Senior Land Surveyor
Generic Engineering Technologies
Total des années d'expérience :18 years, 10 Mois
Supervision of all kind of survey activities such as setting out and Leveling of Road work, Parking, Kerb Stones, Sub Base, Road Base Modular Block, Setting out and leveling of sewer lines, communication Lines, construction of main holes, Substations, electrical poles, And Cameras. Setting out of Plants, Trees and Gravel. Setting out And leveling of Concrete work, Steel works, Block work and columns
Project involve the beautification and Safety of Sheikh Al Tani Villa at Original Island near Samisma area, around villa Navigation channel and Base of Cost Guard and also accommodation.Establishment the control Points Inspection with consultant all survey works of sub-contractors. Prepare the weekly and monthly progress report and report to Construction manager. Topo survey of Reclamation using different Kind of Total station and GPS.
Supervision of all activities Earth Works, preparation of executed works, drawings and Auto CAD. Setting out of center line and curves according to approved shop drawings. Layout of setting out lines. Construction works of Roads, Parking, Curb Stones, and Substations. Preparation of Road Profiles and coordinate with consultant for proper execution of project.
Project also involves the construction of associated facilities such as roads, storm drainage works, sewer works, telephone relocation works, electrical cabling works, street lighting works and Irrigation systems etc
Supervision of all kind of survey activities such as topography, taking existing ground levels, preparation of final levels, setting out of different kind of flowers, date palms, trees and designing of different color gravel, road base, tiles etc.
Supervision of all kind of survey activities such as setting out and leveling of Road work, curb stones, heal curbs, setting out of center line of the roads. Setting and leveling of sewer lines, communication lines, construction of main holes, hand holes and electrical poles etc.
Supervision of all activities Earth Works, preparation of executed works, drawings and Auto CAD. Setting out of center line and curves according to approved shop drawings. Layout of setting out lines. Construction works of Under Pass, Roads, Parking, Curb Stones, Retaining Walls, Services Tunnels and Substations. Preparation of Road Profiles and coordinate with consultant for proper execution of project.Project also involves the construction of associated facilities such as roads, storm drainage works, sewer works, telephone relocation works, electrical cabling works, street lighting works and Irrigation systems etc.
Preparation of Data and worked on co-ordinate by referring drawings. Establishment of control points, transferring an elevation drawing. Taking section at different interest and recording on log books, electrical light poles, and signal posts. Connecting to houses renovation of manholes and chambers construction of pump station. All kind of road works, parking areas, footpaths, land Reclamation, kurb stone fixing, parallel parking, heal curbs, inter lock and asphalt etc. The project also involves the construction of beautification facilities such as fountains, sun shelters, kiosk, lighting bollards etc.
Project involves the construction Roads and Parking for the Defense Colony including the construction of associated facilities such as footpath, storm drainage, sewer, telephone, street lighting works and Irrigation systems etc.