PETARC
Total des années d'expérience :0 years, 0 Mois
Project :
Overall Protection of Distribution Transformer using Microcontroller
•Mini Project :
Load Protector with Remote Switching Facility
ACTIVITIES DONE AT SITE
•CONSTRUCTION AND MAINTENANCE OF OHL
• Stringing and tensioning of HT/LT Lines NETWORK, Earth wire 7/10 or 7/3.15 stranded steel Earth wire as per standard.
•ATTENDING OHL PATROLLING, reporting the anomalies in the OHL
•ATTENDING BREKDOWN WORK AND MAINTENANCE WORKS
•ARRANGING MATERIALS FOR THE OHL WORK AND ACCOUNTING IT PROPERLY.
•INSTALLATION OF NEW CABLE, CABLE JOINTS AND TERMINATIONS
• INSTALLATION OF 11 KV NETWORK CABLE, TRANSFORMER AND SWITCH GEAR ETC.
•TESTING AND COMMISSIONING OF OHL
•OPERATION AND MAINTENANCE OF 220 KV SUBSTATION
•MAINTENANCE OF POWER TRANSFORMERS UP TO 160MVA
•MAINTENANCE OF BREAKERS, ISOLATORS, LA’ CTS, CVTS, ETC.
TRAINING COMPLETED
Project :
Overall Protection of Distribution Transformer using Microcontroller
•Mini Project :
Load Protector with Remote Switching Facility
Installation of 11 Kv Network cable, Transformer and Switch gear etc.
•Operation and maintenance of 220 kV substation
•Installation and Maintenance of power transformers up to 160MVA.
•Maintenance of 220kV, 110kV and 11kV equipment’s such as Breakers, isolators, LA’s, CTs, CVTs, etc.
•Power equipment testing devices such as Megger up to 5 Kv, Breakdown Voltage
JOB DESCRIPTION:
•Construction of 110/220 KV Transmission Lines.
•Testing and commissioning of Overhead lines (OHL).
•Conducting the routine preventive maintenance and upkeep of the transmission tower and feeder through line patrolling and attending breakdown maintenance of OHL in case of an eventuality.
•Stringing and tensioning of HT/LT Lines Network as per standard.
KOCHI INDIA
• BASIC APPROACH TO TRANSMISSION SYSTEM (O&M OF SUBSTATION &TRANSMISSION LINES
KOCHI INDIA
• BASIC APPROACH TO TRANSMISSION SYSTEM (O&M OF SUBSTATION &TRANSMISSION LINES
in
in
in
in
from
from