Handle engineering activites for oil and gas projects in Pakistan

Chief Executive Officer في Shahid Consulting Engineers
  • باكستان - لاهور
  • ديسمبر 2014 إلى أكتوبر 2015

Setting up the engineering company to serve oil and gas sector in Pakistan and Middle East

Engineering Manager في Etimaad Qatar
  • قطر - الدوحة
  • نوفمبر 2014 إلى ديسمبر 2014

Reviewed detail design of project like EPIC of new EDC sales tank for Qatar Vinyl Company. The engineering was done by engineering contractor. corordinated with engineering contractor and client

EPM Consultant في Shahid Consulting Engineers
  • باكستان - لاهور
  • يناير 2014 إلى أكتوبر 2014

Provide engineering and project management to various companies dealing in oil and gas secto

Manager Design في Haseeb Waqas Engineering Ltd
  • باكستان - لاهور
  • يونيو 2013 إلى ديسمبر 2013

Supervise team of engineers and drafting personnel for all engineering activities for the group

Independant Consultant في Oil and Gas Sector
  • باكستان - لاهور
  • سبتمبر 2010 إلى مايو 2013

Supervise team of engineers for Process design, Mechanical design, Electruical design, Civil /Structural Design and Instrumentation design with respect to oil and gas sector. Responsible for overall design of project. Provide technical support to companies dealing in oil and gas sector

Acting Engineering Manager في AKP Engineering Consulting Company
  • المملكة العربية السعودية - الشرقية
  • نوفمبر 2009 إلى أغسطس 2010

Supervising team of engineers for engineering works for Saudi Aramco and other oil& gas industry in Eastern Province. Reviewing proposal with Bussiness Develpoement . Montoring planning and Control actvities for projects

Manger Mechanical Design في Pak American Fertilizer Ltd
  • باكستان - لاهور
  • مايو 2009 إلى أكتوبر 2009

Supervised team of engineers for mechanical design of Single Super Phosphate Plant at Haripur and handled debottlenecking project

Sr. Manager Design في Descon Engineering Ltd
  • باكستان - لاهور
  • يوليو 2008 إلى مايو 2009

Supervised team of desihgn egineer for design of pressure vessels and heat exchangers for differeent clients

Engineering Manager في Speciality Process Equipment Corporation
  • باكستان - لاهور
  • أغسطس 2007 إلى أبريل 2008

Handling engineering activity which involves process design, mechanical design and E&I design for gas processing Plant . The work includes followings:
Development of PFD & P&IDS
General Arrangement Drawings
Static Equipment Design and Fabrication Drawings
Piping Design
E&I design
The Company is handling EPCC Project. Engineering is providing procurement and Construction support

Manager/Princpal Engineer في JGC-DESCON ENGINEERING LAHORE PK
  • باكستان - لاهور
  • سبتمبر 2006 إلى يوليو 2007

Supervise team of Mechanical engineers for design of Static Equipment and Selection of Rotating Equipment . Conduct bid tabulation, Bid Evaluations and Vendor Document Review . Handle proposals for the mutidiscipline jobs. Worked on Fertil proposal and project has been awarded to the Company. Act as P roposal Manager.n Worked on following softwares:
Pvelite 2007
HTFS
Compress

Project Manager في Saudi Consulting Company
  • المملكة العربية السعودية - الشرقية
  • أغسطس 2004 إلى أغسطس 2006

Supervising taem of engineers and drafting personnel for saudi Aramco Projects. Handled Shy-1, Phase1 IPS#6 project. This is new NGL pupmp station on NGL pipeline from Shedgum Yanbu.

