Site Civil Engineer
Al Taas Tower Trading and Decoration
Total years of experience :21 years, 1 Months
* As a civil engineer representative, I acts as the liaison between the client and contractor and responsible for ensuring that the project meets the client's specifications, budget, and timeline.
* Member of term that develop cost-effective maintenance plans for buildings and roads to address identified problems, which comprises but not limited to scheduling repairs, selecting appropriate materials and techniques, and estimating project costs.
* Managing maintenance budgets achieving 100% efficient allocation of resources.
* Communicating maintenance needs and plans to stakeholders by developing reports reducing miscommunication.
* Regularly conduct inspections of roads, cross culverts and bridges to identify any signs of damage or deterioration by visual inspection and use of specialized test method when necessary.
* I developed and implemented solutions to maintain and improve employer’s infrastructure, improved operational efficiency by 20%
* I ensured compliance with industry standards, codes, and regulations through rigorous quality control measures during all project phases, reduce operational maintenance cost by 70%.
* Responsible for preparation of cost, manage maintenance projects and renovation contracts and services for on-time completion within budget and specifications.
* Manage facility ground and landscaping activities to facilities users satisfaction.
* Manage asphaltic pavement construction and maintenance for highways and patching, examine, inspect and ensure the quality of the final asphalt product.
* I ensure conformity to design specifications and quality standards
* I monitor quality assurance and laboratory testing for asphalt and reinforced concrete operations.
* I estimated quantities and material costs during project planning to support budgeting and costing.
* I monitored execution of contract work for compliance with design plans and specifications.
* I participated in on-site testing and restoration of facilities.
* Optimized construction schedules, ensuring timely completion.
* I assisted in preparation of comprehensive reports detailing findings from site evaluations, feasibility studies and environmental impact assessments.
* Collaborated with civil engineering technicians to gather project equipment and update maps, drawings.