MW Engineer
MOTOROLA
Total years of experience :4 years, 1 Months
•Contributing in network transmission planning.
•Assigning subcontractor for LOS implementation and inspection.
•Revising LOS figures and diagrams prior approval.
•Participating in network transmission design using pathloss program.
•Assigning implementation work to subcontractors.
•Supervising monitoring and controlling work progress and materials supply.
•Commissioning, and testing installed MW materials in the site.
•E1 routing for the site up to the backbone transmission network.
•Troubleshooting network faults on a site by site level.
•Coordinating with RF and BSS team.
•Following up acceptance procedure with the customer until issuing the PAC with coordination with other teams.
Experienced in ADM TELLABS 6340, 6345, 6350 Installation O&M and Troubleshooting.
“STC Project “.Kingdom of Saudi Arabia
-Working in Motorola -MOBILY Project in BAHA in Phase L1B+L2&L+3
-E.0.T (Establish operation and transfer): working in Motorola -MOBILY Project.
-Working in Motorola -MTC(ZAIN) Project in East Region in phase L+0
-Installing New BTS stations using MTC(ZAIN) instruments (Antennas, feeders, Grounding & Water proof)
-Installing the software of the MOTOROLA BTS cabinet. Testing Using Site master (VSWR, DTF, Cable-loss & Return-loss) and Reporting
-Aligning and commissioning of microwave transmission system (ERICSSON MINI-LINK PDH, High Capacity SDH AND NEC (Pasolink)i).
-Perform Traffic Routing and cross connect E1 of BTS to NPU.
-Complete installation of BSC equipments and termination and cross connection of E1’s.
-Establish operation and transfer. (EOT) engineer for MW.
-Acceptance test procedure (ATP) for MW.
-Provisional acceptance test (PAT) for MW.
-Deal with the Operation and Maintenance Centre OMC For clearing daily alarms (On call).
-Manage a group of technicians to improve the quality of network
-Testing E1's & Making cross connection's E1's between all sites.
-Maintenance down Time (MDT s) of the sites.
-Inspection of the Quality of new installed sites.
-Responsible for the PATs (Preliminary Acceptance Tests) & FATs (Finally Acceptance Tests) & OIL clearance with MTC (ZAIN)
-Inspection of the Quality of new installed sites.
-Responsible for the PATs (Preliminary Acceptance Tests) & FATs (Finally Acceptance Tests) & OIL clearance with mobily.
-Making Software Upgrade by BFTB server to all T.N (2p, 6p & 20P)
-I have experience in Line of Sight (LOS).