AHMED ELSHAFEY, PMO/PMC Resident Engineer

AHMED ELSHAFEY

PMO/PMC Resident Engineer

Khatib & Alami

Location
Egypt - Alexandria
Education
Bachelor's degree, civil & structural engineering
Experience
21 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 9 Months

PMO/PMC Resident Engineer at Khatib & Alami
  • Saudi Arabia - Medina
  • My current job since October 2018

Duties:
• Leads the delivery (time, cost, quality) of assigned package.
• Supervise the contractors to ensure the works are constructed as per specification and to established milestone dates.
• Take corrective action with the Engineer & Contractor to drive to completion.
• Monitor the contractor's progress and assist in the preparation progress reports to the Client.
• Participate in the final inspections of the work with the Engineer and Client.
• Recommend acceptance of the completed work to Client after receiving the same from the Engineer.
• Reviewing weekly and monthly reports presented by the contractor on comments of non-compliance, areas of concern and corrective actions.
• Continuous visits to project site for monitoring of site activities in respect of quality, safety and progress and advise manager representatives of findings, area of concern and corrective action.
• Reviewing and monitoring the contractor’s proposed construction equipment and manpower histogram and advise on any shortage.
• Monitor and drive the final completion of the work and all punch lists.
• Assist at the weekly progress review, SH&E meetings and other progress meetings held at the site.
• Monitor and drive the final completion of the work and all punch lists.
• Communicate with the Project Director and Site Management team continuously regarding the project progress on site.
• Leading the PMC in reviewing and implementing pre commissioning and commissioning plans and following all up at site.

Resident Engineer at NKY ENGINEERING
  • Saudi Arabia - Jeddah
  • September 2014 to September 2018

Project: King Abdullah Ibn Abdulaziz Project For Development of the security facilities KAP-2.
Owner: Ministry of Interior.
Contractor: BEC Emirates International
The Project description:
• Total Area of 1000, 000 (1 million) m2 contain Housing, Medical Center, Education building, Mosque, Theater, Restaurant, Sport Center, Workshops, Stadium, Tribune, Sub-stations, External and Infrastructure works such as (sewer system, firefighting, Irrigation, water network, drainage system and Roads).
• Manage a staff of 45 person (Senior engineers, junior engineers, site inspectors, documents controller, Secretary, and other site staff) Reported to Area Manager who is manage 3 projects in Makkah Area.

Assistant resident engineer at Bureau Veritas
  • Saudi Arabia - Jeddah
  • August 2010 to August 2014

Bureau VERITAS - Saudi Arabia August 2010 - August 2014.
Assistant Resident Engineer
Projects:
1. Jeddah Gate - Abraj AL-Hilal 2 January 2013 till August 2014.
Owner: EMAAR Middle East
The Project discretion:
• 3 high rise residential towers ranging from 19 to 22 storeys.
• 273 modern apartments, penthouses, and duplex penthouses with one to four-bedrooms
• Unit sizes range from 540 sq m to 600 sq m.

2. Holly Haram 3rd Expansion. August 2010 - December 2012.
Duties:
• Encouraging continuous improvement through the measurement and reporting of the key operational aspects to senior manager.
• Providing specialist direction on unusual or difficult engineering issues.
• Liaising with client representatives, other professionals within design teams and contractors’ representatives during construction.
• Carrying out site visits and surveys.
• Monitoring and inspecting the work of sub contractors and other third parties.
• Monitoring environmental protection measures & reporting of any hazards/incidents.
• Ensuring that all engineering activities are correctly casted and the complete design is delivered to the agreed budget.
• Follow & check project budget and time schedule plan.
• Scheduling the project in logical steps & budget time required to meet deadlines.
• Interpreting & explaining plans & contract terms to administrative staff, workers, & clients, representing the owner or developer.
• Preparing contracts & negotiates revisions, changes & additions to contractual agreements with clients, suppliers & subcontractors.

Assistant Resident Engineer at Al-Gurg Consultant. (Dubai, UAE)
  • United Arab Emirates - Dubai
  • July 2009 to July 2010

Project: full Infrastructure services considering detailing of design and execution for the following scope:
•Sanitary Sewage Collecting Systems
•Storage and Water Distribution Systems
•Rain Drainage System
•No of 4 bridges &Road Paving
•Public Street Lighting
•Telecommunications Civil Works
•Gas system.
•Construction cost: US $ 350 million.