Experienced in process piping design and Static Equipment design. Familiar with relevant industry codes. Familiar with ARAMCO Engineering Standards and DEP Shell International

Lead Engineer Mechanical Design في Descon Engineering Ltd
  • باكستان
  • يوليو 2002 إلى فبراير 2004

Supervise Mechanical design of static equipment like Pressure Vessels, Exchangers, Tanks and Others.
Used PV Elite & presently Compress Build 6210 being used for design of Pressure Vessel and Heat Exchanher.Familiar with ASME VIII Div 1&2, BS 5500, ANSI, API standards. Evaulating pressure vessel nozzles as per WRC 107.Used API 620 & 650 for sttorage tank design. Prepared specifications of materials for the projects. Follow up of fabrication drawings for the equipment. Familiar with Autocad 2000.Familiar wth Stress Analysis. Future programme to use Vessel drafting software to prepare fabrication drawing by software. Presently also acting as Design Project Manager for stamped coded pressure vessels, Exchangers, tanks and Air coolers etc

Engineer1 Mechanical (Design) في Saudi Aramco Shell Refinery Aljubail,K.S.A
  • باكستان
  • يونيو 1997 إلى يوليو 2001

Job function includes design of piping and equipment for the projects .Followings are the major activities.
1.0 Prepare requisitions, data sheets and design calculations for equipment i.e Columns, vessels and exchangers etc.
2.0 Carry out basic design and detail design for projects
3.0 Check and verify design work done by contractor
4.0 Select piping classes for piping and route piping in existing plant.
5.0 Handle special requests for design problems in existing plant i.e Asbestos free gaskets, Torque calculations for flanged joints.

Project Co-ordinator في Saudi Aramco Shell Refinery Aljubail,K.S.A
  • المملكة العربية السعودية - الشرقية
  • يوليو 1993 إلى يونيو 1997

Job function includes follow up of projects starting from conceptual design through detail design, project planning, execution and commissioning.Followings are main activities.
1.0 Follow up basic and detail design in consultation with Technology, Operations and Engineering departments.
2.0 Bar chart planning of project with Microsoft Project
3.0 Conduct Technical and Safety review of projects
4.0 Follow up ordering and procurement of project materials.
5.0 Follow up construction and commissioning activity.
6.0Technical and commercial evaluation of bids.
7.0 Prepare construction scope for contractors

Project Manager في Saudi Consulting Services Alkhobar,K.S.A
  • المملكة العربية السعودية - الشرقية
  • مارس 1991 إلى مايو 1993

Worked for Saudi Aramco projects in Riyadh Refinery, Rastanura Refinery and Abqiaq facilities.The job function includes following main activities.
1.0 Follow up basic and detail design in consultation with Technical Services and Operations departments.Prepare ITB packages for contractors.
2.0 Carry out stress analysis of piping.
3.0 Supervise team of engineers handling different projects

Senior Engineer في Dawood Hercules Chemicals Ltd, Lahore,Pakistan
  • باكستان
  • مارس 1984 إلى مارس 1991

Worked as incharge Projects and Engineering Sections. Supervised team of Engineers and designers. Main activities are included as followings.
1.0 Handled projects covering design, procurement and construction.
2.0 Co-ordinated engineering and procurement activities of Ammonia/Urea revamp project with M.W.Kellogg U.K and Urea Technologies Inc. U.S.A in London.

Maintenance Co-ordinator في National Refinery Ltd,Karachi,Pakistan
  • باكستان
  • يناير 1978 إلى فبراير 1984

Supervised team of Engineers, Foremen and Technicians for Fuel Refinery, Oil Movement and Kemari Terminal.Main activities are as under.
1.0 Follow up critical maintenance activities. Plan and repair major overhaul of rotating and stationary equipment.
2.0 Follow up preventive maintenance and co-ordinate turnaround.
3.0 Supervised execution of projects in the area under control

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في University of Engineering &Technology
  • يناير 1974

Grauate Mechanical Engineer. B.Sc Degree.

Specialties & Skills

Detail Design
MS Project
Refinery
Code Calc 6.2,PV Elite 5 ,Simflex . C ompress Build 6268
MS project, MS office ,Internet
Bolt Load Calcuations

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس
العربية
متوسط

العضويات

Pakistan Engineering Council
  • Professional Engineer
  • December 1979
The Institution of Engineers Pakistan
  • Member Mechanical
  • March 1989

التدريب و الشهادات

certificate (الشهادة)
تاريخ الدورة:
February 1989
صالحة لغاية:
February 1989
certificate (الشهادة)
تاريخ الدورة:
May 1981
صالحة لغاية:
May 1981
certificate (الشهادة)
تاريخ الدورة:
May 1980
صالحة لغاية:
May 1980