ابوبكر عبد الرحيم كبيل عوض كبيل, Civil Engineer

ابوبكر عبد الرحيم كبيل عوض كبيل

Civil Engineer

Mouchel

البلد
المملكة العربية السعودية - الرياض
التعليم
ماجستير, Civil Engineering
الخبرات
21 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 9 أشهر

Civil Engineer في Mouchel
  • المملكة العربية السعودية - جازان
  • أشغل هذه الوظيفة منذ مارس 2013

working as senior civil engineer with supervision team for the project completion of coastal road (alsheq/altwal) and other secondary roads at Jazan District.. for 7 month working as Acting RE for same project (June 2014 - January 2015).

Civil Engineer في KSA
  • المملكة العربية السعودية
  • يناير 2008 إلى مارس 2013

work with Geo Reference for Surveying and Mapping for supervision projects belong to MOT

Acting Resident Engineer في Georeference
  • المملكة العربية السعودية
  • أبريل 2011 إلى أبريل 2012

In charge of R.E duties for MOT projects Group 7 & 6 at Riyadh district

في Gulf Engineering House (GEH)
  • المملكة العربية السعودية
  • يونيو 2004 إلى ديسمبر 2007

The job included the following:
Preparation of Reconnaissance Survey study for northern border roads, total length 123 km - as part of roads design project belong to Ministry of Transport (MOT) - KSA.
Preparation of reconnaissance survey study for Hail district roads, 273 km - as part of roads design project belong to Ministry of Transport (MOT) - KSA.
Participate in workshops of project (preparation of specifications for urban roads) by paper about Superpave mix design method and (MOMRA) specifications requirements, ministry of municipality and rural affair (MOMRA), KSA, 2004.
Participate as lecturer in the training program for using Superpave mix design in airports for Jeddah Airport Engineers - GEH - Riyadh - KSA.
Study and prepare a plan of developing laboratory of capital blessed (Makah) municipality.
Prepare Reconnaissance Survey study for Mhja/Skaka extending road to Hail/Aljouf Road, total length 20 km.
Participate as lecturer in the training course for roughness measurements - Road Institute

lecturer في Road Institute
  • المملكة العربية السعودية
  • يناير 2006 إلى يناير 2007

Prepare and study of skid resistance in experimental section at Nesah area, Ministry of Transport

Teaching assistance في Sudan University of Science and Tehnology
  • السودان - الخرطوم
  • أغسطس 2002 إلى يونيو 2004

work with Sudan University of Science & Technology as Teaching asistance

Resident Engineer في Alfakhiryah link
  • إلى

charge of R.E duties) for three projects as follow:

Completion of some roads in Riyadh district (group 7), total cost (185, 101, 276 SR).

Completion of some roads in Riyadh district (group 6), total cost (34, 705, 000 SR).

Construction of road and transport department branch in Dawadmi province, total cost (7, 000, 000).


Group 7 project include the following projects:

Execute Completion of Shaqra / Dwadmi Dual road (length 40 km). This road classified as main road based on MOT roads classification. Structural layers consist of 30 cm subgrade, 30 cm aggregate base course, 20 cm bituminous base course and 5 cm wearing course (all asphalt mixtures designed based on superpave method PG76-10).
Execute Completion of Afif / Zulm Dual road (length 30 km). This road classification and structural layers, such as the above-mentioned.
Execute of Alnabwan road (length 21.5 km). This road classified as secondary road based on MOT roads classification. Structural layers consist of 30 cm subgrade, 15 cm aggregate base course, 8 cm bituminous base course and 5 cm wearing course (all asphalt mixtures designed based on superpave method PG 76-10).
Execute of Alsehami / Masadh / Barazan / Abutalha road (length 23.5 km). This road classification and structural layers, such as the above-mentioned.
Agriculture Links include

Civil Engineer في Mouchel Middle East Ltd Company (International Unit)
  • المملكة العربية السعودية
  • إلى

Projects are as following:

Completion of costal Road (Alsheqaq/Altwal) with interchanges and service Road stage one (20 Km). Contractor Bin Ladin Group, project cost 139 million SR.
Completion of costal Road (Jazan/ Almosam /Altwal) (18 Km). Contractor Abdel Alaali Alajmi, project cost 138 million SR.
Repairing of existing routes of Roads their Dualization under construction in Jazan Region (Group 4). Contractor Alauyoni company, project cost 52 million SR.
Construction of two roads from north to south and East to west project at Fifa in Jazan region. Contractor Hassan Hadi Stablishment, project cost 139 million SR.
Converting of Jedah /Jazan Coastal Road to Express Road, the part at Aseer Region (first stage). Contractor Almubty Company, Project cost 60 million SR.
Completion of Construction of two roads from north to south and East to west project at Fifa in Jazan region. Contractor Almubty Company, project cost 29 million SR.
Completion of feeder roads at Jazan Region, Group three. Contractor Almubty Company, project cost 87 million SR.

الخلفية التعليمية

ماجستير, Civil Engineering
  • في Sudan University of Science and Technology
  • مايو 2007
بكالوريوس, Civil Engineering
  • في Sudan University of Science and Technology
  • سبتمبر 2002

Highway and Transport Department), 2002.

Specialties & Skills

Project Work
Pavement Design
University Teaching
Materials Science
Maintenance Management
CONSULTING
ENGINEERING
SUPERVISORY SKILLS

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

Saudi Council of Engineers
  • Professional Engineer Grade - ID 52052
  • February 2011