- Owner: HIB - Housing and Infrastructure Board (Libya).
- Program Manager: Aecom (USA).
- Contractor: Queiroz Galvao (Brazil).
Duties:
•Check the physical quality and technical specifications of construction materials delivered on-site prior to installation.
•Ensure total quality management on-site are strictly followed as per Approved Design Drawings,
•Construction Standards & QA/QC Procedures to avoid non-acceptance & job repetition/s.
• Check material submittals.
•Coordinate with the contractor regarding Site Inspection & Acceptance of partially completed works including preparation of Request for Inspection (RFI) prior to the next activity.
•Check Technical Query (TQ) for consultant action/s by providing resolution/s to all problems & conflicts encountered on-site.
•Check & monitor sub-contractor's daily activities & accomplishments to ensure completion date/s are in accordance with the approved construction schedule.
•Conduct weekly job site coordination meeting with the concerned Site Engineers, Supervisors to discuss & resolve all open issues encountered on the site.
•Execute the project in conformance with the Approved Design Drawing, Contract & FIDIC Conditions.
•Check shop drawings for Structure and Architecture items.
• Check Excavation drawings (levels & layout) and arrange for equipments.

PROJECT ENGINEER at BESIX CONSTRUCT
  • United Arab Emirates
  • November 2007 to July 2009

-Project: STP & Related Collection & Irrigation system project Client: NAKHEEL
-Consultant: KEO
-In general the works consist of a new STP which be inclusive of grit removal, an inlet pumping station, four MBR modules each capable of treating 55, 000 m³/day of influent (total STP capacity of 220, 000 m³/day),
In addition to the STP the works also consist of collection and irrigation systems made up of both 5325m of gravity and 7980m of forced trunk mains, manholes, chambers and alarmed control system.
Detailed Design, Engineering, Procurement, Installation, Pre-commissioning, Commissioning Services, Operation and Maintenance.
Duties and Responsibilities:
•Check & monitor daily activities & accomplishments to ensure completion date/s are in accordance with the approved construction schedule.
•Subcontractor Coordinator.
•Check& prepare all project material procurement (Request for Quotation, comparison sheet).
•Check shop drawings for Structure and Architecture items.
• Check Excavation drawings (levels & layout) and arrange for equipments.
• Preparing bar bending schedule. (BBS) using Steel Pac software.
• Check material submittals.
•Conduct weekly job site coordination meeting with the concerned Site Engineers, Supervisors, to discuss & resolve all open issues encountered on the site.
•Execute the project in conformance with the Approved Design Drawing, Contract.

PROJECT ENGINEER at NESMA&PARTNERS CONSTRUCTION COMPANY ,LTD
  • Saudi Arabia - Eastern Province
  • September 2006 to October 2007

: 1- YANBU PETROCHEMICAL COMPLEX PROJECT (EFFLUENT, FLARE and INCINERATOR PROJECT).
-Client: SABIC & YANSAB.
-(The project contains ethylene &polyethylene flare, incinerator, Retention basin, fire water tank).
-Responsible for construction of civil work for incinerator, fire water tank).

-SHAYBAH CENTRAL PROCESSING FACILITIES PROJECT (CPF)
-Client : Saudi Aramco
-GAS & OIL SEPERATION PLANT (The project contains infrastructure work for oily and storm water, manhole, pipe network, pipe rack, control BLDG, administration &service BLDG and Steel Structure).

Client / Consultant : ARAMCO & SABIC
Duties and Responsibilities:
-Take full responsibility for the adequacy, stability and safety of all site operations and methods of construction
-Conduct weekly job site coordination meeting with the concerned Site Engineers, Supervisors, & Foremen to discuss & resolve all open issues encountered on the site.
-Execute the project in conformance with the Approved Design Drawing, Contract & FIDIC Conditions.
-In-charge of scheduling daily site activities including scheduling of manpower & equipments.
-Implement project cost effective management for labor, equipments, & construction materials.
-Check the physical quality and technical specifications of construction materials delivered on-site prior to installation.
-Ensure total quality management on-site are strictly followed as per Approved Design Drawings,
-Construction Standards & QA/QC Procedures to avoid non-acceptance & job repetition/s.
- Well understood of the project time schedule and meeting the target dates.
-Subcontractor Coordinator.
-Coordinate with the Consultant regarding Site Inspection & Acceptance of partially completed works including preparation of Request for Inspection (RFI) prior to the next activity.
-Prepare Technical Query (TQ) for consultant action/s by providing resolution/s to all problems & conflicts encountered on-site.
-Check & monitor sub-contractor's daily activities & accomplishments to ensure completion date/s are in accordance with the approved construction schedule.

