Azad محمد, Looking for job in UAE As Mechanical Engineer(HVAC)

Azad محمد

Looking for job in UAE As Mechanical Engineer(HVAC)

ON VISIT VISA EXPIRES ON 16th MAY-2018

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, Mechanical
الخبرة
13 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 4 أشهر

Looking for job in UAE As Mechanical Engineer(HVAC) في ON VISIT VISA EXPIRES ON 16th MAY-2018
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ مارس 2018
HVAC Engineer في Gemini cooling systems projects, Pvt.ltd
  • الهند - تشيناي
  • يوليو 2017 إلى فبراير 2018

 Installation of HVAC works and Co-ordination, with Consultant, Architect for Execution of site work and Material Approval.
 Inspection and Supervision on site as per approved shop drawing and coordinating with Supervisors to solve the problem related with Design and Drawing.
 Cooling load & CFM calculation, Air Distribution Design.
 Prepare progress report and other related reports during all stages of constructions.
 Co-Ordination with suppliers to ensures correct and timely delivery of material.
 Man power planning and document controlling then Reporting to the project Manager on daily basis. Follow up and evaluate the daily, weekly and monthly progress reports.
 Assigning Technicians for required Area of work.

Mechanical Engineer في Abdulla Nass & Partners Co.ltd
  • المملكة العربية السعودية - الخبر
  • يوليو 2015 إلى مارس 2017

Material Control Engineer for Piping &Mechanical Equipment’s
TEST PACKAGE PREPARATION FOR MECHANICAL QC DOCUMENTATION.

Mechanical Engineer في M.M.Suppliers& Contractor
  • الهند - حيدر اباد
  • سبتمبر 2014 إلى يونيو 2015

*Site supervision
*daily progress report
*Manpower and equipment allocation
*welder allocation.
*Reporting to site Manager

HVAC Engineer في Fesoul Al Riyadh
  • المملكة العربية السعودية - الرياض
  • مارس 2012 إلى مايو 2014

 Heat load calculation & CFM calculation, Air Distribution Design.
 HVAC Designing and also drafting the projects
 Design of duct sizing, selection of grills & diffusers.
 Interaction / Coordination with Clients & Consultants till the design meet the required design standards & it gets approved.
 Preparation of detailed Bill of Materials and quantities including all Equipment's, accessories with technical specifications for all.
 Preparation of HVAC Data sheet.
 Handing the Approved design to Project Dept for the Execution.
 Visiting Project sites at Pre-design & Approval stages for better design & Ensure our support for the on time Completion of Project.
 To ensure timely completion & quality of work assigned with in assigned date & hours.

HVAC Engineer في Vighnesshwar Air conditioning Pvt.ltd
  • الهند - حيدر اباد
  • مايو 2010 إلى يناير 2012

 Prepare progress report and other related reports during all stages of constructions.
 Co-Ordination with suppliers to ensures correct and timely delivery of material.
 Man power planning and document controlling then Reporting to the project Manager on daily basis. Follow up and evaluate the daily, weekly and monthly progress reports.
 Installation of HVAC works and Co-ordination, with Consultant, Architect for Execution of site work and Material Approval.

الخلفية التعليمية

بكالوريوس, Mechanical
  • في Nimra College of Engineering and Technology. Jawaharlal NehruTechnological University
  • يناير 2010

B.TECH IN MECHANICAL ENGINEERING

Specialties & Skills

Reporting
Inspection
Installation
Progress Reports
AUTOCAD
CUSTOMER RELATIONS
DRAFTING
FUNCTIONAL
LANGUAGES
MICROSOFT EXCEL
MICROSOFT WORD
PLUMBING

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس