Solid Control Engineer
Step Oil Tools Company Pakistan Branch
Total years of experience :10 years, 0 Months
• Well Working Experience in Verti-G Cutting Dryer operation, troubleshooting, and maintenance.
• Well Working Experience, Troubleshooting, installation, and uninstallation of auger System.
• Familiar with Filtration Operation and equipment.
• Familiar with the Dewatering process for wastewater stream to reduce slurry on the rig site.
• Am familiar with the installation of Rig Up and operation of Centrifuge on Solid Control mode, Barite Recovery.
• Fully committed to HSE, Permit to Work, and Stop program.
• Fixed & Variable Speed Centrifuges (various) & Hi G Dryer Shakers.
• Augers (conveyors).
• Feed pumps (Seepex pump, Centrifugal pump, Diaphragm pump).
• Agitator motors 10-HP, and Variable gear motors 15-HP.
• Filtration Unit.
• Worked on assisting in the operations of equipment and systems, such as pumping cement into oil well.
• Worked on calculations to determine the amount of cement mix and additives required, using the depth, pressure, volume of cement required.
• Worked on to transport equipment to and from the well location, safely rig in and operate the equipment, perform day to day inspections.
• Monitoring and assessing hazardous and unsafe situations, correct unsafe acts or conditions.
• Promote safe practices at the job site, managing emergency situations.
• Conducting investigations and reporting of all accidents and near misses.
• Watch out the safety of all workers and works to prevent them from hazardous situations.
• Conducting Risk Assessments and their control measures. Supporting the development of OHS policies.
• Safety management system and Carrying out monitoring and review.
• Monitoring and assessing hazardous and unsafe situations, correct unsafe acts or conditions.
• Promote safe practices at the job site, managing emergency situations.
• Conducting investigations and reporting of all accidents and near misses.
• Watch out the safety of all workers and works to prevent them from hazardous situations.
• Conducting Risk Assessments and their control measures. Supporting the development of OHS policies.
• Safety management system and Carrying out monitoring and review.
• Worked on Seismic Signals.
• Worked on Pre-processing, pre-stack and post-stack.
• Worked on Amplitude correction, Frequency filters Deconvolution, CMP-Sorting, Velocity analysis.
• Worked on Stacking, Migration and Post processing.
• Worked in Seismic Survey, Geophone placing, and dynamite holes, Recording system and navigation.
• Worked in Recording truck, source and receiver.
• Worked on assisting in the operations of equipment and systems, such as pumping cement into oil well.
• Worked on calculations to determine the amount of cement mix and additives required, using the depth, pressure, volume of cement required.
• Worked on to transport equipment to and from the well location, safely rig in and operate the equipment, perform day to day inspections.
I worked as an Internee Geophysicist in Seismic Party-3 on Seismic Aquisition, Processing, Geophones, Health and Safety.
I worked on Seismic Aquisition, Geophones .
I have worked as an internee geophysicist in Seismic Department