SITE ENGINEER at ALHUDA ENGINEERING WORKS
  • Qatar - Doha
  • July 2004 to July 2006

Project : Refinery Administration building for QATAR Petroleum (Q.P).
Client / Consultant: QATAR Petroleum (Q.P).
The project contains main building (8 floors), mosque, culvert, canteen building, tank, service plant; infrastructure, landscaping and Fiber Optic line 10 KM.

Duties and Responsibilities:
- Take full responsibility for the adequacy, stability and safety of all site operations and methods of construction
- Conduct weekly job site coordination meeting with the concerned Site Engineers, Supervisors, & Foremen to discuss & resolve all open issues encountered on the site.
- Execute the project in conformance with the Approved Design Drawing, Contract.
- In-charge of scheduling daily site activities including scheduling of manpower & equipments.
- Implement project cost effective management for labor, equipments, & construction materials.
- Check the physical quality and technical specifications of construction materials delivered on-site prior to installation.
- Ensure total quality management on-site are strictly followed as per Approved Design Drawings,
- Construction Standards & QA/QC Procedures to avoid non-acceptance & job repetition/s.
- Well understood of the project time schedule and meeting the target dates.
- Check& prepare all project material procurement (Request for Quotation, comparison sheet).
- Subcontractor Coordinator.
- Coordinate with the Consultant regarding Site Inspection & Acceptance of partially completed works including preparation of Request for Inspection (RFI) prior to the next activity.

CIVIL INSPECTOR at GITEC CONSULTANT
  • Egypt - Cairo
  • July 2002 to July 2004

Project: The 15 VILLAGES SEWERAGE PROJECT FOR THE KAFR ELSHEIKH GOVERNORATE (NOPWASD)
- In charge of supervising and technical / financial Administration Of the construction works.
- The Project consists of complete sewage for 15 villages:
- 11 sewage treatment plants (10 with oxidation ditches and 1 with lagoons system).
- 22 sewage pumping station.
- 40 km force mains DCI pipes of DN 150 up to DN 400.
- 7, 000 manholes circular & square and plain & reinforced concrete.
- 180 km gravity sewers UPVC AND VC pipes DN 175 up to DN 700.
- 800 KM interconnection lines with 29, 000 inspection chambers.

Duties and Responsibilities:
Handling the QC works checking of all activities like the piling has been done properly by the contractors as per the plan, site clearing marking by the surveyor, excavation, backfilling, compacting with the specified material to the required strength and monitor with the third party certified testing company, dewatering as per the method statement, integrity test for piles, and giving comments to the concerned site QC Inspector to monitor as per the method statement, inspection test plan and approved materials as per the specification.

• To ensure that the inspection program is done by the QC inspectors as per the daily program at site.
• To check monthly report of the steel from the supplier is certified by the third party testing company.
• Follow inspection and test plan for the civil, structural and building works and carries out the various stage inspections and tests, record findings, prepare various reports.
• Receive instructions, documents, technical specifications and details regarding civil, structural and building works.
• Preparation of all check lists required for inspection of construction activities.
• Inspection of all construction activities at site like Foundation, Manholes, RC Pits, Elevated Structures & Fire proofing concrete.
• Inspection of construction material according to project specification.
• Inspection of Painting for concrete structure, water proofing of sub structure, flexible and rigid paving.

Education

Bachelor's degree, civil & structural engineering
  • at CIVIL EINGINEER
  • June 2002

Bachelor of Engineering Tanta University, EGYPT, 2002. • Major: Civil Engineering • Course Work Included: Advanced design of Reinforced Concrete and Steel Structures, Project Management and Scheduling, Methods and Equipment of Construction, Construction Materials and Quality Control, Environmental and Sanitary Engineering. Graduation Project: Structure Project with grade Excellent.

Specialties & Skills

Project Management
Oil and Gas
Contract Management
Infrastructure Projects
Civil Engineering
Steel Pac APPLICATION.( for preparing Bar Bending Schedule), Microsoft Offic,e AUTOCAD 2D
Management

Languages

English
Expert

Memberships

Engineers Association
  • yearly
  • July 2002
SAUDI ENGINEERING
  • CIVIL ENGINEERING
  • September 2010

Training and Certifications

veloci (Certificate)
Date Attended:
March 2006
Valid Until:
March 2006

Hobbies

  • swimming,reading,movies