PROJECT ENGINEER à Oil and Gas Upstream Project
  • Arabie Saoudite - Province de l'Est
  • décembre 1998 à juin 2003

12/98 - 06/03 Aramco/Southern Areas Project Dept. Oil and Gas Upstream Project. Division Saudi Arabia

CONSTRUCTION PROJECT ENGINEER
• Introduced new method for welder's improvement by internal QA/QC inspector audit meetings.
• Developed new technique for controling accounting for invoice billing.
• Upgrading safety level to seller contractors by internal safety audit report.
• Trouble shooter of operating, material, technical, mechanical and managerial problems.
• Achieved various special hydrocarbon projects under emergency shoutdown program.
• Initiated new method for obtaining fast ultra-sonic readings output.

DESIGN PROJECT ENGINEER à Aramco/Pipeline Project Dept. Oil and Gas Upstream Project Division
  • Arabie Saoudite - Province de l'Est
  • juin 1995 à décembre 1998

6/95 - 12/98 Aramco/Pipeline Project Dept. Oil and Gas Upstream Project Division. Saudi Arabia

DESIGN PROJECT ENGINEER
• Introduced new technique of Cylindrical Corrosion Barrier (CCB)
• Resolved design change and material substitution problems.
• Improved efficiency of design work of GES contractors.
• Cost effective saving to PMT through negotiations by new approach.
• Developed a tracking master design program for future releases.
• Introduced new technique of positive seal coupling.

CONSTRUCTION PROJECT ENGINEER à Aramco/Pipeline Project Dept
  • Arabie Saoudite - Province de l'Est
  • décembre 1994 à juin 1995

12/94 - 6/95 Aramco/Pipeline Project Dept. Maintain Potential Project. Division Saudi Arabia

CONSTRUCTION PROJECT ENGINEER
• Assigned as a lead project engineer on close-out phase of Qurayyah seawater Injunction project.
• Trouble shooting of multi-discipline hydrocarbon piping boostering projects problems.
• Implemented effectively integrated material reconciliation process-cost saving.

COATING & WELDING ENGINEER/Consultant à Aramco/Consulting Services Dept
  • Arabie Saoudite - Province de l'Est
  • janvier 1994 à décembre 1994

01/94- 12/94 Aramco/Consulting Services Dept. Saudi Arabia

COATING & WELDING ENGINEER/Consultant
• Provided consultation to field engineers with technical assessment.
Assisted in coating paint & material selection criteria for various projects & Facilities.

MATERIAL ENGINEER/Consultant
• Assisted in the resolution of the problems to material quotation from the field.
• Trouble shooting of materials problems & provided recommendation for disposition of engineering waiver.

CORROSION ENGINEER/Consultant
• Introduced newly highly techniques used for corrosion control system.
• Achieved upmost solution on eliminating & minimizing oxygen exposure of cross country pipelines-preventing corrosion.

CATHODIC PROTECTION ENGINEER/Consultant
• Counseled new technique for well casing process and preventing corrosion.
• Resolving CP problems involved with field engineers and contractors in CP projects.

ROTATING EQUIPMENT ENGINEER/Consultant à Aramco/CSD Rotating Equipment Div
  • Arabie Saoudite - Province de l'Est
  • octobre 1993 à janvier 1994

10/93 - 01/94 Aramco/CSD Rotating Equipment Div. Saudi Arabia

ROTATING EQUIPMENT ENGINEER/Consultant
• Provided technical assistance in the resolution of rotating equipment problems or questions from the field.
• Modified Saudi Aramco Engineering standard & specification to meet rotating equipment needs.
• Analyzed bid requirement & purchase requisition for rotating equipments.

PROJECT ENGINEER à Aramco/
  • Arabie Saoudite - Dammam
  • février 1992 à février 1993

•Anticipated in Drilling Rig Jack up penetration analysis / settlements by engineering assessments for offshore oil and gas production wells.
Performed Mud mat analyses study, shallow footings, time aging, loading rates effects and detailed liquefaction analysis in the test reports.
•Completed ahead of schedule the conceptual design study for offshore single gas well platform “deck/jacket “structures “Tripod and Monopod “ for offshore observation/evaluation wells at Manifa Development Program and Qatif and Abu-Safah “Oil, Gas and Hydrocarbon Fields”.
• Executed the design detailed engineering drawing package for 3-4 legs single well offshore platform jacket for Qatif -1003 and 1004 observation well which will be converted to a production well in the near future with all associated circumstances for future business use.
• Solved and trouble shooting of multi-disciplines: DBSP, design, materials and offshore fields construction and operation problems.
• Developed and Improved the new geotechnical investigation contract “special type of contract” for excellence which leads to cost saving / cost effectiveness($60, 000, 000), geotechnical investigation study effectiveness and ease of handling, operations and constructability.
• Ensured Lab. test reports include: Description of Field investigation Methods and Results/Soil properties correlations and stratification log.

CONSTRUCTION PROJECT ENGINEER à Aramco
  • Arabie Saoudite
  • janvier 1991 à février 1992

01/91 - 02/92 Aramco/Pipeline Projects Dept. Saudi Arabia
CONSTRUCTION PROJECT ENGINEER
• Developed sub-codes unit rate estimating software.
• Introduced Prefixing CAD-welding cables of cathodic protection and splice boxes.

MANAGER OF TECHNICAL ENGINEERING AFFAIRS à Saudi Government
  • Arabie Saoudite - Province de l'Est
  • décembre 1988 à janvier 1991

12/88 - 01/91 Saudi Government/Ministry of Mun. General Directorate of Project Dev. Saudi Arabia
& Rural Affairs / Engineering Tech. Dept.

MANAGER OF TECHNICAL ENGINEERING AFFAIRS
• Managed as a Consultant Engineer (Supervision work of the Division) at Building & Construction Technology & Services Div..
• Supervised as a group leader engineer for construction, structural, mechanical & electrical.
• Initiated a typical village projects in the Eastern Region of Saudi Arabia.
• Practiced an adequate knowledge about their philosophy, priorities, policies and purposes.

Éducation

Master, Engineering & Management
  • à King Fahd University of Petroleum
  • septembre 1990

Master's Degree in Construction Engineering & Management (Project Management) at King Fahd University of Petroleum & Minerals (KFUPM) 1990, Dhahran, Saudi Arabia.

Baccalauréat, E Structure & Civil Engineering
  • à University of Petroleum & Minerals
  • janvier 1985

Bachelor's Degree in A/E Structure & Civil Engineering at University of Petroleum & Minerals (U.P.M), 1985, Dhahran, Saudi Arabia (5 years degree course: 62 credits in Civil Engineering)

Specialties & Skills

Consultancy
Project Management
Offshore Project Management
Project Engineering
CONCEPTUAL DESIGN
ENGINEER
HYDROCARBON
MANAGERIAL
OFFSHORE
PIPELINE
PROJECT ENGINEER

Langues

Anglais
Expert